• 제목/요약/키워드: process scheduling

검색결과 802건 처리시간 0.087초

조선소 병렬 기계 공정에서의 납기 지연 및 셋업 변경 최소화를 위한 강화학습 기반의 생산라인 투입순서 결정 (Reinforcement Learning for Minimizing Tardiness and Set-Up Change in Parallel Machine Scheduling Problems for Profile Shops in Shipyard)

  • 남소현;조영인;우종훈
    • 대한조선학회논문집
    • /
    • 제60권3호
    • /
    • pp.202-211
    • /
    • 2023
  • The profile shops in shipyards produce section steels required for block production of ships. Due to the limitations of shipyard's production capacity, a considerable amount of work is already outsourced. In addition, the need to improve the productivity of the profile shops is growing because the production volume is expected to increase due to the recent boom in the shipbuilding industry. In this study, a scheduling optimization was conducted for a parallel welding line of the profile process, with the aim of minimizing tardiness and the number of set-up changes as objective functions to achieve productivity improvements. In particular, this study applied a dynamic scheduling method to determine the job sequence considering variability of processing time. A Markov decision process model was proposed for the job sequence problem, considering the trade-off relationship between two objective functions. Deep reinforcement learning was also used to learn the optimal scheduling policy. The developed algorithm was evaluated by comparing its performance with priority rules (SSPT, ATCS, MDD, COVERT rule) in test scenarios constructed by the sampling data. As a result, the proposed scheduling algorithms outperformed than the priority rules in terms of set-up ratio, tardiness, and makespan.

조기완료 및 납기지연 벌과금을 고려한 흐름작업 시스템의 일정계획 (A Study on Flow Shop Scheduling with Early & Tardy Penalty Cost)

  • 이정환
    • 산업경영시스템학회지
    • /
    • 제16권27호
    • /
    • pp.91-104
    • /
    • 1993
  • This paper is concerned with flow shop scheduling problems having the common due date. V-shape property is used for algorithms with early and tardy penalty cost. The objective of this paper is developing efficient heuristic scheduling algorithms for minimizing total penalty cost function and determining the optimal common due date. The between job delay and the work in process are considered for developing algorithms as penalty cost. Algorithms is simulated to analyze interrelated factors. A numerical example is given for illustrating the proposed algorithms.

  • PDF

반도체 FAB의 스케줄링 시뮬레이터 개발 (Scheduling Simulator for Semiconductor Fabrication Line)

  • 이영훈;조한민;박종관;이병기
    • 산업공학
    • /
    • 제12권3호
    • /
    • pp.437-447
    • /
    • 1999
  • Modeling and system development for the fabrication process in the semiconductor manufacturing is presented in this paper. Maximization of wafer production can be achieved by the wafer flow balance under high utilization of bottleneck machines. Relatively simpler model is developed for the fabrication line by considering main characteristics of logistics. Simulation system is developed to evaluate the line performance such as balance rate, utilization, WIP amount and wafer production. Scheduling rules and input rules are suggested, and tested on the simulation system. We have shown that there exists good combination of scheduling and input rules.

  • PDF

공정 그룹별 Start lag을 고려한 스케쥴링 (Scheduling with regard to start lag in process group)

  • 전태준;박성호
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1996년도 추계학술대회발표논문집; 고려대학교, 서울; 26 Oct. 1996
    • /
    • pp.299-302
    • /
    • 1996
  • The purpose of this study is developing scheduling logic and program for machining scheduling of automobile part production line with unbalanced processing time. Three rules are developed to minimize slack and effect on other job. Fourth rule is suggested which considered weighted sum of three factors. schedule is generated totally 1, 000 times and then optimal weight parameter is selected. The program is developed to schedule situation to compare with the performance measure, total finish time of machine and total tardiness of part. As a result, the rule which considered weighted sum of three factors is effective for both measure.

  • PDF

타임 패트리넷 Unfolding을 이용한 FMS의 스케쥴링 분석 (A Scheduling Analysis of FMS Using TPM Unfolding)

  • 이종근
    • 제어로봇시스템학회논문지
    • /
    • 제7권4호
    • /
    • pp.344-350
    • /
    • 2001
  • In this paper, we are focused on the analysis of acyclic schedule for the determination of the opti-mal cycle time and minimization of work in process. Especially, this paper deals with the product ratio-driven cyclic scheduling problem in FMS with different products and ratio using the TPN(Time Petri Nets)un-folding.

  • PDF

Development of integrated scheduling system for virtual manufacturing system

  • Roh, Kyoungyun;Noh, Sangdo;Lee, Kyoil
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 Proceedings of the Korea Automatic Control Conference, 11th (KACC); Pohang, Korea; 24-26 Oct. 1996
    • /
    • pp.354-357
    • /
    • 1996
  • Virtual Manufacturing System(VMS) is an integrated computer based model which has physical, logical schema and behavior of real manufacturing system. In this paper, an integrated scheduling system is developed to simulate and control a Virtual Factory. A workflow model is constructed to define and analyze the structure of a VMS. On-line dynamic dispatching system is developed using MultiPass algorithm and scheduling system considering dynamic CAPP is carried out. Integrated scheduling system developed in this paper reduces the discrepancies between virtual model and real manufacturing system, and control of real shop floor is possible.

  • PDF

Evolutionary Network Optimization: Hybrid Genetic Algorithms Approach

  • Gen, Mitsuo
    • 한국지능시스템학회:학술대회논문집
    • /
    • 한국퍼지및지능시스템학회 2003년도 ISIS 2003
    • /
    • pp.195-204
    • /
    • 2003
  • Network optimization is being increasingly important and fundamental issue in the fields such as engineering, computer science, operations research, transportation, telecommunication, decision support systems, manufacturing, and airline scheduling. Networks provide a useful way to modeling real world problems and are extensively used in practice. Many real world applications impose on more complex issues, such as, complex structure, complex constraints, and multiple objects to be handled simultaneously and make the problem intractable to the traditional approaches. Recent advances in evolutionary computation have made it possible to solve such practical network optimization problems. The invited talk introduces a thorough treatment of evolutionary approaches, i.e., hybrid genetic algorithms approach to network optimization problems, such as, fixed charge transportation problem, minimum cost and maximum flow problem, minimum spanning tree problem, multiple project scheduling problems, scheduling problem in FMS.

  • PDF

Finite-Horizon Online Transmission Scheduling on an Energy Harvesting Communication Link with a Discrete Set of Rates

  • Bacinoglu, Baran Tan;Uysal-Biyikoglu, Elif
    • Journal of Communications and Networks
    • /
    • 제16권3호
    • /
    • pp.293-300
    • /
    • 2014
  • As energy harvesting communication systems emerge, there is a need for transmission schemes that dynamically adapt to the energy harvesting process. In this paper, after exhibiting a finite-horizon online throughput-maximizing scheduling problem formulation and the structure of its optimal solution within a dynamic programming formulation, a low complexity online scheduling policy is proposed. The policy exploits the existence of thresholds for choosing rate and power levels as a function of stored energy, harvest state and time until the end of the horizon. The policy, which is based on computing an expected threshold, performs close to optimal on a wide range of example energy harvest patterns. Moreover, it achieves higher throughput values for a given delay, than throughput-optimal online policies developed based on infinite-horizon formulations in recent literature. The solution is extended to include ergodic time-varying (fading) channels, and a corresponding low complexity policy is proposed and evaluated for this case as well.

분산 제어 시스템에서의 태스크와 메시지 기반 스케줄링을 이용한 최적 주기와 우선순위 할당 (Optimal Period and Priority Assignment Using Task & Message-Based Scheduling in Distributed Control Systems)

  • 김형육;이철민;박홍성
    • 제어로봇시스템학회논문지
    • /
    • 제8권6호
    • /
    • pp.506-513
    • /
    • 2002
  • Distributed control systems(DCS) using fieldbus such as CAN have been applied to process systems but it is very difficult to design the DCS while guaranteeing the given end-to-end constraints such as precedence constraints, time constraints, and periods and priorities of tasks and messages. This paper presents a scheduling method to guarantee the given end-to-end constraints. The presented scheduling method is the integrated one considering both tasks executed in each node and messages transmitted via the network and is designed to be applied to a general DCS that has multiple loops with several types of constraints, where each loop consists of sensor nodes with multiple sensors, actuator nodes with multiple actuators and controller nodes with multiple tasks. An assignment method of the optimal period of each loop and a heuristic assignment rule of each message's priority are proposed and the integrated scheduling method is developed based on them.

유연 Job Shop 일정계획의 유연성에 대한 시뮬레이션 (Simulation for Flexibility of Flexible Job Shop Scheduling)

  • 김상천;김정자;이상완;이성우
    • 한국산업융합학회 논문집
    • /
    • 제4권3호
    • /
    • pp.281-287
    • /
    • 2001
  • Traditional job shop scheduling is supposed that machine has a fixed processing job type. But actually the machine has a highly utilization or long processing time is occurred delay. Therefore product system is difficult to respond quickly to the change of products or loads or machine failure etc. Here we use flexible job shop which is supposed that a machine has several jobs by tool change. The heuristic for the flexible job shop scheduling has to solve two problems. One is a routing problem which is determine a machine to process job. The other is sequencing problem which is determine processing sequence. The approach to solve two problems arc a hierarchical approach which is determined routing and then schedule, and a concurrence approach which is solved concurrently two problems by considering routing when it is scheduled. In this study, we simulate for flexibility efficiency fo flexible job shop scheduling with machine failure using hierarchical approach.

  • PDF