• Title/Summary/Keyword: process of completion

Search Result 582, Processing Time 0.035 seconds

THE IDEMPOTENT FUZZY MATRICES

  • LEE, HONG YOUL;JEONG, NAE GYEONG;PARK, SE WON
    • Honam Mathematical Journal
    • /
    • v.26 no.1
    • /
    • pp.3-15
    • /
    • 2004
  • In the fuzzy theory, a matrix A is idempotent if $A^2=A$. The idempotent fuzzy matrices are important in various applications and have many interesting properties. Using the upper diagonal completion process, we have the zero patterns of idempotent fuzzy matrix, that is, the idempotent Boolean matrices. In addition, we give the construction of all idempotent fuzzy matrices for each dimension n.

  • PDF

THE CONSTRUCTION OF FUZZY IDEMPOTENT ZERO PATTERNS BY A PROGRAM

  • Park, Se Won;Kang, Chul
    • Honam Mathematical Journal
    • /
    • v.36 no.1
    • /
    • pp.187-198
    • /
    • 2014
  • The fuzzy idempotent matrices are important in various applications and have many interesting properties. Using the upper diagonal completion process, we have the zero patterns of fuzzy idempotent matrix, that is, Boolean idempotent matrices. And we give the construction of all fuzzy idempotent matrices for some dimention.

THE BOOLEAN IDEMPOTENT MATRICES

  • Lee, Hong-Youl;Park, Se-Won
    • Journal of applied mathematics & informatics
    • /
    • v.15 no.1_2
    • /
    • pp.475-484
    • /
    • 2004
  • In general, a matrix A is idempotent if $A^2$ = A. The idempotent matrices play an important role in the matrix theory and some properties of the Boolean matrices are examined. Using the upper diagonal completion process, we give the characterization of the Boolean idempotent matrices in modified Frobenius normal form.

Scheduling of Welding Robots for Shipyard Sub-assembly Process (조선 소조립 공정의 자동화를 위한 용접 로봇 스케줄링)

  • Kang, Jang-Ha;Park, Sung-Soo;Park, Kyung-Chul;Do, Ki-Sang
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.1
    • /
    • pp.21-34
    • /
    • 1999
  • We consider a scheduling problem arising in a shipyard subassembly welding process. There are four welding robots of gantry type, which perform the welding process for the subassemblies. Because the robots perform the welding operations at the same time, there is a possibility of collision between adjacent robots depending on the welding schedule. In this paper, we propose a heuristic method to find a welding schedule which does minimize the welding completion time while avoiding collision among the robots. The method consists of two phases: assignment and scheduling. In the assignment phase, we assign each welding line to a proper robot. In the scheduling phase, we determine the welding schedules for the robots so that collision is avoided. Computational experiences with the data which reflect the real situation are reported.

  • PDF

Optimal Scheduling of Multi-product Batch Process for Common Intermediate Storage Policy; A Model for Batch Process Automation (다품종용 회분식 공정에서의 중간 저장 탱크 공유를 위한 최적 생산계획 ; 회분식 조업의 자동화 모델)

  • 정재학;이인범;양대륙;장근수
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.303-308
    • /
    • 1992
  • In this study, we propose a shared storage system which is more efficient policy than MIS(Mixed Intermediate Storage) policy for relatively rare storage system and can be called CIS(Common Intermediate Storage) policy. Using this strategy, we develop a new completion time algorithm and apply it to two kinds of optimal or near optimal scheduling method; combinatorial search and simulated annealing method. We also extend this strategy to other storage policy, for example MIS policy, with PLC(Programmable Logic Controller) logic and on/off action of electronic valves. It thus can be accepted as a basic form of FMS(Flexible Manufacturing System) for operating various storage policies. Finally we suggest the interlocking block to compansate for the shortcoming of CIS policy, i.e, complication of operation and safety, resulting in a basic batch process automation mode.

  • PDF

Thermal History Analysis and Solid Fraction Prediction of Gas-Atomized Alloy Droplets during Spray Forming (분무성형 공정에서 분무액적의 열이력 해석 및 고상분율 예측)

  • 이언식
    • Journal of Powder Materials
    • /
    • v.1 no.1
    • /
    • pp.85-94
    • /
    • 1994
  • In order to predict droplet velocity and temperature profiles and fractional solidification with flight distance during spray forming, the Newtonian heat transfer formulation has been coupled with the classical heterogeneous nucleation and the specific solidification process. It has been demonstrated that the thermal profile of the droplet in flight is significantly affected by process parameters such as droplet size, initial gas velocity, undercooling. As the droplet size and/or the initial gas velocity increase, the onset and completion of solidification are shifted to greater flight distances and the solidification process also extends over a wider range of flight distances. The amounts of solid fractions formed during recoalescence, segregated solidification and eutectic solidification are insensitive to droplet size and initial gas velocity whereas those are strongly affected by the degree of undercooling. There are good linear relations between the undercooling and the corresponding solid fractions generated during recoalesced, segregated and eutectic stages.

  • PDF

Performance Evaluation of Software Task Processing Based on Markovian Perfect Debugging Model

  • Lee, Chong-Hyung;Jang, Kyu-Beam;Park, Dong-Ho
    • The Korean Journal of Applied Statistics
    • /
    • v.21 no.6
    • /
    • pp.997-1006
    • /
    • 2008
  • This paper proposes a new model by combining an infinite-server queueing model for multi-task processing software system with a perfect debugging model based on Markov process with two types of faults suggested by Lee et al. (2001). We apply this model for module and integration testing in the testing process. Also, we compute several measure, such as the expected number of tasks whose processes can be completed and the task completion probability are investigated under the proposed model.

Scheduling of Shipyard Sub-assembly Process using Genetic Algorithms (유전자 알고리즘을 활용한 조선 소조립 공정 일정계획)

  • Bae, Hee-Chul;Park, Kyung-Cheol;Cha, Byung-Chul;Moon, Il-Kyeong
    • IE interfaces
    • /
    • v.20 no.1
    • /
    • pp.33-40
    • /
    • 2007
  • In this paper, we consider a scheduling problem of shipyard sub-assembly process. We introduce a skid conveyor system in a shipbuilding company. We develop a mathematical model and a genetic algorithm for shipyard sub-assembly process. The objective of the scheduling is to minimize the makespan which is the final completion time of all jobs. Numerical experiments show that the genetic algorithm performs efficiently.

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF

PRIVATE DEVELOPERS' UNDERSTANDING ON THE IMPLEMENTATION OF STRATEGIC PARTNERING IN THE MALAYSIAN CONSTRUCTION INDUSTRY

  • Faridah Muhamad Halil;Mohammad Fadhil Mohammad;Rohana Mahbub;Ani Saifuza Shukor
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.542-549
    • /
    • 2011
  • This research will attempt to reveal that private developers in the Malaysian construction industry have been practicing strategic partnering in their organizations. While the investigation was conducted using quantitative and qualitative approaches, this paper will only reveal results obtained from the questionnaire survey. Results from the questionnaire survey indicate that private developers in the Malaysian construction industry had implemented strategic partnering in their organizations. The elements of the partnering process, which are partnering formation, partnering application and partnering completion or reactivation were tested. The results show that all the elements of the partnering process have been exercised in their projects. Thus it can be surmised that strategic partnering has been practiced by private developers in the Malaysian construction industry.

  • PDF