1 |
Chung, K. H., Baek, T. H, Min, S. G., Kim, H S.,Park, J. C, Cho, K. K. and Park, C.K. (2001), Development of the spatial scheduling system and its applications in shipbuilding industry, IE Interfaces 14(4), 394-402
|
2 |
Kim, K D., Woo, S. B. and Hahn, H. S.(2001), A study on the erection scheduling for shipbuilding considering resource constraints, IE 14(3), 218-226
|
3 |
Min, S.G., Lee, S.H, Kim, J. O., Ha, S. J. and Choi, T. H (2005), A case study for development of the block arrangement on fixed area and scheduling system, Special issue of the Society of Naval Architect of Korea, 1, 159-164
|
4 |
Koh, S. G., Park, J. C., Choi, Y. S. and Joo, C. M.(1999), Development of a block assembly scheduling system for shipbuilding company, IE 12(4), 586-594
|
5 |
Kim, Y, Yun, B. and Lee, S. (1999), Meta Heuristic, Youngji Publishers
|
6 |
Min, S.G., Moon, C.U., Lee, M.W., Chung, K Hand Park, J. C.(2000), A genetic algorithm application for the load balancing of ship erection process, IE Interfaces, 13(2), 225-233
|
7 |
Gen, M. and Cheng, R. (1997), Genetic Algorithms and Engineering Design, Wiley-Interscience, NewYork
|
8 |
Park, K, Lee, K, Park, S. and Kim, S. (1996), Modeling and solving the spatial block scheduling problem in a shipbuilding company, Computers and industrial Engineering, 30(3), 357-364
DOI
ScienceOn
|
9 |
Baker, K R (1974), Introduction to Sequencing and Scheduling, Addison-Wesley, .MA.
|
10 |
Goldberg, D. E. (1989), Genetic Algorithms in Search, Optimization and Machine Leaming, Addison-Wesley, New York
|