• 제목/요약/키워드: probabilistic forecast

검색결과 54건 처리시간 0.017초

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

도시기상서비스 기술 개발에 관한 연구 (On the Study of Developement for Urban Meteorological Service Technology)

  • 최영진;김창모;류찬수
    • 통합자연과학논문집
    • /
    • 제4권2호
    • /
    • pp.149-157
    • /
    • 2011
  • Urbanization of the world's population has given rise to more than 450 cities around the world with populations in excess of 1 million (megacity) and more than 25 so-called metacities with populations over 10 million (Brinkhoff, 2010). The United States today has a total resident population of more than 308,500,000 people, with 81 percent residing in cities and suburbs as of mid - 2005 (UN, 2008). Urban meteorology is the study of the physics, dynamics, and chemistry of the interactions of Earth's atmosphere and the urban built environment, and the provision of meteorological services to the populations and institutions of metropolitan areas. While the details of such services are dependent on the location and the synoptic climatology of each city, there are common themes, such as enhancing quality of life and responding to emergencies. Experience elsewhere (e.g., Shanghai, Helsinki, Tokyo, Seoul, etc.) shows urban meteorological support is a key part of an integrated or multi-hazard warning system that considers the full range of environmental challenges and provides a unified response from municipal leaders. Urban meteorology has come to require much more than observing and forecasting the weather of our cities and metropolitan areas. Forecast improvement as a function of more and better observations of various kinds and as a function of model resolution, larger ensembles, predicted probability distributions; Responses of emergency managers, government officials, and users to improved and probabilistic forecasts; Benefits of improved forecasts in reduction of loss of life, property damage, and other adverse effects. A national initiative to enhance urban meteorological services is a high-priority need for a wide variety of stakeholders, including the general, commerce and industry, and all levels of government. Some of the activities of such an initiative include: conducting basic research and development; prototyping and other activities to enable very--short and short range predictions; supporting and improving productivity and efficiency in commercial and industrial sectors; and urban planning for long term sustainability. In addition urban test-beds are an effective means for developing, testing, and fostering the necessary basic and applied meteorological and socioeconomic research, and transitioning research findings to operations. An extended, multi-year period of continuous effort, punctuated with intensive observing and forecasting periods, is envisioned.

천연기념물 제415호 포항 달전리 주상절리의 사면안정성 평가 및 낙석 위험 범위 설정 (A Study on Evaluation of Slope Stability and Range of Rockfall Hazard of Daljeon-ri Columnar Joint in Pohang, Korea)

  • 김재환;강무환;공달용;좌용주
    • 보존과학회지
    • /
    • 제37권5호
    • /
    • pp.505-515
    • /
    • 2021
  • 포항 달전리 주상절리(천연기념물 제415호, 이하 주상절리)에 대한 사면안정성 평가 및 낙석 시뮬레이션을 통하여 낙석의 최대 에너지, 도약높이, 이동거리를 산출하였으며, 낙석 위험 범위를 설정하였다. 주상절리가 분포하는 사면의 경우 왼쪽(SW)에서 오른쪽(NE)에 이르기까지 93.79°, 131.99°, 165.54°, 259.84°의 경사방향을 가지며 전체적으로 부채꼴의 형상을 하고 있다. 이러한 사면의 경사방향을 따라 4구간으로 구분하였으며, 각 구간별 노출되어 있는 주상절리의 단면에서 개별적인 불연속면의 방향성을 측정한 결과 1구간은 125개, 2구간은 261개, 3구간은 262개, 4구간은 43개로 확인된다. 평사투영법을 이용한 각 구간별 사면 안정성 평가 결과, 평면 및 전도파괴 영역에 해당되나 이는 노출된 주상절리면의 개별 방향성에 대한 해석 결과로 주상절리에 대하여 평면 및 전도파괴의 가능성을 진단하기 어렵기 때문에 현재에도 발생되고 있는 낙석으로부터 위험 가능성을 평가하는 것이 바람직한 것으로 판단된다. 또한 낙석 시뮬레이션을 통해 측정된 낙석의 최대 이동거리는 약 66 m이며, 낙석 위험 범위는 사면 아래 전 영역이 해당됨을 알 수 있다. 따라서 이러한 낙석의 거동은 지형학적 요인에 의해 다양한 방향으로 굴러떨어져 낙하지점을 예측하기 힘들기 때문에 낙석으로부터 안정성 확보를 위한 낙석 방지시설 설치를 제안하고자 한다.

국지 앙상블자료와 홍수위험매트릭스를 이용한 홍수위험도 예측 방법 연구 (A study on prediction method for flood risk using LENS and flood risk matrix)

  • 최천규;김경탁;최윤석
    • 한국수자원학회논문집
    • /
    • 제55권9호
    • /
    • pp.657-668
    • /
    • 2022
  • 하천 유량이 증가된 상태에서 집중호우의 발생은 유량과 강우량 모두 하천변 홍수피해에 영향을 미치게 된다. 또한, 하천변 사회·경제적 영향 수준에 따라 피해정도에 차이를 보이게 되며, 특히, 인구 및 자산 밀집도가 높은 경우 홍수대응에 필요한 충분한 예보 선행시간의 확보가 요구된다. 본 연구에서는 홍수대응에 필요한 시간적 여유의 확보를 통한 피해저감 효과를 증대하기 위해 앙상블 강우유출모델링을 활용한 홍수위험매트릭스를 구축하고, 그 적용성을 판단하고자 한다. 홍수위험매트릭스는 홍수피해 자료를 활용한 홍수피해 영향수준(X축)을 구성하고, 기상청 LENS 강우자료를 이용한 앙상블 강우유출모델링의 결과로 위험 홍수량의 발생 가능성을 예측(Y축)하여 확률예보에 기반한 예측이 가능하다. 이를 위해 과거 홍수피해 자료 및 정량적 홍수피해 평가방법을 이용한 홍수피해 영향수준 결정 방법을 제시하였다. 낙동강권역의 태화강유역 및 형산강유역의 홍수특보지점에 대하여 기존 홍수특보 자료 그리고 피해 발생 상황과 비교하였다. 그 결과 최대 3일전부터 홍수위험 발생시간 및 정도에 대한 예측이 가능한 것으로 분석되었다. 따라서 홍수대응에 필요한 예보 선행시간 확보를 통한 피해저감 활동에 도움이 되리라 판단된다.