• Title/Summary/Keyword: priority scheduling

Search Result 393, Processing Time 0.027 seconds

A Modified Dynamic Weighted Round Robin Cell Scheduling Algorithm

  • Kwak, Ji-Young;Nam, Ji-Seung;Kim, Do-Hyun
    • ETRI Journal
    • /
    • v.24 no.5
    • /
    • pp.360-372
    • /
    • 2002
  • In this paper, we propose the modified dynamic weighted round robin (MDWRR) cell scheduling algorithm, which guarantees the delay property of real-time traffic and also efficiently transmits non-real-time traffic. The proposed scheduling algorithm is a variation of the dynamic weighted round robin (DWRR) algorithm and guarantees the delay property of real-time traffic by adding a cell transmission procedure based on delay priority. It also uses a threshold to prevent the cell loss of non-real-time traffic that is due to the cell transmission procedure based on delay priority. Though the MDWRR scheduling algorithm may be more complex than the conventional DWRR scheme, considering delay priority minimizes cell delay and decreases the required size of the temporary buffer. The results of our performance study show that the proposed scheduling algorithm has better performance than the conventional DWRR scheme because of the delay guarantee of real-time traffic.

  • PDF

Optimal Period and Priority Assignment Using Task & Message-Based Scheduling in Distributed Control Systems (분산 제어 시스템에서의 태스크와 메시지 기반 스케줄링을 이용한 최적 주기와 우선순위 할당)

  • 김형육;이철민;박홍성
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.8 no.6
    • /
    • pp.506-513
    • /
    • 2002
  • Distributed control systems(DCS) using fieldbus such as CAN have been applied to process systems but it is very difficult to design the DCS while guaranteeing the given end-to-end constraints such as precedence constraints, time constraints, and periods and priorities of tasks and messages. This paper presents a scheduling method to guarantee the given end-to-end constraints. The presented scheduling method is the integrated one considering both tasks executed in each node and messages transmitted via the network and is designed to be applied to a general DCS that has multiple loops with several types of constraints, where each loop consists of sensor nodes with multiple sensors, actuator nodes with multiple actuators and controller nodes with multiple tasks. An assignment method of the optimal period of each loop and a heuristic assignment rule of each message's priority are proposed and the integrated scheduling method is developed based on them.

ANALYSIS OF QUEUEING MODEL WITH PRIORITY SCHEDULING BY SUPPLEMENTARY VARIABLE METHOD

  • Choi, Doo Il
    • Journal of applied mathematics & informatics
    • /
    • v.31 no.1_2
    • /
    • pp.147-154
    • /
    • 2013
  • We analyze queueing model with priority scheduling by supplementary variable method. Customers are classified into two types (type-1 and type-2 ) according to their characteristics. Customers of each type arrive by independent Poisson processes, and all customers regardless of type have same general service time. The service order of each type is determined by the queue length of type-1 buffer. If the queue length of type-1 customer exceeds a threshold L, the service priority is given to the type-1 customer. Otherwise, the service priority is given to type-2 customer. Method of supplementary variable by remaining service time gives us information for queue length of two buffers. That is, we derive the differential difference equations for our queueing system. We obtain joint probability generating function for two queue lengths and the remaining service time. Also, the mean queue length of each buffer is derived.

Delay Performance of Multi-Service Network with Strict Priority Scheduling Scheme

  • Lee, Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.2B
    • /
    • pp.11-20
    • /
    • 2005
  • Strict priority scheduling scheme is a good candidate for the implementation of service differentiation in an Internet because of simplicity in implementation and the capability to guarantee the delay requirement of the highest class of traffic. However, it is also blown that strict priority starves the lower-class traffic at the cost of prioritizing the higher-class traffic. The purpose of this work is to propose an analytic method which can estimate the average delay performance of Diffserv service architecture and shows that strict priority scheme does not sacrifice the lower class traffic over a diverse condition of the load. From the numerical experiments for three-class Diffserv network we validate our argument that strict priority scheme may be applied to a service differentiation scheme for the future Internet.

Heuristics for Job Shop Scheduling Problems with Progressive Weighted Tardiness Penalties and Inter-machine Overlapping Sequence-dependent Setup Times

  • Mongkalig, Chatpon;Tabucanon, Mario T.;Hop, Nguyen Van
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.1-22
    • /
    • 2005
  • This paper presents new scheduling heuristics, namely Mean Progressive Weighted Tardiness Estimator (MPWT) Heuristic Method and modified priority rules with sequence-dependent setup times consideration. These are designed to solve job shop scheduling problems with new performance measures - progressive weighted tardiness penalties. More realistic constraints, which are inter-machine overlapping sequence-dependent setup times, are considered. In real production environments, inter-machine overlapping sequence-dependent setups are significant. Therefore, modified scheduling generation algorithms of active and nondelay schedules for job shop problems with inter-machine overlapping sequence-dependent setup times are proposed in this paper. In addition, new customer-based measures of performance, which are total earliness and progressive weighted tardiness, and total progressive weighted tardiness, are proposed. The objective of the first experiment is to compare the proposed priority rules with the consideration of sequence-dependent setup times and the standard priority rules without setup times consideration. The results indicate that the proposed priority rules with setup times consideration are superior to the standard priority rules without the consideration of setup times. From the second experiment and the third experiment to compare the proposed MPWT heuristic approach with the efficient priority rules with setup times consideration, the MPWT heuristic method is significantly superior to the Batched Apparent Tardiness Cost with Sequence-dependent Setups (BATCS) rule, and other priority rules based on total earliness and progressive weighted tardiness, and total earliness and tardiness.

Enhancing Fixed Priority Scheduling Algorithms for Real-Time Tasks on Multiprocessors (다중처리기 상의 실시간 태스크를 위한 고정 우선순위 스케줄링 알고리즘의 성능 향상)

  • Park Minkyu;Han Sangchul;Kim HeeHeon;Cho Seongje;Cho Yookun
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.11 no.1
    • /
    • pp.62-68
    • /
    • 2005
  • This paper presents a scheme to enhance fixed priority scheduling algorithms on multiprocessors. This scheme gives the highest priority to jobs with zero laxity and schedules them Prior to other jobs. A fixed priority algorithm employing this scheme strictly dominates the original one; it can schedule all task sets schedulable by the fixed priority algorithm and some task sets not schedulable by the fixed priority algorithm. Simulation results show that the proposed scheme improves fixed priority algorithms in terms of the number of schedulable task sets and schedulable utilization bound.

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Development of an Extended EDS Algorithm for CAN-based Real-Time System

  • Lee, Byong-Hoon;Kim, Dae-Won;Kim, Hong-Ryeol
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.60.3-60
    • /
    • 2001
  • Usually the static scheduling algorithms such as DMS(Deadline Monotonic Scheduling) or RMS(Rate Monotonic Scheduling) are used for CAN scheduling due to its ease with implementation. However, due to their inherently low utilization of network media, some dynamic scheduling approaches have been studied to enhance the utilization. In case of dynamic scheduling algorithms, two considerations are needed. The one is a priority inversion due to rough deadline encoding into stricted arbitration fields of CAN. The other is an arbitration delay due to the non-preemptive feature of CAN. In this paper, an extended algorithm is proposed from an existing EDS(Earliest Deadline Scheduling) approach of CAN scheduling algorithm having a solution to the priority inverstion ....

  • PDF

An open Scheduling Framework for QoS resource management in the Internet of Things

  • Jing, Weipeng;Miao, Qiucheng;Chen, Guangsheng
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.9
    • /
    • pp.4103-4121
    • /
    • 2018
  • Quality of Service (QoS) awareness is recognized as a key point for the success of Internet of Things (IOT).Realizing the full potential of the Internet of Things requires, a real-time task scheduling algorithm must be designed to meet the QoS need. In order to schedule tasks with diverse QoS requirements in cloud environment efficiently, we propose a task scheduling strategy based on dynamic priority and load balancing (DPLB) in this paper. The dynamic priority consisted of task value density and the urgency of the task execution, the priority is increased over time to insure that each task can be implemented in time. The scheduling decision variable is composed of time attractiveness considered earliest completion time (ECT) and load brightness considered load status information which by obtain from each virtual machine by topic-based publish/subscribe mechanism. Then sorting tasks by priority and first schedule the task with highest priority to the virtual machine in feasible VMs group which satisfy the QoS requirements of task with maximal. Finally, after this patch tasks are scheduled over, the task migration manager will start work to reduce the load balancing degree.The experimental results show that, compared with the Min-Min, Max-Min, WRR, GAs, and HBB-LB algorithm, the DPLB is more effective, it reduces the Makespan, balances the load of VMs, augments the success completed ratio of tasks before deadline and raises the profit of cloud service per second.