• Title/Summary/Keyword: prior environmental review

Search Result 102, Processing Time 0.021 seconds

A Study on The Prior Environmental Review System in a Costal Improvement Project (연안정비사업의 사전환경성검토 방안에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.179-187
    • /
    • 2010
  • A costal improvement project is designed for preventing disasters on the coast, improving costal environment, and promoting costal functions, so it is different from the one for developing coasts. However, the costal improvement project also affects the surrounding environment and it may damage the costal environment in some cases. In line with this, this study was carried out to provide the guideline to the review on environmental conditions, which should be performed in the stage of establishing the plan for a costal improvement project, so that the influence affecting marine environment can be reduced and more efficient coastal project can be planned. The costal improvement project is different in the degree of affecting the costal environment according to kinds, scales, and regions. Accordingly, in this study the state of the coastal improvement project and involved problems were analyzed. The prior environmental review system was divided into a seawall-installation project, a marine construction such as the installation of submerged breakwater and jetties, and a project for creating water-friendly coast including a park without marine landfill. The main items for reviewing these specific projects were presented.

Research on Subject Business of Prior Review System on the Influence of Disasters - Based on Quarrying Industry - (사전재해영향성검토협의 대상사업에 관한 연구 - 채석사업을 중심으로 -)

  • Na, Young;Kim, Hwan-Gi
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.5
    • /
    • pp.319-325
    • /
    • 2007
  • Recently, since the risk on natural disasters is increasing due to abnormal weather such as the global warming, a need for a system on prior review on the influence of disasters has emerged in order to establish a solution by analyzing elements of disaster in advance. However, since the inherently destroying business namely the quarrying business is excluded from the range of subject business of Prior Review System on the influence of disasters, a correction for this is required. In order to actually explore how much risk it contains, actual outflow of soil and flood in the quarrying block where quarrying is being currently carried out was examined and the required undercurrent facility capacity which is also used as a grit chamber was investigated. In addition, by comparing the soil outflow of industrial complexes and golf courses which are current subject businesses of Prior Review on the Influence of Disasters and that of rock mountains relative risk level was examined. After investigation, it was found that the risk on occurrence of disasters was increased due to increase in outflow of soil and flood because of the change of land condition during and after development thus an adequate solution to decrease is required. In addition, after comparison with other business groups it was found that a significantly higher amount of soil is outflown in case of rock mountains thus it was analyzed that a solution to decrease is required. Therefore, a correction is immediately required in order to include quarrying business in the subject business of Prior Review System on the Influence of Disasters.

A Study on Rational Alternative Comparison of Prior Review on Environmental Conditions for Basic Plan of Public Waters Reclamation (공유수면매립 기본계획 사전환경성검토의 합리적인 대안비교에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Byon, Seong-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.563-571
    • /
    • 2010
  • In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.

A Study on the Improvement of Prior Environmental Review System(PERS) in a Administrative Plan & Program Including a Small-Scale Development - Focus on Hot Spring Hole Wildness - (소규모 개발이 수반되는 행정계획 사전환경성검토 발전방안에 관한 연구 - 온천공보호구역을 중심으로 -)

  • Kim, Jeong-Hyun;Kim, Im-Soon;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.3
    • /
    • pp.167-176
    • /
    • 2008
  • Korea has made the rapid economical development under the condition with the high population density and low available land. In this context, conservation of land environment, connected directly with living quality of human, has mostly ignored. Prior Environment Review System(PERS) is the one to investigate the locational validity, environmental impacts, harmony with surrounding environment, from the early stage of administrative plan or development project. PERS was amended to include SEA(Strategic Environment Assessment) system on June 1, 2006. But, several problems, including the loss of administrative ability, cost, and time, have been appeared, since the system is applied to all administrative plans without any distinction and plans or projects are delayed generally. In this study, the weaknesses of PERS were indicated through the comprehensive analysis including literature survey, study of legal and internet database, and the recently published PERS reports. Based on that, the improvement schemes were suggested to be harmonized with the nature of SEA. This study was mainly focused on a PERS for the designation of conservational area of hot-spring wells, conducted by authors.

Integrated Approaches of Health Impact Assessment as part of Environmental Assessment in Korea (한국에서 환경평가의 부분으로서 건강영향평가의 통합적 접근에 관한 연구)

  • Kim, Im-Soon;Park, Joo-Hyun;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.5
    • /
    • pp.309-322
    • /
    • 2006
  • During the last decade, Health Impact Assessment (HIA) has been discussed worldwide as being an important tool for the development of healthy public policy. HIA has been advanced as a means of bringing potential health impacts to the attention of policy makers, particularly in sectors where health impacts may not otherwise be considered. HIA, a systematic assessment of potential health impacts of proposed public polices, programs, and projects, offers a means to advance population health by bringing public health research to bear on questions of public policy. In Korea, health-related items under current EIA (Environmental Impact Assessment) system can only be found in the categories of hygiene and public health. However, environment and public health are not adequately connected and also health is underestimated even though health is an important objective component for the implementation of Environmental Assessments (EA). As a result, health is not well integrated within criteria for investigating the impacts on environment. This study examines linkages for HIA from the related and relatively well-developed field of Prior Environmental Review System (PERS) which is similar to SEA and EIA in Korea.

Study on the Ratio of Greenness in Residential Complex Development in the Process of Prior Environmental Review System (사전환경검토 대상 택지개발사업의 녹지율분석에 관한 연구)

  • Kim, Sung-Ok;Lee, Sang-Don
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.5
    • /
    • pp.311-318
    • /
    • 2007
  • This study was conducted based on the 115 development projects of residential areas during 2001-2006 to investigate the current status of park green areas. Prior Environmental Review System (PERS) was categorized into regions, scales, and time of the projects, and regression model was used for a statistical analysis. The ratios of greenness of Seoul and Gyunggi province were greater than those of other regions whereas the ratios of greeness of Cheonnam, Chungbuk, and Jeonbuk provinces showed smaller percentage of green areas. Secondly as the scales of development get bigger areas of greenness become larger indicating a large scale residential development projects are favorable for securing green areas. Thirdly the correlation between planned area and green areas, and that between planned population and the ratio of greenness are relatively low (P>0.05). This implies green areas are not a good indicator but a concrete guideline for green areas. Fourthly the ratio of greenness of small scale project is not reached to 10% so that it is recommended to secure over one million $m^2$ areas for development project.

A Study on Application of Strategic Environmental Assessment Method to Environment-friendly the Harbour Plan (친환경적 항만계획을 위한 전략환경평가 기법의 적용에 관한 연구)

  • Kim, Im-Soon;Park, Joo-Hyun;Han, Sang-Wook;Lee, Eun-Young;Kim, Han-Seon;Lee, Eun-Ju
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.2
    • /
    • pp.107-120
    • /
    • 2007
  • The introduction of strategic environmental assessment (SEA) has strengthened and extended the value of environmental impact assessment (EIA) as a foundational tool for sustainable development. In particular, SEA helps to overcome the limitation of project EIA as a 'stand alone' approach, applied relatively late in the decision making cycle. SEA is applied to policy, plan and programme (3P) proposals, when major alternatives are open and systematic consideration can be given to their environmental effects. This process also corresponds to options appraisal of development proposal to find the best practical outcome having regard to all potential impacts. There are imperatives for sustainable development (SD) that are shaping future directions for EIA and SEA internationally, regionally and locally. There is a shift toward more integrative approaches of using EIA and SEA as sustainability tools in cooperated environmental management system (EMS). Korea has established and applied EIA for over twenty years for various projects. Given its coverage, the current EIA system is SEA exclusive. The Prior Environmental Review System (PERS), which is a SEA-type of system, was applied in the late 1990s, mainly for various developing planning programs. The current PERS has been modified as a SEA type system, but in general, policy is not going to be covered.

A Study on the Self-Prevention Plan System (자체방제계획서 검토기준 마련 연구)

  • Kim, Sungbum;Noh, Hyeran;Lee, Jinseon;Kim, Jungmin;Ahn, Seungyoung;Seok, Kwangseol
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.50-55
    • /
    • 2013
  • Self-Prevention Plan Review Report and Review Standards Process Safety Management(PSM), Safety Management System(SMS), including the contents of the safety management system audit standards, notices and guidelines on the screening form and were analyzed. Were expected through the interview and screening personnel in the screening process to identify problems prior research so that it can be reflected in the. Also divided into methods such as document review and on-site implementation status of the review written Emergency Preparedness Plan depending on the item proposed. Toxic Chemicals Control Act(TCCA) Self-Prevention Plan Review Regulations. However, the substantial approval process, and do not enable the system performance lacked Self-Prevention Plan Review. Review half configuration to enhance the professionalism and efficiency of the work of this research was performed.

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Improvement of Biotope-Area-Ratio-Indicator and Appraisal System Applicable to Environmental Impact Assessment Projects (환경영향평가 대상사업에 적용가능한 생태면적률 지표 평가체계 개선)

  • Lee, Gwan-Gyu;Lee, Sang-Hyuk;Kim, Gyung-Ho;Lee, Jung-Hwan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.5
    • /
    • pp.113-125
    • /
    • 2011
  • Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.