• Title/Summary/Keyword: prime contractor

Search Result 16, Processing Time 0.028 seconds

A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors (전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.155-156
    • /
    • 2021
  • Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.

  • PDF

Impacts of the Establishments' Safety Behavior, Safety and Health Delivery and Communication on Occupational Safety and Health Policy Satisfaction

  • Choi, Seo-Yeon;Jung, Han-Suk;Ham, Joo-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.8
    • /
    • pp.151-158
    • /
    • 2019
  • In this paper, we conducted a study to understand the impacts of safety behavior, safety and health delivery and communication, which should be managed for the establishments' safety and health control on occupational safety and health policy satisfaction to utilize that as a material for preparing policy support and preventive measures. For this purpose, we conducted a statistic analysis with 2,970 establishments, utilizing the material, "2015 Occupational Safety and Health Company Survey". As a result, in the manufacturing industry, it turned out in the establishments with more than 300 workers, safety behavior, safety and health delivery and communication of the cooperative firm of the prime contractor were high. In addition, it turned out that safety behaviors had the biggest impact on occupational safety and health policy satisfaction in the manufacturing industry and safety and health delivery and communication had the biggest impact on occupational safety and health policy satisfaction in the construction industry and other industries. As for the relationship between companies, it turned out that safety behaviors had the biggest impact on that between the parent company and a cooperative firm of a prime contractor while safety and health delivery and communication on that between the prime contractor and the subcontractor. Through the results of this study, it is necessary to build up safety and health behavior and safety and health delivery and communication systems for the characteristics of the company, and it is expected that the effect of the safety and health control will increase when policy support is made accordingly.

A Study On Reduce Scheme Of Design Error In Turn-Key Projects (턴키공사 설계오류 저감방안에 관한 연구)

  • Kim Byeong-Soo;Kim Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.286-289
    • /
    • 2003
  • In turn-key projects, escalation of cost by design errors is not allowed because a contractor prepares the design. Therefore, cost escalation by design errors results in increasing the cost of the prime contractor. The rate of profit decreases finally. In addition, design errors bring not only schedule delay but also serious quality problem by unknown errors. This study tries to dissolve problems, that of cost increase. process delay and a falling-off in quality by investigating cause of design errors and presenting a scheme for reducing design errors.

  • PDF

A Review on Recent Debate on Proposals of Amendment of the Article of Prohibition of Inhouse-Contract for Harmful Work in the Industrial Safety and Health Act (유해작업 사내도급 금지와 관련된 논란 및 개정방안에 관한 고찰)

  • Park, Doo Yong
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.24 no.1
    • /
    • pp.1-13
    • /
    • 2014
  • Objectives: The purpose of this study is to review the debate on the Article 28(Prohibition of Inhouse-Contract for Harmful Work) of the Industrial Safety and Health Law. Methods: Literatures and recent debate for prohibition and permission of inhouse-contract for harmful work were reviewed. Proposals of revision for the Article 28 of the Industrial Safety and Health Law were also reviewed. Results: It was not found reasonable to revise the Article 28 based on increased fatal accidents or diseases in the electroplating work and heavy metals handling works that are currently listed in the Presidential Decree under the law as the harmful works. Regulation types of prohibition or authorization for any harmful work shall have inherently poor coverage since the scope of application is extremely limited. Contractors for maintenance and repair of chemical facilities may not be included in the scope of application if the harmful works are defined as chemical handling works. If harmful works are prohibited, the contractor workers may loose their jobs. Therefore, it is necessary to consider balancing job security and occupational safety and health safety. Conclusions: Various limitations were found in the Article 28 and the proposals to revise it. Currently in-house subcontracting is widely spread in the workplace. Therefore, it may be inappropriate to set one or two Article such as the Article 28 and 29 to protect in-house subcontract workers from injury and illness. It is believed that it needs fundamental redirection and new approach with new paradigm to impose occupational safety and health duty to prime contractors.

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

A Case Study of Key Attitude Indicators(KAI) for Contractor in Construction Projects (건설공사 시공자의 주요태도지표 사례연구)

  • Kim, Yong-Deuk;Lee, Young-Dae;Kim, Hyung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.264-267
    • /
    • 2006
  • Timely completion and a satisfied owner are the prime objectives of a construction project. The success to achieve these objectives of a project is fully depend on the working approaches (attitude) of a contractor company. Attitude is very difficult to be measured directly; therefore it must be inferred from assumed relationship with observable indicators. Commonly, behavior shown by a person or organization represents its attitude about things or persons or issues. The aim of this paper is to develop a framework for measuring attitude of contractors in an ongoing construction project. In this paper a set of key attitude indicators (KAIs) measured both objectively and subjectively have been developed through a field survey. The validity of the proposed KAIs is also tested by four case studies. The results of the study show that the KAIs stated in the paper can reasonably measure the attitude of contractors and can be helpful for the owners and project managers to control their projects effectively. This study also provides significant insights into developing a general and comprehensive base for further study.

  • PDF

INTRODUCTION OF COMS IDACS SYSTEM FOR METEOROLOGCIAL AND OCDAN MISSION

  • Lim, Hyun-Su;Park, Durk-Jong;Koo, In-Hoi;Kang, Chi-Ho
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.67-70
    • /
    • 2006
  • KARI is developing Image Data Acquisition and Control System (IDACS) for pre-processing meteorological and ocean data acquired on geostationary orbit. This paper describes the functions and architecture of IDACS and gives its operation policy including backup operation to overcome limitation of single-configured antenna system. The COMS IDACS provides the capability to receive the raw sensor data and disseminate processed MI data to users via a satellite. From the processed image data, users can produce a set of meteorological and ocean products for a wide range of applications. Most of IDACS subsystems are being developed by Korean technologies and experience acquired from previous projects. In case of COMS geometric correction software module, as it is closely dependent on the characteristics of imagers and spacecraft bus system, it is being co-developed with overseas prime contractor who develops spacecraft bus system.

  • PDF

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

A Study on the Minimization of Problems of the Direct Payment for Subcontractor's Work in Public Construction Project (공공건설사업(公共建設事業) 하도급대가(下都給代價) 직접지급(直接支給)의 효과분석(效果分析)을 통한 문제점(問題點) 저감방향(低減方向)에 대한 연구(硏究))

  • Cho, Young-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.101-108
    • /
    • 2007
  • To execute a construction project, many construction participants are engaged in the project. Especially many subcontactors role is very important, but their contract statute seems weaker rather than prime contractor. So to protect the subcontractor and to activate fair subcontract, Fair Transactions in Subcontracting Act was enacted. Direct payment to subcontractor clause of the act can protect subcontractor from the fear of insolvency of prime contractor, on the other hand can cause dispute about the interpretation of defect liability. Therefore the positive act and regulation were examined, and the effects of direct payment to subcontractor were analyzed. And the treatment direction of direct payment were suggested in this paper. Summary is as follows; (1) Statute of subcontractor for the ordering subject must be considered (2) Contract relationship must be reflected in the performance bond, subcontract bond, and subcontract construction conditions (3) To clarify the defect liability for the direct payment, retainage to guarantee the repair during contract period may be reflect on the subcontract construction conditions.

Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.