• Title/Summary/Keyword: preventive repair

Search Result 158, Processing Time 0.023 seconds

Developing the Optimal Decision-Making Process through Preventive Maintenance Policy Based on the Reliability Threshold for Leased Equipment (대여장비의 신뢰도 기반 예방보전 정책을 통한 최적 의사결정 과정 개발)

  • Bae, Kiho;Lee, Juhyun;Park, Seonghwan;Ahn, Suneung
    • Journal of Applied Reliability
    • /
    • v.17 no.3
    • /
    • pp.246-255
    • /
    • 2017
  • Purpose: This study proposes the optimal PM (preventive maintenance) policy of leased equipment for lessee's decision-making using two types of reliability condition. Methods: We consider reliability threshold based PM model. Equipment reliability is estimated and used as condition variable. The effect of repair for maintenance is imperfect and represented by age reduction factor. Results: We provide two PM policies. Policy 1 is focused on minimized total cost. This policy guarantees reliability threshold until last maintenance action. Policy 2 focus on maintaining reliability threshold during leased period. The proposed approach provides optimal reliability threshold under number of PM. Through result, we finally construct decision-making process for lessee using reliability threshold and end of reliability. Conclusion: This study provides two PM policy for lessee's decision-making. Through numerical example, we get a result of optimal reliability threshold, number of PM, optimum alternative under lessee's reliability condition.

A Study on the Problem and Improvement of Safety and Maintenance Management (국내 안전 및 유지관리의 문제점 및 개선방안에 관한 연구)

  • Kim, Sun Woong;Ahn, Kye Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.4 s.56
    • /
    • pp.101-106
    • /
    • 2009
  • In order to build an effective management system for structures and to propose national policy and vision for advance of safety and maintenance management, 'Fundamental Scheme of Safety and Maintenance Management for Structures' has been established and promoted. As developed countries adopt preventive maintenance management, which is preventive as well as aggressive repair/strengthening for structures, it is needed to introduce life-cycle analysis method for improvement of economical efficiency. Therefore, this paper presents not only analysis of domestic conditions and problems related to system for safety and maintenance management, policies and costs for structures but an improvement plan.

Increased DNA Damage of Lymphocytes in Korean Male Smokers (일부 한국 성인 남성 흡연자들의 림프구 DNA 손상의 증가)

  • Lee, Joo-Hyun;Oh, Eun-Ha;Lee, June-Young;Sul, Dong-Geun;Kim, Joo-Ja;Lee, Eun-Il
    • Journal of Preventive Medicine and Public Health
    • /
    • v.40 no.1
    • /
    • pp.16-22
    • /
    • 2007
  • Objective : The purpose of this study was to evaluate the levels of DNA damage in human lymphocytes caused by smoking and other lifestyle factors. Methods : The study population consisted of 173 normal healthy male adults from 21 to 59 years old. The demographic and lifestyle variables were obtained from administered questionnaires. The level of lymphocytic DNA damage in the peripheral blood was evaluated by the Comet assay. Statistical analyses were done by general linear model analysis and Dunnett's multiple comparison. Results : The difference in DNA damage between smokers and non-smokers was statistically significant. The means for the Tail%DNA were found to be 10.48 in the current smokers and 9.60 in the non-smokers (p < 0.05). The tail moment means were 1.58 and 1.45 (p < 0.05) for the current smokers and non-smokers, respectively. The number of cigarettes smoked per day did not result in a significant difference in the level of DNA damage among the smokers. Other lifestyle factors such as age, and drinking and exercise habits were not related to DNA damage. Conclusions : The DNA damage in the lymphocytes of smokers was found to be significantly higher than that for non-smokers. However, the number of cigarettes smoked per day was not related to DNA damage. Further study is needed to evaluate the relationship between the amount of smoking and level of damage to DNA. In addition, the status of DNA repair activities should be assessed.

Field Performance Evaluation of Preventive Maintenance Methods (예방적 유지보수 공법의 현장 적용성능 평가 연구)

  • Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.103-112
    • /
    • 2017
  • PURPOSES : In this study, field performance evaluation of crack treatment of pavement and the feasibility of surface treatment of pavement are presented. The performance and cost of preventive maintenance methods have been previously verified, and the methods are being used in many developed countries and cities. However, the performance and cost of the system have not been verified in domestic, field applications. Therefore, in order to improve performance, the field performance is evaluated, and a reasonable cost is proposed. METHODS : Visual Inspection was conducted to evaluate the field application and performance of the preventive maintenance method. In addition, the PCI index was calculated from the results of visual inspection of the application area of the surface treatment method, and the performance life of each method was predicted. For the economic evaluation, life cycle cost analysis was performed using the life cycle cost analysis program. RESULTS :In order to evaluate and quantify the field performance of crack repair material, the residue condition of the pavement surface after crack treatment, rather than the performance of the material, is evaluated. In addition, the crack resistance and performance life of surface treatment methods are evaluated. The cost of currently available treatment methods are compared to the common pavement cut and overlay method, and it is determined that the preventive method is not economical based on life cycle cost analysis. CONCLUSIONS :Because of the characteristics of cracking, it is necessary to conduct the evaluation of currently applied methods and the analysis of the cause of damage, by visual inspection. Moreover, in order to evaluate the performance and economic suitability of the currently applied surface treatment methods, it is necessary to acquire information on application sections by monitoring their long-term conditions and performance.

Determination of an Optimal Repair Number with Achieved Availability Constraint at RND Stage (연구개발 단계에서 성취 가용도를 고려한 최적 수리횟수 결정모델에 관한 연구)

  • Lee, Jae-Won;Lee, Kye-Kyong;Na, In-Sung;Park, Myeong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.89-98
    • /
    • 2008
  • A preventive maintenance model, caller FNBM($\alpha$, $\delta$, $\gamma$)model, is proposed to decide an optimal repair number under achieved availability requirements(r) along with taking two types of failures (repairable or irrepairable) into account. In this model, the current system is replaced by a new one in case when it doesn't meet the achieved availability requirement, even though it is repairable failure; Otherwise it is replaced in time of the first irrepairable failure. Assumed that the j-th failure is repairable with probability ${\alpha}_j$ minimal repairs are allowed for repairable failure between replacements. Expected cost rate for preventive maintenance model is developed using NHPP(Non-Homogeneous Poisson Process) in order to determine the optimal number $n^*$, also numerical examples are shown in order to explain the proposed model. Since the proposed FNBM($\alpha$, $\delta$, $\gamma$)model includes Park FNBM model(1979) and Nakagawa FNBM(p)model(1983) this proposed model is thought to be better than previous model, especially for weapon system which requires availability as primary parameter.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

Genetic Polymorphisms and Cancer Susceptibility of Breast Cancer in Korean Women

  • Kang, Dae-Hee
    • BMB Reports
    • /
    • v.36 no.1
    • /
    • pp.28-34
    • /
    • 2003
  • Breast cancer is the most prevalent cancer among women in Western countries, and its prevalence is also increasing in Asia. The major risk factor for breast cancer can be traced to reproductive events that influence the lifetime levels of hormones. However, a large percentage of breast cancer cases cannot, be explained by these risk factors. The identification of susceptibility factors that predispose individuals to breast cancer (for instance, if they are exposed to particular environmental agents) could possibly give further insight into the etiology of this malignancy and provide targets for the future development of therapeutics. The most interesting candidate genes include those that mediate a range of functions. These include carcinogen metabolism, DNA repair, steroid hormone metabolism, signal transduction, and cell cycle control. We conducted a hospital-based case-control study in South Korea to evaluate the potential modifying role of the genetic polymorphisms of selected low penetrance genes that are involved in carcinogen metabolisms (i.e., CYP1A1, CYP2E1, GSTM1/T1/P1, NAT1/2, etc.), estrogen synthesis and metabolism (i.e., CYP19, CYP17, CYP1B1, COMT, ER-$\alpha$, etc.), DNA repair (i.e., XRCC1/3, ERCC2/4, ATM, AGT, etc.), and signal transduction as well as others (i.e., TGF-$\beta$, IGF-1, TNF-$\beta$, IL-1B, IL-1RN, etc.). We also took into account the potential interaction between these and the known risk factors of breast cancer. The results of selected genes will be presented in this mini-review.

An Opportunity-based Age Replacement Policy with Warranty Analysed by Using TTT-Transforms

  • Iskandar, Bermawi P.;Klefsjo, Bengt;Sandoh, Hiroaki
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.27-38
    • /
    • 2000
  • In a recent paper Iskandar & Sandoh (1999) studied an opportunity-based age replacement policy for a system which has a warranty period (0,S]. When the system fails at age x $\leq$ S a minimal repair is performed. If an opportunity occurs to the system at age x, S $\leq$ x $\leq$ T, we take the opportunity with probability p to preventively replace the system, while we conduct a corrective .replacement when its fails in (S,T). Finally, if its age reaches T, we perform a preventive replacement, Under this policy the design variable is T. For the case when opportunities occur according to a homogeneous Poisson process, the long-run average cost of this policy was formulated and studied analytically by Iskandar & Sandoh (1999). The same problem is here analysed by using a graphical technique based on scaled TTT-transforms. This technique gives, among other things, excellent possibilities for different types of sensitivity analysis. We also extend the discussion to the situation when we have to estimate T based on times to failure.

  • PDF

Taurine in Bone Formation and Alleviation of Its Diseases (타우린의 뼈 형성 작용과 관련질환의 경감)

  • ;Ramesh C. Gupta
    • Biomolecules & Therapeutics
    • /
    • v.10 no.3
    • /
    • pp.137-141
    • /
    • 2002
  • Taurine, amino acid, chemically known as 2-amino ethane sulphonic acid was discovered more than two hundred years ago from ox bile. it is widely distributed in both mammals and nonmammals. It is found in considerably high amount in hUl11an: a normal adult of 70 kgs contains about 70 grams of taurine. Taurine with this much concentration, is involved in almost all life processes. Its deficiency causes several abnormalities in major organs like brain, eye and heart. Taurine-bone interaction is latest addition to its long list of actions. In bone cells, taurine is also found in high concentration. Taurine is found to help in enhancing the bone tissue formation which is evidenced by increased matrix formation and collagen synthesis. Besides stimulating the bone tissue formation, it also inhibits the bone loss through inhibiting the bone resorption and osteoclast formation. Thus, taurine acts as a double agent. In addition to these two major actions of taurine in bone, it also has beneficial effect in wound healing mld bone repair. Taurine possess radioprotective properties, too. As it is a naturally available molecule, it can be used as a preventive agent. Taurine has a potential to replace bisphosphonates which are currently in use for the inhibition of bone loss but this needs in depth study. As taurine is involved in bone formation and inhibition of bone loss, a detailed study can make it a single marker of bone metabolism. All these taurine-bone interaction is a symbol of their deep involvement but still require further extension to make taurine as a choice for tile sound bone health.

Fault prediction of wind turbine and Generation benefit evaluation by using the SVM method (SVM방법을 이용한 풍력발전기 고장 예측 및 발전수익 평가)

  • Shin, Jun-Hyun;Lee, Yun-Seong;Kim, Sung-Yul;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.5
    • /
    • pp.60-67
    • /
    • 2014
  • Wind power is one of the fastest growing renewable energy sources. The blades length and tower height of wind turbine have been growing steadily in the last 10 years in order to increase the output amount of wind power energy. The amount of wind turbine energy is increased by increasing the capacity of wind turbine, but the costs of preventive, corrective and replacement maintenance are also increased accordingly. Recently, Condition Monitoring System that can repair the fault diagnose and repair of wind turbine in the real-time. However, these system have a problem that cannot predict and diagnose of the fault. In this paper, wind turbine predict methodology is proposed by using the SVM method. In the case study, correlation analysis between wind turbine fault and external environmental factors is performed by using the SVM method.