• Title/Summary/Keyword: preliminary design procedure

Search Result 167, Processing Time 0.026 seconds

Study on the Integrated UAV Simulation Environment for the Evaluation of the Midair Collision Alarm System (공중충돌경보시스템 평가를 위한 통합 무인기 시뮬레이션환경 연구)

  • Mun, Seong-yeop;Kim, Ju-young;Lee, Dong-woo;Baek, Gyeong Min;Kim, Jin Sil;Na, Jongwhoa
    • Journal of Advanced Navigation Technology
    • /
    • v.19 no.4
    • /
    • pp.288-298
    • /
    • 2015
  • For the commercialization of unmanned aircraft, we must validate the safety of the air/ground collision alert systems (CAS). The validation procedure of CAS requires the flight test which is not only expensive but also dangerous. To alleviate this problem, we need the simulation based validation process for the CAS. We developed an integrated UAV simulation (IUS) environment which interconnect the flight simulator, the Matlab/Simulink, and a target avionics simulation model. We developed the collision warning module of the TCAS and tested using IUS and flight encounter models. Using IUS, we can evaluate the performance and reliability of a target avionic system at the preliminary design stage of a development life cycle.

LightSpeed and SimpliFil : Designed for Successful Endodontics

  • Senia, Steve
    • Proceedings of the KACD Conference
    • /
    • 2001.05a
    • /
    • pp.259-259
    • /
    • 2001
  • ;A new root canal instrument and instrumentation technique: a preliminary report. Cleaning and shaping the root canal system has been and continues to be a challenge for even the most experienced endodontist. Curved. narrow canals. in particular. cause difficulties for the beginner as well as the specialist. A new instrument designed to incorporate new concepts was developed to ameliorate the problems in cleaning and shaping root canal systems. This new instrument has been given the name of SW (Senia and Wildey). The new SW instrument uses controlled right and left rotational forces. This motion was used to clean and shape simulated root canals in plastic blocks and root canals in extracted teeth. Instrumentation appeared to be easier. faster. and more precise than with conventional instruments. especially in curved canals where there was remarkable reduction of canal transportation. A mechanical version of the SW instrument was also developed. It was used to flare the coronal portion of the root canal system. Wildey WL. Senia ES., Oral Surg Oral Med Oral Pathol1989 Feb:67(2):198-207 Another look at root canal instrumentation. Several aspects of root canal instrumentation need additional research. Various factors must be considered in an analysis of instrumentation of the root canal system: the dentin that is cut: the technique used to cut it: the design of the instruments: the material and manufacturing process used to make the instruments: the irrigant used during the procedure: and the anatomic configuration of the root canal system. An analysis of these factors clearly indicates that existing root canal instruments and techniques are less than ideal and. in fact. do not accomplish what is expected of them. Root canals must be properly. but. at the same time. destructive and unnecessary removal of dentin should be kept to a minimum. The Flex-R and Canal Master instruments were developed to address some of the shortcomings of existing instruments and techniques. More scientifically based research is needed to fully evaluate these new instruments and techniques and to develop future instruments. Wildey WL; Senia ES. Montgomery S., Oral Surg Oral Med Oral Pathol1992 Oct:74(4):499-50799-507

  • PDF

Analysis of surface settlement troughs induced by twin shield tunnels in soil: A case study

  • Ahn, Chang-Yoon;Park, Duhee;Moon, Sung-Woo
    • Geomechanics and Engineering
    • /
    • v.30 no.4
    • /
    • pp.325-336
    • /
    • 2022
  • This paper analyzes the ground surface settlements induced by side-by-side twin shield tunnels bored in sedimentary soils, which primarily consist of sand with clay strata above the tunnel crown. The measurements were obtained during the construction of twin tunnels underneath the Incheon International Airport (IIA) located in Korea. The measured surface settlement troughs are approximated with Gaussian functions. The trough width parameters i and K of the settlement troughs produced by the first and second tunnel passings are determined, along with those for the total settlement trough. The surface settlement troughs produced by the first shield passing are reasonably represented by a symmetric Gaussian curve. The surface settlement troughs induced by the second shield tunnel display marginal asymmetric shapes at selected sections. The total settlement troughs are fitted both with a shifted symmetric Gaussian function and the superposition method utilizing an asymmetric function for the incremental trough produced by the second tunnel. It is revealed that the superposition method does not always produce better fits with the total settlement. Instead, the shifted symmetric Gaussian function is overall demonstrated to provide more favorable agreements with the recordings. Therefore, the shifted symmetric Gaussian function is recommended to be used in the design for the prediction of the settlement in clays caused by twin tunneling considering the simplicity of the procedure compared with the superposition method. The amount of increase in the width parameter K for the twin tunnel relative to that for the single tunnel is quantified, which can be used for a preliminary estimate of the surface settlement in clay induced by twin shield tunnels.

Development of Real-time Mission Monitoring for the Korea Augmentation Satellite System

  • Daehee, Won;Koontack, Kim;Eunsung, Lee;Jungja, Kim;Youngjae, Song
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.12 no.1
    • /
    • pp.23-35
    • /
    • 2023
  • Korea Augmentation Satellite System (KASS) is a satellite-based augmentation system (SBAS) that provides approach procedure with vertical guidance-I (APV-I) level corrections and integrity information to Korea territory. KASS is used to monitor navigation performance in real-time, and this paper introduces the design, implementation, and verification process of mission monitoring (MIMO) in KASS. MIMO was developed in compliance with the Minimum Operational Performance Standards of the Radio Technical Commission for Aeronautics for Global Positioning System (GPS)/SBAS airborne equipment. In this study, the MIMO system was verified by comparing and analyzing the outputs of reference tools. Additionally, the definition and derivation method of accuracy, integrity, continuity, and availability subject to MIMO were examined. The internal and external interfaces and functions were then designed and implemented. The GPS data pre-processing was minimized during the implementation to evaluate the navigation performance experienced by general users. Subsequently, tests and verification methods were used to compare the obtained results based on reference tools. The test was performed using the KASS dataset, which included GPS and SBAS observations. The decoding performance of the developed MIMO was identical to that of the reference tools. Additionally, the navigation performance was verified by confirming the similarity in trends. As MIMO is a component of KASS used for real-time monitoring of the navigation performance of SBAS, the KASS operator can identify whether an abnormality exists in the navigation performance in real-time. Moreover, the preliminary identification of the abnormal point during the post-processing of data can improve operational efficiency.

Stiffness Degradation Induced by Seismic Loading on a RC Shear Wall (지진하중에 의한 철근콘크리트 전단벽의 강성 저하에 관한 연구)

  • Lee, Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.3
    • /
    • pp.48-54
    • /
    • 2022
  • This research describes a quantitative procedure used to estimate the effect of concrete cracking on stiffness degradation of concrete shear walls and provides analytical references for the seismic design of concrete shear walls. As preliminary research on the seismic response of concrete shear walls, nonlinear transient analysis was performed with commercial FE software. The study presents the nonlinear time history analysis results in terms of concrete damage and cracking behavior induced by seismic input motions. By varying the input motions, concrete strength and shear wall thickness, the seismic responses of a shear wall were examined with nonlinear time history analysis, and the progressive cracking behavior and corresponding hysteresis loop were described. Based on the analysis results, frequency and stiffness degradation of the shear wall from progressive concrete damage and cracking were captured with respect to the seismic levels. The results of this study suggest that stiffness degradation from concrete cracking should be appropriately considered when determining the seismic capacity of RC shear wall structures.

A study on conceptual evaluation of structural stability of room-and-pillar underground space (주방식 지하공간의 구조적 안정성 평가개념 정립에 관한 연구)

  • Lee, Chulho;Chang, Soo-Ho;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.585-597
    • /
    • 2013
  • In this study, in order to evaluate stability of the room-and-pillar underground structure, a series of preliminary numerical analyses were performed. Design concept and procedure of an underground structure for obtaining a space are proposed, which should be different from structural design for the room-and-pillar in mine. With assumed material properties, a series of numerical analyses were performed by varying size ratios of room and pillar and then the failure modes and location at yielding initiation were investigated. From the results, relationship between the ratio of pillar width to the roof span (w/s) and overburden pressure at failure initiation shows a relatively linear relation, and the effect of w/s on structural stability is much more critical than the ratio of pillar width and height (w/H) which is a crucial parameter in design of the room-and-pillar mining. It means that roof tensile failure and shear failure at shoulder and pillar are necessary to be considered together for confirming overall structural stability of the room-and-pillar structure, rather than considering the pillar stability only in mining. Failure modes and location at failure initiation were varied with respect to the ratio of room and pillar widths. Therefore, it is necessary to simultaneously consider stability of both roof span and pillar for design of underground structure by the room-and-pillar method.

Behavior Analysis of Concrete Structure under Blast Loading : (I) Experiment Procedures (폭발하중을 받는 콘크리트 구조물의 실험적 거동분석 : (I) 실험수행절차)

  • Yi, Na Hyun;Kim, Sung Bae;Kim, Jang-Ho Jay;Choi, Jong Kwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5A
    • /
    • pp.557-564
    • /
    • 2009
  • In recent years, there have been numerous explosion-related accidents due to military and terrorist activities. Such incidents caused not only damages to structures but also human casualties, especially in urban areas. To protect structures and save human lives against explosion accidents, better understanding of the explosion effect on structures is needed. In an explosion, the blast overpressure is applied to concrete structures as an impulsive load of extremely short duration with very high pressure and heat. Generally, concrete is known to have a relatively high blast resistance compared to other construction materials. However, information and test results related to the blast experiment of internal and external have been limited due to military and national security reasons. Therefore, in this paper, to evaluate blast effect on reinforced have concrete structure and its protective performance, blast tests are carried out with $1.0m{\times}1.0m{\times}150mm$ reinforce concrete slab structure at the Agency for Defence Development. The standoff blast distance is 1.5 m and the preliminary tests consists with TNT 9 lbs and TNT 35 lbs and the main tests used ANFO 35 lbs. It is the first ever blast experiment for nonmilitary purposes domestically. In this paper, based on the basic experiment procedure and measurement details for acquiring structural behavior data, the blast experimental measurement system and procedure are established details. The procedure of blast experiments are based on the established measurement system which consists of sensor, signal conditioner, DAQ system, software. It can be used as basic research references for related research areas, which include protective design and effective behavior measurements of structure under blast loading.

A Methodology for Quality Control of Railroad Trackbed Fills Using Compressional Wave Velocities : II. Verification of Applicability (압축파 속도를 이용한 철도 토공노반의 품질관리 방안 : II. 적용성 검증)

  • Park, Chul-Soo;Mok, Young-Jin;Hwang, Seon-Keun;Park, In-Beom
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.9
    • /
    • pp.57-66
    • /
    • 2009
  • In the preliminary investigation (Park et al., 2009), the use of compressional wave velocity and its measurement techniques were proposed as a new quality control measure for trackbed fills. The methodology follows exactly the same procedure as the density control, except the density being replaced by the compressional wave velocity involving consistently with resilient modulus of design stage. The specifications for the control also include field compaction water content of optimum moisture content ${\pm}2%$ as well as the compressional wave velocity. In this sequel paper, crosshole and resonant column tests were performed as well direct-arrival method and laboratory compressional wave measurements to verify the practical applicability of a methodology far the new quality control procedure based upon compressional wave velocity. The stress-modified crosshole results reasonably well agree with the direct-arrival values, and the resonant column test results also agree well with the field crosshole results. The compressional wave velocity turned out to be an excellent control measure for trackbed fills both in the theoretical and practical point of view.

Development of Practical Problem-Based Home Economics Teaching.Learning Process Plans by Blended Learning Strategy - Focusing on a Unit 'the Youth and Consumer Life' - (Blended Learning(BL) 전략을 활용한 실천적 문제 중심 가정과 교수 학습 과정안 개발 - '청소년과 소비생활' 단원을 중심으로 -)

  • Lee, Jin-Hee;Chae, Jung-Hyun
    • Journal of Korean Home Economics Education Association
    • /
    • v.20 no.4
    • /
    • pp.19-42
    • /
    • 2008
  • The purpose of this study was to develop practical problem-based home economics teaching.learning process plans about a unit 'the youth and consumer life' of middle school eighth-grade Technology and Home Economics by applying blended learning(BL) strategy. According to ADDIE instructional design model, this study was conducted in the following procedure: analysis, design/development, implementation, and evaluation. In the stage of design and development, the selected unit was converted into a practical problem-based unit, and practical problem-based teaching. learning process plans were designed in detail by using BL strategy. An online study room for practical problem-based home economics instruction grounded in BL strategy was prepared by using Edunet(http://community.edunet4u.net/${\sim}$consumer2). Eight-session lesson plans were mapped out, and study aids for students and materials for teachers were prepared. In the implementation stage, the first-session teaching plans that dealt with a minor question 'what preparations should be made to become a wise consumer' were utilized when instruction was provided to 115 eighth graders who were in three different province, and the other one was in a middle school in the city of Daejeon. The experimental teaching was implemented for two weeks in the following procedure: preliminary program, pre-online learning, main instruction and post- online learning. The preliminary program was carried out in a session in the classroom, and pre-online learning was provided before the main instruction was given in a session in the classroom. After the main instruction was completed, post-online learning was offered. In the evaluation stage, a survey was conducted on all the learners and teachers to find out their opinions and suggestions.

  • PDF

Characteristics and Energy Absorbing Capacity for Rockfall Protection Fence from In-Situ Rockfall Tests (현장 낙석실험을 통한 낙석방지울타리의 특성 및 성능 평가)

  • 구호본;박혁진;백영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.6
    • /
    • pp.111-121
    • /
    • 2001
  • Rockfall protection fences are used for diminishing rockfall damage in roads side slopes. In order to install the fences in effective way, the conditions of rock slopes and total predicted impact energy of fa11ing rock should be considered. However, the fences have been constructed without any consideration for lithology, height and slope angle of rock slope in Korea. In addition, the information about the performance of the protection fences, which should be evaluated by in-situ test or laboratory test in order to check out the practical use in the field, is not available. Therefore, in design manual for the rockfall protection fence, the specific details for the installation of this type of fence are not provided yet. The full sized rockfall in situ test was carried out for the calculation of falling energy of rock and the evaluation of the maximum energy absorbing capacity of fence. For this test, the rock slopes whose heights are about 20 m and dip angle of 65 degree, have been chosen. This is because those geometries are mean height and slope angle of most road cut slopes along Korean national highway. Based on the preliminary simulation procedure, four different sizes of concrete ball (0.7, 1.3, 2.3 and 4.3 ton) were prepared and flour different types of protection fence were constructed. The results of this test provide information about the maximum energy absorbing capacity of the fence, kinetic energy of rockfall and restitution coefficient, and these results can be utilized in the establishment of rockfall fence design and construction manual.

  • PDF