• 제목/요약/키워드: prefabricated system

검색결과 137건 처리시간 0.024초

연직배수재를 이용한 토양세정시스템의 오염토양정화 특성 (The Characteristics of Soil Remediation by Soil Flushing System Using PVDs)

  • 박정준
    • 한국환경복원기술학회지
    • /
    • 제10권5호
    • /
    • pp.76-86
    • /
    • 2007
  • For the purpose of ground improvement by means of soil flushing systems. Incorporated technique with prefabricated vertical drains have been used for dewatering from fine-grained soils. The laboratory model tests were performed by using the flushing tracer solutions for silty soils and recorded the tracer concentration changes with the elapsed time and flow rates. A mathematical model for prediction of contaminant transport using the PVD technology has been developed. The clean-up times for the predictions on both soil condition indicate more of a sensitivity to the dispersivity parameter than to the extracted flow rate and vertical velocity parameters. Based on the results of the analyses, numerical analysis indicate that the most important factor to the in-situ soil remediation in prefabricated vertical drain system is the effective diameter of contaminated soil.

조립식 버팀보로 지지된 흙막이 구조물의 거동 특성에 관한 연구 (Characteristics of Walls Supported by Prefabricated Strut)

  • 김낙경;박종식
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.553-560
    • /
    • 2003
  • From the analytical standpoint, it is advantageous to consider the behavior of supported walls as plane strain condition. But supported walls constitute geotechnical problems which, in strut terms, are not plane strain cases. These represent differences between the measured and the predicted due to the stiffness and spacing of supported walls and the behavior of discontinuous walls such as solider beams with lagging. This study is to investigate simulations of a system behavior along a horizontal section of walls supported by prefabricated strut. Using a beam column method, relative effects associated with prefabricated strut stiffness and spacing in a systematic behavior were investigated.

  • PDF

Experiments on Shear Connections of PSC Girders with Prefabricated Slabs

  • 심창수;정철헌;현병학;김영진
    • 콘크리트학회논문집
    • /
    • 제16권4호
    • /
    • pp.573-579
    • /
    • 2004
  • For the fast construction and replacement of bridges in urban area, a prefabricated bridge system can be an excellent alternative. Details of prefabricated slabs for PSC girders were developed and static tests on shear connections were conducted to propose design equations of the shear connection. Stirrups and stud connectors were used as shear connectors and non-shrink mortar was used for the filling material in shear pockets for shear connectors. Stirrups and studs were fabricated to insert embedded nut-type devices in PSC girders. Shear strength of the shear connection considering chemical bond, friction and mechanical connectors was evaluated and empirical equations were suggested. Due to the mechanical connectors, ultimate slip capacity of the shear connection was sufficient for shear load redistribution, and suggested details of the shear connection showed good performance in terms of strength and ductility.

주조 포오스트의 적합도에 관한 연구 (A STUDY ON THE ADAPTATION OF THE CAST POST)

  • 박동관;장익태
    • 대한치과보철학회지
    • /
    • 제24권1호
    • /
    • pp.55-65
    • /
    • 1986
  • An in vitro study was performed to evaluate adaptation of custom direct, custom indirect, and prefabricated post system on 15 extracted upper central incisors. 15 specimens were prepared and equally devided into 3 groups under random sampling. Each group of 5 cast posts was made with custom direct, custom indirect, and prefabricated post core method. Gap between inner wall of the dentin and outer wall of the cast post was measured on electron microphotographic prints at x500 magnification. The result were as follows ; 1. No significant difference of adaptation at cervical portion was found between each method. 2. Prefabricated post core method had poor adaptation compared with other methods. 3. Even distribution of adaptation was found in custom direct method between each portion. 4. Prefabricated post core method showed remarkable difference in adaptation between each portion.

  • PDF

MANAGERIAL AND ECONOMIC OPTIMIZATIONS FOR PREFABRICATED BUILDING SYSTEMS

  • Ahmed Abdallah
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-614
    • /
    • 2005
  • This paper deals with new realizations of research, scientific development, managerial and economic optimizations for prefabricated building systems. In the literature, all scientific fields are worked out based on the efficiencies, costs, benefits, choice of execution design, technical demands, aesthetical point of view, as well as the total economics. In the present example of a school-building for communities in the third world, the following criteria have been regarded: The optimal superstructure of prefabricated concrete building systems; the particularity of countries of the Third World (e.g. the climate, the political and the economic conditions); the time for construction and necessary innovative developments for an economically optimized superstructure. Added to this are alternative construction-methods and costs for a simple but variable system which can be adapted to changing functions, where variability should be the main point. For example, a school building that is to be adapted by varying number of rooms to cater for the growing number of pupils.

  • PDF

현행설계법 및 하중저항계수설계법에 의한 완전 조립식 교량 하부구조의 설계결과 비교 (Design Comparison of Totally Prefabricated Bridge Substructure Systems Designed by Present Design and LRFD Methods)

  • 김태훈;김영진;신현목
    • 한국지진공학회논문집
    • /
    • 제15권2호
    • /
    • pp.11-22
    • /
    • 2011
  • 개발된 완전 조립식 교량 하부구조에 대한 설계비교와 비선형 해석을 수행하였다. 조립식 교량 하부구조는 현행설계법과 하중저항계수설계법으로 설계하였다. 설계시에는 현 도로교설계기준에 규정된 DB-24 및 DL-24 설계활하중을 적용하였다. 이 연구는 비선형 유한요소해석을 통해서 완전 조립식 교량 하부구조의 현행 설계법인 KHBD (2005)와 AASHTO-LRFD (2007)를 평가하였다. 사용된 프로그램은 철근콘크리트 구조물의 해석을 위한 RCAHEST이다.

일본 목조주택의 형성과정과 공급실태에 관한 연구 (Research on the process and the provision of the japanese Wooden House)

  • 안국진
    • 한국디지털건축인테리어학회논문집
    • /
    • 제11권2호
    • /
    • pp.71-81
    • /
    • 2011
  • This research explores about the construction process and provision of Japanese Wooden Houses. Even though Prefabricated Houses appeared during the 1960's and the Platform Construction System during the 1970's, there was still a high demand for Conventional Wooden House, with a high demand by households on their 30's. These features were found in the areas of Hokkaido, Kyushu, Tokyo, and Osaka. Tokyo and capital region accommodate large number of the head offices of companies that produce Platform Construction System houses, and thus supply the largest amount of Platform Construction System houses. In capital region, land prices are so high, that they build houses as 3-Floors or above, and also driven by high cost of house construction, house performances are excellent. The houses of Osaka and Kinki region demonstrate similar characteristics to those of capital region. Osaka is headquartered by a group of head offices of companies that produce prefabricated houses, and thus holds more amount of prefabricated house supply than other regions. This city also shows high cost of house construction no less than capital region, and thus offers outstanding performance of house. In Kyushu, whereas Japanese wooden house building systems are supplied the most, Platform Construction System houses are provided the least in the nation. As this region offers rich amount of forest resources owing to mild humid climate which is ideal for vegetations, the Japanese wooden building systems use the timbers from this region. Hokkaido, a cold region, requires houses that offer outstanding performance of heat insulation. Therefore, Hokkaido shows more supplies of Platform Construction System houses that offers outstanding heat insulation performance. They import the timbers that form the structure framework of Platform Construction System houses from North America.

Prediction of force reduction factor (R) of prefabricated industrial buildings using neural networks

  • Arslan, M. Hakan;Ceylan, Murat;Kaltakci, Yaspr M.;Ozbay, Yuksel;Gulay, Fatma Gulten
    • Structural Engineering and Mechanics
    • /
    • 제27권2호
    • /
    • pp.117-134
    • /
    • 2007
  • The force (load) reduction factor, R, which is one of the most important parameters in earthquake load calculation, is independent of the dimensions of the structure but is defined on the basis of the load bearing system of the structure as defined in earthquake codes. Significant damages and failures were experienced on prefabricated reinforced concrete structures during the last three major earthquakes in Turkey (Adana 1998, Kocaeli 1999, Duzce 1999) and the experts are still discussing the main reasons of those failures. Most of them agreed that they resulted mainly from the earthquake force reduction factor, R that is incorrectly selected during design processes, in addition to all other detailing errors. Thus this wide spread damages caused by the earthquake to prefabricated structures aroused suspicion about the correctness of the R coefficient recommended in the current Turkish Earthquake Codes (TEC - 98). In this study, an attempt was made for an approximate determination of R coefficient for widely utilized prefabricated structure types (single-floor single-span) with variable dimensions. According to the selecting variable dimensions, 140 sample frames were computed using pushover analysis. The force reduction factor R was calculated by load-displacement curves obtained pushover analysis for each frame. Then, formulated artificial neural network method was trained by using 107 of the 140 sample frames. For the training various algorithms were used. The method was applied and used for the prediction of the R rest 33 frames with about 92% accuracy. The paper also aims at proposing the authorities to change the R coefficient values predicted in TEC - 98 for prefabricated concrete structures.

하악 완전 무치악 환자에서 solitary attachment를 연결한 임시 보철물로 조기 부하를 가한 후, 조립식 바를 이용한 최종 임플란트 지지 피개의치 제작증례 (Early loading using tempo denture with solitary attachment system, implant supported overdenture with prefabricated bar attachment system on Mandibular edentulous patient: A case report)

  • 박도현;이소현;전영찬;정창모;윤미정;허중보
    • 대한치과의사협회지
    • /
    • 제54권1호
    • /
    • pp.39-48
    • /
    • 2016
  • SFI-bar is prefabricated bar system and can be assembled at chairside without soldering or welding, thus reducing bone loss, costs and time. A 53-year-old male patient, who had severely absorbed mandible, hoped to wear a stable mandiblular denture. Four implants were placed in the extraction site of canine and 1st molar. Early loaded temporary denture with solitary type attachment was delivered 3 weeks after surgery. 3 month later, SFI-bar was connected and adjusted at chairside. Then, implant overdenture using SFI-bar was delivered. This case report showed that a satisfactory clinical result was achieved by 4-implant-supported overdenture using the SFI-Bar system in a mandibular edentulous patient.

  • PDF

Implant-supported overdenture with prefabricated bar attachment system in mandibular edentulous patient

  • Ha, Seung-Ryong;Kim, Sung-Hun;Song, Seung-Il;Hong, Seong-Tae;Kim, Gy-Young
    • The Journal of Advanced Prosthodontics
    • /
    • 제4권4호
    • /
    • pp.254-258
    • /
    • 2012
  • Implant-supported overdenture is a reliable treatment option for the patients with edentulous mandible when they have difficulty in using complete dentures. Several options have been used for implant-supported overdenture attachments. Among these, bar attachment system has greater retention and better maintainability than others. SFI-Bar$^{(R)}$ is prefabricated and can be adjustable at chairside. Therefore, laboratory procedures such as soldering and welding are unnecessary, which leads to fewer errors and lower costs. A 67-year-old female patient presented, complaining of mobility of lower anterior teeth with old denture. She had been wearing complete denture in the maxilla and removable partial denture in the mandible with severe bone loss. After extracting the teeth, two implants were placed in front of mental foramen, and SFI-Bar$^{(R)}$ was connected. A tube bar was seated to two adapters through large ball joints and fixation screws, connecting each implant. The length of the tube bar was adjusted according to inter-implant distance. Then, a female part was attached to the bar beneath the new denture. This clinical report describes two-implant-supported overdenture using the SFI-Bar$^{(R)}$ system in a mandibular edentulous patient.