• Title/Summary/Keyword: predict control

Search Result 1,663, Processing Time 0.039 seconds

Prediction of Daily Water Supply Using Neuro Genetic Hybrid Model (뉴로 유전자 결합모형을 이용한 상수도 1일 급수량 예측)

  • Rhee, Kyoung-Hoon;Kang, Il-Hwan;Moon, Byoung-Seok;Park, Jin-Geum
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.4
    • /
    • pp.157-164
    • /
    • 2005
  • Existing models that predict of Daily water supply include statistical models and neural network model. The neural network model was more effective than the statistical models. Only neural network model, which predict of Daily water supply, is focused on estimation of the operational control. Neural network model takes long learning time and gets into local minimum. This study proposes Neuro Genetic hybrid model which a combination of genetic algorithm and neural network. Hybrid model makes up for neural network's shortcomings. In this study, the amount of supply, the mean temperature and the population of the area supplied with water are use for neural network's learning patterns for prediction. RMSE(Root Mean Square Error) is used for a MOE(Measure Of Effectiveness). The comparison of the two models showed that the predicting capability of Hybrid model is more effective than that of neural network model. The proposed hybrid model is able to predict of Daily water, thus it can apply real time estimation of operational control of water works and water drain pipes. Proposed models include accidental cases such as a suspension of water supply. The maximum error rate between the estimation of the model and the actual measurement was 11.81% and the average error was lower than 1.76%. The model is expected to be a real-time estimation of the operational control of water works and water/drain pipes.

VLSI Design for Automatic Magnetizing and Inspection System (자동착자 및 검사자동화 시스템을 위한 집적회로 설계)

  • Im, Tae-Yeong;Lee, Cheon-Hui
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.7
    • /
    • pp.1929-1940
    • /
    • 1999
  • In this paper a VLSI design for the automatic magnetizing and inspection system has been presented. This is a design of a peripheral controller, which magnetizes CRTs and computer monitors and controls the automatic inspection system. We implemented a programmable peripheral interface(PPI) circuit of the control and protocol module for the magnetizer controller by using a 0.8um CMOS SOG technology of ETRI. Most of the PPI functions have been confirmed. In the conventional method, the propagation/ramp delay model was used to predict the delay of cells, but used to model on only a single cell. Later, a modified "linear delay predict model" was suggested in the LODECAP(LOgic DEsign CAPture) by adding some factors to the prior model. But this has not a full model on the delay chain. In this paper a new " delay predict equation" for the design of the timing control block in PPI system has been suggested. We have described the detail method on a design of delay chain block according to the extracted equation and applied this method to the timing control block design. And we had descriptions on the other blocks of this system.

  • PDF

The Roundness Prediction at Numerical Control Machine Using Neural Network (수치제어 공작기계에서 신경망을 이용한 진원도 예측)

  • Shin, Kwan-Soo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.18 no.3
    • /
    • pp.315-320
    • /
    • 2009
  • The purpose of this study is to predict the roundness of Numerical Control Machining so that helps the operator to choose the right machining conditions to produce a product within the given error limits. Learning of neural network is Backpropagation theory. From this study, the base was set to setup the database to produce precisely machined product by predicting the rate of error in the fabrication facility which does not have the environment to analyze it.

  • PDF

Parts Stresss Analysis for Reliability Prediction of Control Module in Plant (부품부하분석을 이용한 발전소 제어모듈의 신뢰도 예측)

  • 김대웅;강희정
    • Journal of Energy Engineering
    • /
    • v.4 no.3
    • /
    • pp.338-343
    • /
    • 1995
  • The objective of this study is to predict the reliability of the electronic control module at ROD control system in nuclear power plant. Maintaining of the reliability is important issue in the complext system like nuclear plower plant, military equipment, satelite system, etc., because the failure of reliability brings etravagant economic loss and deteriorates public acceptance. In addition to the prediction of reliability, the fators affect the reliability including operating condition, environment, temperature and quality factors were analyzed and simulated. The result shows that the quality factors are more critical for the higher reliability than other two factors.

  • PDF

Modeling the Dynamics and Control of Transmission of Schistosoma japonicum and S. mekongi in Southeast Asia

  • Ishikawa, Hirofumi;Ohmae, Hiroshi
    • Parasites, Hosts and Diseases
    • /
    • v.47 no.1
    • /
    • pp.1-5
    • /
    • 2009
  • A mathematical model for transmission of schistosomes is useful to predict effects of various control measures on suppression of these parasites. This review focuses on epidemiological and environmental factors in Schistosoma japonicum and Schistosoma mekongi infections and recent advances in mathematical models of Schistosoma transmission.

Dynamic characteristic identification of PWM solenoid valve for automatic transmission (자동변속기용 펄스폭변조 솔레노이드 밸브의 동특성 식별)

  • Jung, Gyu-Hong;Cho, Baek-Hyun;Lee, Kyo-Il
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.10
    • /
    • pp.1636-1647
    • /
    • 1997
  • As most of today's automatic transmissions in passenger car adopt a electro-hydraulic control system, the role of electronically controlled solenoid valves occupies an important position and it is essential to predict solenoid transient characteristics in order to design and evaluate the performance of the hydraulic control system. However, in general, both the magnetic and electrical parameters f the solenoid system are hardly known and it is not easy to model this section with moderate complexity although mechanical system could be developed using the classical second order system. This paper presents a dynamic modelling technique of a solenoid valve, that is controlled by pulse width modulation for an automatic transmission, in terms of system identification theory. In nonlinear computer simulation, it is shown that the identified systems which produce magnetic force to input duty cycle for various excitation signals predict the static and dynamic performance very well near the operating point and in experiment conducted to confirm the validity of identification theory for PWM solenoid valve, we find that there is a good agreement between the experimental data and simulation result. Hence, this model can be utilized in the development of pressure control system with PWM solenoid valve.

Phenomenological Damping Flow Modeling and Performance Evaluation for a Continuous Damping Control Damper Using MR Fluid (MR 유체를 이용한 연속 감쇠력 가변형 댐퍼를 위한 감쇠유동의 현상학적 모델링과 성능평가)

  • Park, Jae-Woo;Jung, Young-Dae
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.25 no.3
    • /
    • pp.73-82
    • /
    • 2008
  • Recently MR CDC damper has been applied to semi-active suspension control system gradually. Compared to former hydraulic CDC damper, it has rapid time response performance as well as simple internal structure and wide range of damping force. In order to develop control logic algorithm which enables to take maximum advantage of unique characteristics of MR CDC damper, it is inevitable to perform a thorough investigation into its nonlinear performance. In many previous researches, MR fluid model was either simply assumed as Bingham Plastic, or a phenomenological model based on experiment was established instead to predict damping performance of MR CDC damper. These experimental flow model which is not based on flow analysis but intentionally built to fit damping characteristics, may lead to totally different results in case of different configuration or structure of MR CDC damper. In this study, a generalized flow formula from mathematical flow model of MR fluid for annular orifice is derived to analyze and predict damping characteristics when current is excited at piston valve.

Serologic Markers of Excessive Callus formation in Traumatic Brain Injury Patient (다발성 환자에서 뇌 손상이 동반된 장골 골절 시 가골 형성 촉진예측을 위한 혈액검사에 대한 고찰)

  • Park, Hee-Gon;Kim, Yeon-Jun
    • Journal of Trauma and Injury
    • /
    • v.26 no.3
    • /
    • pp.81-88
    • /
    • 2013
  • Purpose: Among patients with multiple traumatic fractures, a tendency to form more callus exists in groups with multiple fractures combined with traumatic brain injury. This retrospective study evaluated the hematologic factors that might be useful to predict callus formation by comparing serologic tests and clinical and radiologic results in two groups. Methods: From January 2000 to December 2010, patients with femur shaft fractures were divided in two groups: one without traumatic brain injury (control group: 32 cases), and the other with traumatic brain injury (study group: 44 cases). We evaluated routine serologic exams and the amount of callus formation during the follow-up period. Results: Only the alkaline phosphatase level was statistically different between the two groups, not the White blood cell count, C-reactive protein, total calcium, and lactate dehydrogenase level. The amount of callus formation on the antero-posterior radiograph at the last follow up period was 74.9% in the study group and 42.1% in the control group. Then lateral radiograph showed 73.2% callus formation rate in the study group and 31.8% in the control group. Conclusion: In routine serologic exams, the two groups had no significant differences, except for the alkaline phosphatase level. The group with traumatic brain injury had much more callus formation, but there was no reliable factor to predict callus formation on the routine serologic exam.

In-Plane Stability of Concrete-Filled Steel Tubular Parabolic Truss Arches

  • Liu, Changyong;Hu, Qing;Wang, Yuyin;Zhang, Sumei
    • International journal of steel structures
    • /
    • v.18 no.4
    • /
    • pp.1306-1317
    • /
    • 2018
  • For determining the in-plane buckling resistance of a concrete-filled steel tubular (CFST) arch, the current technical code GB50923-2013 specifies the use of an equivalent beam-column method which ignores the effect of rise-to-span ratio. This may induce a gap between the calculated result and actual stability capacity. In this study, a FE model is used to predict the buckling behavior of CFST truss arches subjected to uniformly distributed loads. The influence of rise-to-span ratio on the capacity of truss arches is investigated, and it is found that the stability capacity reduces as rise-to-span ratio declines. Besides, the calculations of equivalent slenderness ratio for different truss sections are made to consider the effect of shear deformation. Moreover, based on FE results, a new design equation is proposed to predict the in-plane strength of CFST parabolic truss arches under uniformly distributed loads.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF