• Title/Summary/Keyword: precast plate

Search Result 48, Processing Time 0.02 seconds

Evaluation of long term behavior of steel plate girder bridges with precast concrete decks (프리캐스트 바닥판을 사용한 강합성거더교의 장기기동 해석)

  • Kim, Su-Hyun;Lee, Jong-Min;Cho, Sun-Kyu;Go, Dong-Choon
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1326-1331
    • /
    • 2006
  • The precast concrete deck is one of suitable solutions for replacement and new construction in urban area. However, the precast concrete deck could be a weak point of the steel plate girder bridges structurally due to the connections between precast panels in the longitudinal direction. Thereafter, it is necessary for improvement of durability and load carrying capacity to introduce the prestress force in the longitudinal direction Some cracks of connections at the precast concrete deck may be occurred due to live loads, the difference of temperature and long-term effects. The shrinkage and creep of concrete may significantly affect long-term behaviors which occur tensile stresses at the precast concrete deck of steel plate girder bridges. In this study, the time-dependant analysis program has been developed to determine the initial prestress force in the longitudinal direction considering loss of stress at the precast concrete deck. Also it has been estimated the initial prestress force by construction stages and shapes of girder.

  • PDF

Effect of Anchorage on Strength of Precast R/C Beam-Column Joints

  • Kim, Kwangyeon
    • Architectural research
    • /
    • v.2 no.1
    • /
    • pp.55-60
    • /
    • 2000
  • Recently, there is a great demand for precast reinforced concrete (RC) construction methods on the purpose of simplicity in construction. Nishimatsu Construction Company has developed a construction method with precast reinforced concrete members in medium-rise building. In this construction method, how to joint precast members, especially the anchorage of the main bar of beam, is important problem. In this study, the structural performance of exterior joints with precast members was investigated. The parameters of the test specimens are anchorage type of the main bar of beam (U-shape anchorage or anchorage plate) and the ratio of the column axial force to the column strength. Specimens J-3 and J-4 used U-shape anchorage and the ratio of the column axial force of specimen J-4 was higher. On the other hand, specimens J-5 and J-6 used anchorage plate, and the anchorage lengths are 15d and 18d, respectively. Experimental results are summarized as follows; 1) For the joints with beam flexural failure mode, it was found that the maximum strength of specimen with anchorage plate is equal to or larger than that of specimen with conventional U-shaped anchorage if the anchorage length of more than 15d would be ensured, 2) Each specimen shows stable hysteretic curves and there were no notable effects on the hysteretic characteristics and the maximum strength caused by the anchorage method of beam main bar and the difference of column axial stress level.

  • PDF

An experimental study of the behaviour of double sided welded plate connections in precast concrete frames

  • Gorgun, Halil
    • Steel and Composite Structures
    • /
    • v.29 no.1
    • /
    • pp.1-22
    • /
    • 2018
  • Multi-storey precast concrete skeletal structures are assembled from individual prefabricated components which are erected on-site using various types of connections. In the current design of these structures, beam-to-column connections are assumed to be pin jointed. Welded plate beam to-column connections have been used in the precast concrete industry for many years. They have many advantages over other jointing methods in component production, quality control, transportation and assembly. However, there is at present limited information concerning their detailed structural behaviour under bending and shear loadings. The experimental work has involved the determination of moment-rotation relationships for semi-rigid precast concrete connections in full scale connection tests. The study reported in this paper was undertaken to clarify the behaviour of such connections under symmetrical vertical loadings. A series of full-scale tests was performed on sample column for which the column geometry and weld arrangements conformed with successful commercial practice. Proprietary hollow core slabs were tied to the beams by tensile reinforcing bars, which also provide the in-plane continuity across the connections. The strength of the connections in the double sided tests was at least 0.84 times the predicted moment of resistance of the composite beam and slab. The secant stiffness of the connections ranged from 0.7 to 3.9 times the flexural stiffness of the attached beam. When the connections were tested without the floor slabs and tie steel, the reduced strength and stiffness were approximately a third and half respectively. This remarkable contribution of the floor strength and stiffness to the flexural capacity of the joint is currently neglected in the design process for precast concrete frames. In general, the double sided connections were found to be more suited to a semi-rigid design approach than the single sided ones. The behaviour of double sided welded plate connection test results are presented in this paper. The behaviour of single sided welded plate connection test results is the subject of another paper.

Foundation System with Precast Concrete Bearing Plate (프리캐스트 콘크리트 베어링 플레이트를 이용한 기초구조 시스템)

  • 이원호;문정호;이용재;이한준
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.853-860
    • /
    • 1999
  • A large concentrated load is often transferred to reinforced concrete footing in a tall building. In this study, a foundation system which used high strength precast concrete bearing plate was proposed. This concrete bearing plate has to be strong enough to resist the column load. However, a sufficient bearing strength may not be provided if the column load is too high and the concrete of bearing plate does not have enough strength.

  • PDF

Compressibility behaviour of peat reinforced with precast stabilized peat columns and FEM analysis

  • Kalantari, Behzad;Rezazade, Reza K.
    • Geomechanics and Engineering
    • /
    • v.9 no.4
    • /
    • pp.415-426
    • /
    • 2015
  • Researches have been done to discover ways to strengthen peat soil deposits. In this model study, fibrous peat that is the most compressible types of peat has been reinforced with precast peat columns stabilized with ordinary Portland cement and polypropylene fibres. Rowe cell consolidation tests as well as plate load tests (PLTs) were conducted on various types of test samples to evaluate the strength and deformation of untreated peat and peat reinforced by various types of columns. PLTs were conducted in a specially designed and fabricated circular steel test tank. The compression index ($C_c$) and recompression index ($C_r$) of fibrous peat samples reduced considerably upon use of precast columns. Also, PLT results confirmed the results obtained from Rowe cell tests. Use of polypropylene fibres added to cement further decreased ($C_c$) and ($C_r$) and increased load bearing capacity of untreated peat. Finite element method (FEM) using Plaxis 3D was carried out to evaluate the stress distributions along various types of tested samples and also, to compare the deformations obtained from FEM analysis with the actual maximum deformations found from PLTs. FEM results indicate that most of the induced stresses are taken on the upper portion of tested samples and reach their maximum values below the loading plate. Also, a close agreement was found between actual deformation values obtained from PLTs and values resulted from FEM analysis for various types of tested samples.

A Study on the Development of a Ultra-Strength Precast Concrete Bearing Concrete Bearing Plate (초고강도 ($\acute{f}_{C91}$= 950kg/$\textrm{cm}^2$) P.C Bearing Plate 개발에 관한 연구)

  • 소현창;정병욱;김재우;문성규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.643-648
    • /
    • 1997
  • P.C Bearing Plate method, corresponding to the existing steel plate build-up method, is developed by the very first in domestic and is applied to the foundation in the HYUNDAI building at Kang-Nam. P. C Bearing Plate produced in ourself P.C plant can stand against vertical load of 7,000ton obtaining allowable force of soil. It is possible to minmize cost expediting, do site assembling and omit unnecessary excavation work by plant prefabrication of foundation member. The purpose of this paper is to study the optimum mixing design of Ultra-high strength concrete ($\acute{f}_{C91}$= 950kg/$\textrm{cm}^2$), crack control through measuring the heat of hydration, mock up test for the optimum curing method. As mentioned above, developing the Ultra-high strength Precast Concrete Bearing Plate set up successfully in the site foundation work of the HYUNDAI Building at Kang-Nam.

  • PDF

Behavior of simple precast high-strength concrete beams connected in the maximum bending moment zone using steel extended endplate connections

  • Magdy I. Salama;Jong Wan Hu;Ahmed Almaadawy;Ahmed Hamoda;Basem O. Rageh;Galal Elsamak
    • Steel and Composite Structures
    • /
    • v.50 no.6
    • /
    • pp.627-641
    • /
    • 2024
  • This paper presents an experimental and numerical study to investigate the behavior of the precast segmental concrete beams (PSCBs) utilizing high-strength concrete (HSC) connected in the zone of the maximum bending moment using steel extended endplate connections (EECs). The experimental study consisted of five beams as follows: The first beam was the control beam for comparison, which was an unconnected one-piece beam made of HSC. The other four other beams consisted of two identical pieces of precast concrete. An important point to be noted is that at the end of each piece, a steel plate was used with a thickness of 10 mm. Moreover, this steel plate was welded to the lower and upper reinforcing bars of the beam. Furthermore, the steel plate was made to connect the two pieces using the technique of EECs. Several variables were taken in these four beams, whether from the shape of the connection or enhancing the behavior of the connection using the post-tensioning technique. EECs without stiffeners were used for some of the tested beams. The behavior of these connections was improved using stiffeners and shear bolts. To get accurate results, a comparison was made between the behaviors of the five beams. Another important point to be noted is that Abaqus and SAP2000 programs were used to investigate the behavior of PSCBs and to ensure the accuracy of the modeling process which showed a good agreement with the experimental results. Additionally, the simplified modeling using SAP2000 was able to model the nonlinear behavior of PSCBs connected using steel EECs. It was found that the steel pre-tensioned bolted EECs, reinforced with steel stiffeners and shear anchors, could be used to connect the precast HSC segmental beams via the internal pre-stressing technique.

A Study on the Fabricated Concrete Deck Bridges (상판 조립식 교량 구조 개발에 관한 연구)

  • Goo, Min-Se;Chung, Ran;Kim, Gung-Hwan;Shin, Dong-Gi
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1992.04a
    • /
    • pp.137-142
    • /
    • 1992
  • The purpose of this study is to develop a new structural system for precast deck plate bridge. In order to investigate load distribution and composite effects by connecting diaphragms and precast deck plate to main girder with shear keys, computer analysis with F.E.M S/W package program ADINA was carried out. As results of analysis, the following could be concluded : -The distance between diaphragms with6m is suficient for crossing load distribution effects. -The composite effects by connection deck plate to main girder with shear key is reasonable. -The gap between deck plate and main girder under given load is negligible.

  • PDF

Development of the Track System for a LIM Type Maglev (LIM 방식 자기부상철도의 궤도시스템 개발)

  • Yeo, In-Ho;Kim, Dong-Seok;Jang, Seung-Yup;Hwang, Sung-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.800-805
    • /
    • 2009
  • This paper proposes the track system with twin block sleeper for a LIM type maglev railroad. Because a LIM type maglev railroad is expected to be constructed in inner city, social costs can be required under construction. Accordingly, superstructure using precast plate was adopted and twin block sleeper which can be constructed together with precast plate was developed to reduce the construction period. To examine the structural safety of the proposed track system with twin block sleeper, the finite element analyses and the laboratory experiments were performed. Also, the workability of the proposed track system was investigated through the construction simulation test and construction experience in test bed.

Shear Behaviour of Precast Concrete Modular Beam Using Connecting Plate (연결 플레이트를 사용한 프리캐스트 콘크리트 모듈러 보의 전단성능)

  • Cho, Chang Geun;Ro, Kyong Min;Lee, Young Hak
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.4
    • /
    • pp.65-72
    • /
    • 2021
  • The Precast concrete(PC) modular structures are a method of assembling pre-fabricated unit modules in the construction site. The essential aim of modular structures is to introduce a connection method that can ensure splicing performance and effectively resist shear strength. This study proposed PC module using a connecting plate that can replace splice sleeves and shear keys used in the conventional PC modular structures. To evaluate the splicing performance and shear capacity of the proposed method, the shear test was conducted by fabricating one monolithic reinforced concrete(RC) beam and two PC modular beams with a shear span-to-depth ratio as variables. The experimental results showed that the shear capacity of the PC modular beam was about 89% compared to that of the RC beam, and showed a failure of the RC beam according to the shear span-to-depth ratio. Therefore, it was considered that the connecting plate effectively transferred the stress between each PC module through the joint and ensure integrity. In addition, the applicability of shear strength equation of ACI 318-19 and Zsutty's equation to PC modular beams were evaluated. Results demonstrated that the improved shear strength equations are needed to consider reduction of shear strength in PC modules.