• Title/Summary/Keyword: pre-checking

Search Result 104, Processing Time 0.016 seconds

A study on the Development of BIM-based Quality Pre-checking System in Architecture Design Phase

  • Shin, Jihye;Choi, Jungsik;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.284-288
    • /
    • 2015
  • Recently, the mandate on utilizing BIM implemented by public institutions of many countries has great impact on the significantly increasing practices of BIM. The improvement of work efficiency and productivity, which is occurred by BIM adoption, depends on the consistency and accuracy of data. To maximize the benefit of BIM, the interests in BIM data quality have been enlarging all over the world. The BIM data quality pre-check, which is conducted by designer in the design phase, offers opportunities for quality improvement by continuously assessing BIM data. However, BIM quality pre-check is being conducted under arbitrary interpretation of users because of the absence of specific review factors and assessment methods for checking BIM quality. The purpose of this study is to establish an automated BIM quality pre-checking system to improve BIM design quality effectively and efficiently. It could be expected to meet the owner's requirements and to minimize the cost and time occurred additionally from revising and reproducing data by constructing consistency and accuracy of it.

  • PDF

Development of Pre-Specification for BIM-based Automated Building Code Checking (BIM 기반 건축법규 자동검토를 위한 사전정의서 개발)

  • Kim, Inhan;Jang, Jaemoon;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.1
    • /
    • pp.31-41
    • /
    • 2016
  • Building Information Modeling (BIM) has been adopted in variety domain of construction industry. In this circumstances, interest of BIM model quality has been increased. In many countries, automated building code checking system by Industry Foundation Classes (IFC) has been developed and studied to use web based building permission systems. IFC is international standard of BIM format. However, the data structure of IFC does not include all of objects and properties about national building codes. In this paper, we developed the information specification between IFC data structure and national building code to increase interoperability. First, we drew the criteria from literature review to analyze the building code. And then, we analyzed building code and sorted objects and properties for automated building code checking. After that we made mapping table between the sorted data and IFC specification. Using the mapping table, we developed pre-specification about building codes information that does not exist in IFC specification. And the defined information can be used to develop the BIM modeling guide and national building permission system. The pre-specification support increasing the interoperability between user and automated building code checking system. Increasing thee interoperability makes improvement accuracy and reliability about result of automated building code checking.

Development of Kiln Schedules to Eliminate the Development of Internal Checking in Radiata Pine Boards

  • Kang, Ho-Yang;Booker, R.E.
    • Journal of the Korea Furniture Society
    • /
    • v.19 no.2
    • /
    • pp.116-123
    • /
    • 2008
  • Kiln schedule development was based on two schedule phases, the first being to determine the maximum safe kiln temperature during the check prone initial stage of drying, with the second stage determining how to accelerate drying once the danger of checking had passed. This was achieved by using 38 mm thick boards which were pre-screened for susceptibility to internal checking, and then drying matched sample boards over a range of kiln temperatures. Research has shown that below 50% MC there is no further risk of internal checking. However, difference in drying rate due to board width and the increased occurrence of wet patches in wide boards means that it is essential to modify the basic schedule according to the maximum board width. A condition of 52/40 $^{\circ}C$ was selected for the checking-free initial kiln drying step and a 5-step kiln-schedule dried the boards from 109% to 8% MC for 72.5 hours without internal checking.

  • PDF

Pre-layout Clock Analysis with Static Timing Analysis Algorithm to Optimize Clock Tree Synthesis (Static Timing Analysis (STA) 기법을 이용한 Clock Tree Synthesis (CTS) 최적화에 관한 연구)

  • Park, Joo-Hyun;Ryu, Seong-Min;Jang, Myung-Soo;Choi, Sea-Hawon;Choi, Kyu-Myung;Cho, Jun-Dong;Kong, Jeong-Taek
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.391-393
    • /
    • 2004
  • For performance and stability of a synchronized system, we need an efficient Clock Tree Synthesis(CTS) methodology to design clock distribution networks. In a system-on-a-chip(SOC) design environment, CTS effectively distributes clock signals from clock sources to synchronized points on layout design. In this paper, we suggest the pre-layout analysis of the clock network including gated clock, multiple clock, and test mode CTS optimization. This analysis can help to avoid design failure with potential CTS problems from logic designers and supply layout constraints so as to get an optimal clock distribution network. Our new design flow including pre-layout CTS analysis and structural violation checking also contributes to reduce design time significantly.

  • PDF

Developing an Intelligent Health Pre-diagnosis System for Korean Traditional Medicine Public User

  • Kim, Kwang Baek
    • Journal of information and communication convergence engineering
    • /
    • v.15 no.2
    • /
    • pp.85-90
    • /
    • 2017
  • Expert systems for health diagnosis are only for medical experts who have deep knowledge in the field but we need a self-checking pre-diagnosis system for preventive public health monitoring. Korea Traditional Medicine is popular in use among Korean public but there exist few available health information systems on the internet. A computerized self-checking diagnosis system is proposed to reduce the social cost by monitoring health status with simple symptom checking procedures especially for Korea Traditional Medicine users. Based on the national reports for disease/symptoms of Korea Traditional Medicine, we build a reliable database and devise an intelligent inference engine using fuzzy c-means clustering. The implemented system gives five most probable diseases a user might have with respect to symptoms given by the user. Inference results are verified by Korea Traditional Medicine doctors as sufficiently accurate and easy to use.

A Study on the Exceptional Cases to the Anti-Superiority Effect in Korean and Japanese: A Morpho-Syntactic Approach

  • Khym, Han-Gyoo
    • International Journal of Advanced Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.9-16
    • /
    • 2017
  • In an English multiple Wh-construction with two wh-words, only a higher-located wh-word in a sentence structure is allowed to pre-pose to the Spec of CP, which has been known as a Superiority Effect(SE). Contrary to English, Korean and Japanese have been known not to respect SE, and this phenomenon has been called an Anti-Superiority Effect(ASE). Recent studies including Takita et al(2007) and Harada(2015) among others, however, have suggested exceptional cases to ASE in Japanese, and attempted to explain them through a feature checking mechanism within the Minimalist Program(MP) by Chomsky(1995, 1998). Such explanations of MP, which are based on the abstract feature checking system, have recently been considered just as a kind of technicalia and should be backed up with further empirical evidence. In this paper, I show that there are also exceptions to ASE in Korean, and the exceptional cases to ASE both in Korean and Japanese can be well explainable based on the empirical evidence of Korean/Japanese morpho-syntax.

Lightweighted CTS Preconstruction Techniques for Checking Clock Tree Synthesizable Paths in RTL Design Time (레지스터 전달 수준 설계단계에서 사전 클럭트리합성 가능여부 판단을 위한 경량화된 클럭트리 재구성 방법)

  • Kwon, Nayoung;Park, Daejin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.10
    • /
    • pp.1537-1544
    • /
    • 2022
  • When designing chip, it considers design specification, timing problem, and clock synchronization on place & route (P&R) process. P&R process is complicated because of considering various factors. Chip uses clock tree synthesis (CTS) to reduce clock path delay. The purpose of this study is to examine shallow-CTS algorithm for checking clock tree synthesizable. Using open source Parser-Verilog, register transfer level (RTL) synthesizable Verilog file is parsed and it uses Pre-CTS and Post-CTS process that is included shallow-CTS. Based on longest clock path in the Pre-CTS and Post-CTS stages, the standard deviation before and after buffer insertion is compared and analyzed for the accuracy of CTS. In this paper, It is expected that the cost and time problem could be reduced by providing a pre-clock tree synthesis verification method at the RTL level without confirming the CTS result using the time-consuming licensed EDA tool.

Software for application of Newton-Raphson method in estimation of strains in prestressed concrete girders

  • Gocic, Milan;Sadovic, Enis
    • Computers and Concrete
    • /
    • v.10 no.2
    • /
    • pp.121-133
    • /
    • 2012
  • Structures suffer from damages in their lifetime due to time-dependant effects, such as fatigue, creep and shrinkage, which can be expressed by concrete strains. These processes could be seen in the context of strain estimation of pre-stressed structures in two phases by using numerical methods. Their aim is checking and validating existing code procedures in determination of deformations of pre-tensioned girders by solving a system of nonlinear equations with strains as unknown parameters. This paper presents an approach based on the Newton-Raphson method for obtaining the stresses and strains in middle span section of pre-stressed girders according the equilibrium state.

Effect of presurfacing on drying rate and drying defect of Quercus grosseserrata BI. (전평삭처리(前平削處理)가 물참나무의 건조속도(乾燥速度)와 건조결함(乾燥缺陷)에 미치는 영향(影響))

  • Han, Gyu-Seong;Jung, Hee-Suk
    • Journal of the Korean Wood Science and Technology
    • /
    • v.14 no.4
    • /
    • pp.29-39
    • /
    • 1986
  • To investigate the effect of presurfacing, both 25mm rough and pre surfaced oak boards (Quercus grosseserrata BI.) were dried in the same dry kiln condition. Drying curves, drying strains and drying defects of rough and presurfaced boards were compared. The results obatained are as follows. 1. Average drying rate of rough and presurfaced boards from green to 10% M.C. was 0.276%/hr. and 0.284%/hr., respectively. 2. At the early stage of drying, in case of rough boards, maximum tensile strain of outer slices was $-24.2{\times}10^{-4}$mm/mm and maximum compressive strain of innermost slices was $13.0{\times}10^{-4}$mm/mm, and in case of pre surfaced boards, maximum tensile strain of outer slices was $-14.5{\times}10^{-4}$mm/mm and maximum compressive strain of innermost slices was $28.1{\times}10^{-4}$mm/mm. And in both cases, stress reversal occurred at about 40% M.C.. 3. Maximum surface checking appeared at about 40% M.C.. Of the 10 rough boards. 6 hoards contained surface checks, but presurfaced boards did not contained surface checks after drying. And the results of end checking were similar to those of surface checking. But, honeycomb was not found in both cases. 4. Board shrinkage. warp and casehardening of presurfaced boards were similar to those of rough boards. But, collapse of prsurfaced boards was less than that of rough boards.

  • PDF

Improvement of a radio-frequency/vacuum drying ability and physical properties of Iroko Lumber (Iroko재(材)의 고주파진공건조성 및 물리적 성질 개선)

  • Lee, Nam-Ho;Jin, Young-Moon
    • Journal of the Korea Furniture Society
    • /
    • v.17 no.1
    • /
    • pp.33-46
    • /
    • 2006
  • This study was carried out to investigate a radio-frequency/vacuum (RF/V) drying ability and physical properties of the green boards and the pre-kiln dried boards with 40 mm thickness, and the 70 mm-thick green board of Iroko (Milicia excelsa). The major results were summarized as follows; The drying time from initial moisture content (MC) of 110% to approximate 6% MC for a 40mm-thick green board was 192 hours, and about 200 hours for the 70 mm-thick green board, respectively and so the RF/V drying times were dramatically shortened compared to conventional kiln drying time. The case hardenings at the RF/V drying completion stage test were very negligible, thus represented almost no existence of the residual stress. The checks were very slightly formed on all of the boards during the RF/V drying test, but crook appeared quite severely. During the accelerating test, the water-resistant treated specimens had not experienced any signs of checking occurred, whereas the control boards had encountered very frequent occurrences of end checking and slight surface checking. There were no observations of warping and discoloring regardless of the treatment.

  • PDF