• 제목/요약/키워드: practical management process

검색결과 1,137건 처리시간 0.024초

운전자 정보시스템용 사용자 인터페이스 메타포 개발 (Developing User Interface Metaphors for Driver Information Systems)

  • 박용성;한성호;박원규;조영석
    • 대한인간공학회지
    • /
    • 제28권2호
    • /
    • pp.57-67
    • /
    • 2009
  • This study proposed a practical metaphor development process that consisted of three steps: 1) identifying major functions, 2) developing metaphor candidates, and 3) evaluating appropriateness of the candidates. In the first step, a total of 27 functions might be implemented in a driver information system (DIS) in the near future. Then, three metaphor candidates were selected from existing metaphors, which were reported to be more practical than others by previous studies. Finally, the candidates were evaluated on their appropriateness for driver information systems by using a quick and simple survey. As a result, two metaphors (a PC and a secretary) were identified as the most appropriate ones. The two metaphors can be used to design a variety of interfaces and interactions for driver information systems. In addition, the development process proposed in this study could be applied to developing metaphors for emerging devices with a variety of functions (e.g. PMPs, MP3s, and electronic dictionaries) as well as driver information systems.

비정규분포공정(非正規分布工程)에서 특수관리도(特殊管理圖)의 적용연구(適用硏究) (A Study on the Special Purpose Control Chart for Non-normal Distribution)

  • 신용백;황의철
    • 품질경영학회지
    • /
    • 제14권1호
    • /
    • pp.11-18
    • /
    • 1986
  • Whereas in non-symmetrical distribution manufacturing process they are not plotted relatively on the centeral line but plotted on the skew of right-hand side or left-hand side. That is to say, for the prupose of producing either upper-specification-oriented items or lower-specification-oriented items, and when we carry out tighter control so as to have them pass only its specifications, the distribution shape naturally has a non-normal distribution. In these cases, we could use either compressed control limits or variable transformed logarithm control charts. It the above mentioned methods were not available, we should use special purpose control chart-Mode control chart or Gram-Charlier control chart. These are proper methods for manufacturing process control which uses control chart method. In spite of these methods, domestic manufacturing and mining companies are utterly ignorant about these methods. That invites practical problems in their companies. To enhance this improvements, I proved the property of practical applications of control chart method by comparing and analyzing the case studies of practical application of speical purpose control chart method, and also by introducing the application methods.

  • PDF

Business Process Evaluation and Case Study for Sequential Application of BPM

  • Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.36-44
    • /
    • 2012
  • Adoption and practical application of BPM yet remains at a theoretic and methodological level for many industrial sectors. As for construction industry, adapting BPM into enterprise resource across all business processes could cause problems due to rapid change in corporate operation systems. Furthermore, it is unable to predict potential risks of business process while BPM are being applied. Therefore, applying BPM model to core strategy and individual task seems more effective than applying BPM model to the entire enterprise resource planning. In this paper, we define BPM and suggest a BPM model by analyzing each business unit in order to evaluate each business unit which is included in the business process architecture based on quantitative standards. This paper also presents a sequential application plan for business process model. Finally, a case study is demonstrated for the application of BPM system, focusing on cost management business, which turned out to be a top priority in the aspect of efficiency and ease based on priority analysis.

The Analysis of the Purchasing Process and Distribution Management Requirements of Teaching Materials in Preschool

  • Jae-Moo LEE;Kyung-Seu CHO
    • 유통과학연구
    • /
    • 제22권1호
    • /
    • pp.115-125
    • /
    • 2024
  • Purpose: This study is to analyze the purchasing process and distribution management requirements for teaching materials that have important meaning in the practical field of preschool education. Research design, data and methodology: A structured questionnaire was used to survey 103 childcare staffs regarding the purchasing process and distribution managements. The collected data underwent Likert's 5-point scale analysis and keyword grouping. Additionally, ANOVA was conducted to examine the distribution management demands based on demographic characteristics. Results: The purchasing of teaching materials involved more offline channels than online, and the purchase decisions were predominantly made by principals rather than teachers. Although the purchasing process is similar to that of general businesses, there are difficulties in purchasing due to the disorganized distribution channels and limited accessibility to product information. Additionally, the management of inventory for teaching materials is challenging due to limited personnel and storage. Childcare staffs have requirements for classification systems, evaluation criteria, environments and policies related to teaching materials distribution. The need to introduce a teaching material evaluation and certification system to ensure quality was not high. Conclusions: Most of the respondents recognized that strict management and measures should be taken for the distribution of teaching materials. There were differences in the demand of teaching material distribution depending on the respondents' status, age, education, and experience.

제품개발 과정에서 AMSAA 모델의 실용적 활용방법 (Practical Application of AMSAA Model in the Product Development Process)

  • 정원;김준홍
    • 산업공학
    • /
    • 제19권1호
    • /
    • pp.19-25
    • /
    • 2006
  • In the development process, the objective of a reliability growth program is to track the increase in system reliability, and determine as early as possible whether or not the system reliability is growing at a sufficient rate to meet the required goal and allocate available resources accordingly. Implementation of this kind of program will provide very useful information on concept selection, product/process reliability, and cost effectiveness without too much time, money and engineering effort being spent on the development of failure suspect parts. The purpose of this research is to present a practical method for efficiently monitoring a reliability growth test process using AMSAA(Army Materiel Systems Analysis Activity) reliability growth model. The presented growth management is a viable method for identifying failure modes, incorporating design changes and monitoring reliability progress on an on-going basis during the early stages of a product development program.

계수이산 공정에서 SPC 관리도에 의한 Z 시그마 수준과 PCI 및 PPI의 산출 (Calculation of Z Sigma Level, PCI, and PPI By SPC Charts in the Discrete Process)

  • 최성운
    • 대한안전경영과학회지
    • /
    • 제11권1호
    • /
    • pp.131-136
    • /
    • 2009
  • The research develops the calculation steps of Z sigma level, process capability index(PCI) and process performance index(PPI) applicable to the discrete process in the service industry. The paper presents three following topics used related process indexes according to the precision and accuray in the continuous process. The contents include diverse process indexs for nonconformities by SPC attribute control charts and bias coefficient. The same technique of the nonconformites is also used in the nonconforming units. The practical examples are provided to help easier understanding for users.

디지타이제이션의 디지털 이미지와 메타데이터 표준화작업 (Imaging and Metadata Standards in Digitization : Practical Strategies)

  • 박은경
    • 한국기록관리학회지
    • /
    • 제5권2호
    • /
    • pp.139-152
    • /
    • 2005
  • 디지타이제이션은 문화유산기관의 소장품 보존에 탁월한 공헌을 해 왔으나, 디지타이제이션을 수행하는 상세한 세부기술전략을 표준화하여 지침으로 마련한 기관은 많지 않다. 본고는 디지타이제이션에서 중요한 두 단계인 이미지프로세스와 메타데이타기술(description)에 대한 실무가이드를 사례를 통해 설명한다. 그리고 디지타이제이션 프로젝트 진행에 관련된 중요한 쟁점들을 강조함으로 실무자들이 디지타이제이션을 실행하는데 필요한 전략을 제공한다.

ESPM을 이용한 전력가격의 결정 (The Pricing of Electricity through the ESPM)

  • 이석규;변영덕
    • 한국경영과학회지
    • /
    • 제27권4호
    • /
    • pp.11-27
    • /
    • 2002
  • This paper is aimed at surveying the method that supports logical and theoretical back grounds of electricity service pricing, to investigate whether the ESPM can reflect comprehensively the various interests of parties and persons concerned with electricity supply and demand, and analyzing the practical applicability of the model in short-term perspectives. The major findings of this study can be summarized as fellows. First, the ESPM explains what process the equilibrium price is attained through, which is the essential concept and object in evaluating the value of public enterprises or utilities and the price of electricity Second, the ESPM provides the logics and methods that can objectify the discrete price by each electricity user. Third, the ESPM presents theoretical logics and practical methods that can calculate the basic price and the variable price per electricity unit which are key concepts in the two-part tariff. Fourth, the ESPM has powerful practical applicabilities in the reasonable electricity pricing and in the explanation for the balance between parties and persons interested with electricity supply and demand.

단기 생산공정에 활용되는 SPC 기법의 비교 연구 (Comparison of Statistical Process Control Techniques for Short Production Run)

  • 서순근;이성재;김병태
    • 품질경영학회지
    • /
    • 제28권2호
    • /
    • pp.70-88
    • /
    • 2000
  • Short runs where it is neither possible nor practical to obtain sufficient subgroups to estimate accurately the control limit are common in modem business environments. In this study, the standardized control chart, Hillier's exact method, Q chart, EWMA(Exponentially Weighted Moving Average) chart for Q statistics and EWMA chart for mean and absolute deviation among many SPC(Statistical Process Control) techniques for short runs have been reviewed and advantages and disadvantages of these techniques are discussed. The simulation experiments to compare performances of these variable charts for process mean and variations are conducted for combination of subgroup size, scale and timing of shifts of process mean an/or standard deviation. Based upon simulation results, some guidelines for practitioners to choose short run SPC techniques are recommended.

  • PDF

유비쿼터스 기술을 이용한 프레스 금형의 트라이아웃 관리시스템 (Tryout Management System for Press Dies Production using Ubiquitous Technology)

  • 최상수;양태호;노상도;진희주;이용한;이인석;권성오
    • 한국CDE학회논문집
    • /
    • 제14권5호
    • /
    • pp.314-322
    • /
    • 2009
  • In these days, automotive companies are trying to develop new manufacturing technologies and paradigms for rapid product development and production. The press die development process account for 40% of entire vehicle development process, and tryout process usually takes 3 to 4 months, and it is the biggest time portion out of dies manufacturing. Therefore, the effective tryout management system is essential to reduce time and cost of automotive press die production. This paper suggests improved process and practical application of tryout management using ubiquitous technology, and shows the results such as shorten time, improved quality and supporting of lifecycle engineering of press die.