• Title/Summary/Keyword: power system restoration

Search Result 167, Processing Time 0.032 seconds

An Inquire into Test Bed Compositions in Assessing the Security of a Soft Redundancy Sub-Station System with Auto-Restoration (이중화 자동복구 보안기능이 구비된 배전반의 보안성 평가를 위한 테스트베드 구성에 대한 고찰)

  • Choi, Hyeong-Seok;Jin, Chang-Gi;Bae, Gi-Deok
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.7
    • /
    • pp.99-109
    • /
    • 2012
  • Sub-station, key equipment in electric power infrastructure, are being exposed to increasing risk of hacking. For this, soft redundancy sub-station system needs to be formulated with automatic restoration mechanism. For this it is important to assess the reliability of the applicable range of data that are used in actual system operation, as well as the methods and findings of the tests. At the same time performance of soft redundancy system and total security mechanism, which are aligned for the protection of the sub-station, need to be tested. For testing the above-mentioned, this paper presented a viable formation of a soft redundancy practical VPN system within a panel to protect the latter from hacking or cracking incidences, and conducts a test to check if the considered system actually serves the protection function in the actual operation setting, gathering evidence from the data from the testing of the actual performance of the system as well as of emergency scenario simulation operations. Because tested soft-redundancy & restorative sub-station system is expected to be widely applicable for various cases such as Smart-grid or electricity IT system, where VPN with enhanced level of security is required.

A Study on Development of a New Algorithm to Solve Load Flow for Distribution Systems (배전계통조류계산을 위한 새로운 알고리즘에 관한 연구)

  • Moon, Young-Hyun;Yoo, Sung-Young;Choi, Byoung-Kon;Ha, Bock-Nam;Lee, Joong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.918-922
    • /
    • 1998
  • With the development of industry, the qualitical advancement of power is needed. Since it is placed in the end step of power system, the fault at the distribution system causes some users blackout directly. So if the fault occurs, quick restoration is very important subject and, for the reason, induction of the distribution automation system is now being progressed briskly. For the quick restoration of the faulted distribution system, the load shedding of the blackout-area must be followed, and the other problems like the shedded load, faulted voltage and the rest may cause other accident. Accordingly load shedding must be based on the precise calculation technique during the distribution system load flow(dist flow) calculation. In these days because of its superior convergence characteristic the Newton-Raphson method is most widely used. The number of buses in the distribution system amounts to thousands, and if the fault occurs at the distribution system, the speed for the dist flow calculation is to be improved to apply to the On-Line system. However, Newton-Raphson method takes much time relatively because it must calculate the Jacobian matrix and inverse matrix at every iteration, and in the case of huge load, the equation is hard to converge. In this thesis. matrix equation is used to make algebraical expression and then to solve load flow equation and to modify above defects. Then the complex matrix is divided into real part and imaginary part to keep sparcity. As a result time needed for calculation diminished. Application of mentioned algorithm to 302 bus, 700 bus, 1004 bus system led to almost identical result got by Newton-Raphson method and showed constant convergence characteristic. The effect of time reduction showed 88.2%, 86.4%, 85.1% at each case of 302 bus, 700 bus system 86.4%, and 1004 bus system.

  • PDF

Governor-Response Power Flow Based Long-term Voltage Stability Simulation (조속기 응동 조류계산 기반 장기 전압안정도 모의)

  • Song, Hwa-Chang;Kim, Young-Gon;Lee, Byong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.160-162
    • /
    • 2008
  • This paper present a practical method for long-term voltage stability simulation based on a governor-response power flow. Governor-response power flow (GPF) is to model the long-term system response in the interval from 3 to 30 seconds after disturbance. In this paper, it is assumed that the GPF model ran capture the system state before load restoration starts in contingent conditions. This paper discusses the applicability of GPF to long-term simulation for voltage stability analysis and then explains the GPF formulation and the procedure of the proposed simulation. In addition the paper includes the simulation results with the modified New England 39-bus system.

  • PDF

A Study on the Performance Simulator of Digital Protective Relay (디지탈 보호계전기 성능 시뮬레이터에 관한 연구)

  • Choi, Sang-Bong;Moon, Young-Whan
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.152-155
    • /
    • 1993
  • Protective Relay in power system play a prominent part in minimizing power delivery interruptions and help to get a fast and secure restoration when a failure occurs. In order to meet the higher functional requirements in power system, the performance tests on response characteristic of protective relay is essential to ensure reliability. The purpose of this study is as follows: In order to evaluate performance of protective relay, it is intended to develop performance of digital protective relay simulator which is composed of digital protective relay part, behaviour analysis part, waveform generation part and simulation program to simulate pour system in detail.

  • PDF

Power System Restoration Plan for Korea Power System (우리나라 전계통 정전시 복구계획 소개)

  • Song, Tae-Yong;Rju, Hyun-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.5-6
    • /
    • 2007
  • 우리나라는 전계통 정전 발생 및 광역지역 정전에 대비하여 매년 "전계통 정전시 복구계획"을 수립하여 정전발생에 대비하고 있다. 우리나라는 외부와 고립된 계통으로 외부수전이 불가능하므로 전국 7개 지역에 12개 자체기동발전기를 지정하여 운영하고 있다. 정전 발생시 우리나라 계통복구 절차를 살펴보면 먼저 거래소가 EMS와 전국 발 변전소로부터 올라온 정보를 분석하여 광역정전 여부를 파악하여 정전상황을 각 사업소에 통보하게 된다. 그 후 즉시 자체기동발전기를 기동하고, 시송전 선로를 구성하게 된다. 이 시송전선로를 통해 자체기동발전기에서 생산한 전력을 우선공급발전소에 전달하여 최초 계통복구를 위한 시송전계통을 구성하게 된다. 이후 안정후공급발전기에 기동전력을 공급하면서 계통에 병입되는 전력에 맞춰 계통 부하복구를 시행하게 된다. 지역별 계통이 안정화되었을 경우 지역간 계통을 연계하여 복구과정을 마치게 된다. 이러한 복구계획의 시초가 되는 자체기동발전기가 우리나라와 같은 고립계통에서 매우 중요하므로 자체기동발전기 정기시험을 매년 시행하고 있다. 마지막으로 2006년 제주계통 정전시 복구계획 적용사례와 이때 발생되었던 문제점 및 해결방안을 설명하였다.

  • PDF

Development of Algorithm and Program for the Ground Fault Detection in Ungrounded Distribution Power System (비접지 배전계통 지락고장 검출 알고리즘 및 프로그램 개발)

  • Park, So-Young;Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2619-2627
    • /
    • 2009
  • The ground fault is occupying 70% among the total number of faults in ungrounded distribution power system. When the ground fault occurs in ungrounded system, the fault current is so small that it is hard to detect. But fault handling is very important because to continue power supply during fault conditions may cause the fault spreading and the distribution device in trouble. This paper presents the fault line detection method by using GPT signal detecting zero sequence voltage, and the fault section detection method by detecting whether GPT signal is disappeared or not during shifting normally open switch, which is connecting switch between distribution lines with open state in order to restore the outage area under emergency situation, and during isolating each section one by one which belongs to the fault line. This method is efficient because there is no whole power interruption during the fault section detection, and it is possible to perform both the fault section detection and the service restoration for the outage area at the same time, and it can apply to various distribution system configuration. Program for the fault restoration was developed applying proposed method, and it has been validated by applying to the pilot project of distribution automation system in Vietnam which has the ungrounded distribution system.

A Design of Advanced Distribution Management System Based on IT/OT Convergence (IT/OT Convergence 기반의 Advanced Distribution Management System의 설계)

  • Lim, Il-Hyung;Lee, Seung-Joo;Park, Jong-Ho;Shin, Yong-Hak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.753-759
    • /
    • 2016
  • Power automation system to operate power distribution systems can be distinguished by distribution SCADA with remote monitoring and control; and distribution automation system with basic functions such as service restoration to the distribution SCADA; and distribution management system which is operated by various applications in order to enhance distribution system operation performance based on the distribution automation system. In the technological change, a technical boundary of information technology (IT) and operation technology (OT) is being blurred by that new concepts such as interoperability. In addtion, IT/OT convergence has been proposed by the improvement of ICT and power system technology. At the viewpoint, advanced distribution management system (ADMS) to have the new concepts and to increase distribution system operation efficiency through global information and functions from the other systems has been proposed. In order to implement the ADMS, IT and OT have to be employed together on the ADMS; and the concept-based IT/OT convergence concept has been presented. Therefore, this paper introduces ADMS and IT/OT convergence and proposes a design of IT/OT convergence based ADMS system design with configurations and functions.

A Study on the Uninterruptible Power Supply on the Open Phase of Three-phase Motor (3상 전동기 결상시 무정전 전원공급장치에 대한 연구)

  • Shin, Hyr-Young;Choi, Hong-Kyoo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1317-1320
    • /
    • 2014
  • In case of using three-phase induction motor in three-phase power system, if he deficiency happens in phase among three-phase, the motor will drive in an open phase state. As to the motor, the continuing operation is possible then, but the phenomenon that the power supply stops happening by the result of the overload electricity order on the healthy phase of two phases with a damage and activating the circuit breaker. Consequently, in order to overcome this problem in treatise accordingly. I propose an uninterruptible power supply which is able to prevent that the over current on the health phase through the restoration that in case happening open phase on the power line when driving the motor. Also, it is possible to supply power consecutively without interruption of electric power and we proved the performance and reliability through an experiment.

AN ANALYSIS OF STRUCTURE ON TIME SIGNAL SYSTEM OF HONCHEONSIGYE (혼천시계의 시보시스템 구조 분석)

  • Kim, Sang Hyuk;Lee, Yong Sam
    • Publications of The Korean Astronomical Society
    • /
    • v.28 no.2
    • /
    • pp.17-23
    • /
    • 2013
  • Song I-Yeong (1619 ~ 1692), who was an astronomy professor of Gwansanggam (觀象監, Bureau of Astronomy), created the Honcheonsigye (渾天時計, Armillary Clock) in 1669 (10th year of King Hyeonjong Era). Honcheonsigye was a unique astronomical clock which combined an armillary sphere, the traditional astronomical instrument of the Far East, with the power mechanism of western alarm clock. The clock part of this armillary clock is composed of two major parts which are the going-train, power unit used the weight, and the time signal system in a wooden case. The time signal system is composed of four parts which are the time-annunciator, the striking train, the 12 different time-announcing medallions and the sound bell. This clock has been neglected for many years and its several components have been lost. This study is to understand the structure of time signal system and suggests the restoration process.

An Expert System for Feeder Automation with Efficient Heuristics (효율적인 휴리스틱들을 가지는 선로 자동화 전문가 시스템)

  • Ko, Yun-Seok;Kim, Ho-Yong;Jang, Jung-Tae;Ha, Bog-Nam
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.482-484
    • /
    • 1995
  • This paper proposes an expert system with improved heuristics in order to enhence convergence rate to the optimal solution when an emergence problem occurrs in the automated large scale distribution system. These heurictics, which a re obtained from the line loss and load balancing change after a line section transferred, are newly adopted for the emergence problem.

  • PDF