It is important to evaluate the voltage characteristics of diesel generator as an emergency power supply in nuclear power plant. On loss of offsite power sources, emergency safeguard loads required to safely shutdown the reactor should be supplied by diesel generator. This paper presents the dynamic stability program to evaluate diesel generator performance as an emergency power system. The results Indicate the diesel generator ability to start the motors successfully seems to life in its impedances and inertias.
Park, Sung-Jae;Yoo, In-Je;Choi, Su-Jin;Lee, Dong-Ki
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.3
/
pp.640-646
/
2017
A GEN TEST of the auxiliary power unit of a T-50 series aircraft is performed as part of the operational test of its emergency power system on the ground before flight. At this time, the auxiliary power unit should be automatically turned off via the response signal of the ECU when power is not normally supplied to the emergency power system. If the correct operation of the emergency power system cannot be confirmed on the ground, it is not possible to proceed with the flight. This kind of defect is a major factor causing the operation rate of the aircraft to be decreased. The defect code identified by the ECU was confirmed as a defect in the inverter. However, the same defect was found after replacing the inverter. This report presents an improved method of identifying the cause of the defect by analyzing the response characteristics of the ECU and emergency power system and allows the ECU to be recognized as the cause of the defect if the inverter does not generate a voltage within a certain time. Also, the application of the improved method confirmed that it can satisfy the output request time of the emergency power system and effectively prevent the auto-shutdown of the auxiliary power unit.
Kwak, Myung Woong;Jung, Woo Sik;Lee, Jeong-ho;Baek, Min
Journal of the Korean Society of Safety
/
v.35
no.1
/
pp.107-115
/
2020
This paper introduces the first vital area identification (VAI) process for the physical protection of nuclear power plants (NPPs) during low power and shutdown (LPSD) operation. This LPSD VAI is based on the 3rd generation VAI method which very efficiently utilizes probabilistic safety assessment (PSA) event trees (ETs). This LPSD VAI process was implemented to the virtual NPP during LPSD operation in this study. Korea Atomic Energy Research Institute (KAERI) had developed the 2nd generation full power VAI method that utilizes whole internal and external (fire and flooding) PSA results of NPPs during full power operation. In order to minimize the huge burden of the 2nd generation full power VAI method, the 3rd generation full power VAI method was developed, which utilizes ETs and minimal PSA fault trees instead of using the whole PSA fault tree. In the 3rd generation full power VAI method, (1) PSA ETs are analyzed, (2) minimal mitigation systems for avoiding core damage are selected from ETs by calculating system-level target sets and prevention sets, (3) relatively small sabotage fault tree that has the systems in the shortest system-level prevention set is composed, (4) room-level target sets and prevention sets are calculated from this small sabotage fault tree, and (5) the rooms in the shortest prevention set are defined as vital areas that should be protected. Currently, the 3rd generation full power VAI method is being employed for the VAI of Korean NPPs. This study is the first development and application of the 3rd generation VAI method to the LPSD VAI of NPP. For the LPSD VAI, (1) many LPSD ETs are classified into a few representative LPSD ETs based on the functional similarity of accident scenarios, (2) a few representative LPSD ETs are simplified with some VAI rules, and then (3) the 3rd generation VAI is performed as mentioned in the previous paragraph. It is well known that the shortest room-level prevention sets that are calculated by the 2nd and 3rd generation VAI methods are identical.
Kim, Sun-Hye;Sung, Hee-Dong;Choi, Jae-Boong;Huh, Nam-Su;Park, Jeong-Soon;Choi, Young-Hwan
Transactions of the Korean Society of Pressure Vessels and Piping
/
v.7
no.4
/
pp.44-50
/
2011
Turbulent mixing of hot and cold coolants is one of the possible causes of high cycle thermal fatigue in piping systems of nuclear power plants. A typical situation for such mixing appears in turbulent flow through a T-junction. Since the high cycle thermal fatigue caused by thermal striping was not considered in the piping fatigue design in several nuclear power plants, it is very important to evaluate the effect of thermal striping on the integrity of mixing tees. In the present work, before conducting detailed evaluation, three thermal striping evaluation methodology suggested by EPRI, JSME and NESC are analyzed. Then, a by-pass pipe connected to the shutdown cooling system heat exchanger is investigated by using these evaluation methodology. Consequently, the resulting thermal stresses and the fatigue life of the mixing tee are reviewed and compared to each other. Futhermore, the limitation of each methodology are also presented in this paper.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.12
no.4
/
pp.37-46
/
1998
This paper analyzes the present state of customers' effect in distribution system by momentary voltage variation. Customers are becoming increasingly concerned about the quality of electric power. Most of all, the voltage magnitude quality is very important because it can have a direct effect on customers. Especially, according to the development of automatic process, momentary voltage variations result in the shutdown of sensitive loads such as electronic equipment, computer and magnetic contactor, and so on. To analyze the shutdown rate of customers' equipments by the momentary voltage variation, we present the CVEMA curve and he cumulative CVEA curve of each load type through the experiment for the customers' sensitive equipments. Also, we have surveyed customers' opinion by the questionnaire as "Survey of Power Quality" an then the results are reported.
Babilas, Egidijus;Dokucajev, Pavel;Janulevicius, Darius;Markelov, Aleksej;Pabarcius, Raimondas;Rimkevicius, Sigitas;Uspuras, Eugenijus;Vaisnoras, Mindaugas
Nuclear Engineering and Technology
/
v.50
no.3
/
pp.504-511
/
2018
In Lithuania, all spent nuclear fuel (SNF) resulted from the operation of the Ignalina Nuclear Power Plant (INPP), which had two Russian Acronym for "Channelized Large Power Reactor"-type reactors. After the final shutdown, the total amount of SNF at the INPP was approximately 22,000 fuel assemblies. All these assemblies will be stored for about 50 years and disposed of after that. The decision to shut down and decommission both reactors in Lithuania before termination of design period raises a significant challenge for the treatment of accumulated SNF. Therefore, various techniques and technologies for SNF management were developed and justified for that specific case, and a set of special equipment was installed at the INPP, the effectiveness of which was demonstrated during its operation. This article presents unique techniques related to the management of SNF adopted and commissioned at the INPP after its operation shutdown, namely fuel rod cladding leak tightness control system and special equipment for collection of possible spillage during handling of SNF assembly in the hot cell. The operational experience and measurement results of fuel rod cladding leak tightness control system are presented.
One fundamental element of probabilistic safety assessment (PSA) is the initiating event (IE) analysis. Since IE frequencies can change over time, time-trend analysis is required to obtain optimized IE frequencies. Accordingly, such time-trend analyses have been employed to estimate industry-average IE frequencies for use in the PSAs of U.S. nuclear power plants (NPPs); existing PSAs of Korean NPPs, however, neglect such analysis in the estimation of IE frequencies. This article therefore provides the method for and results of estimating Korean industry-average IE frequencies using time-trend analysis. It also examines the effects of the IE frequencies obtained from this study on risk insights by applying them to recently updated internal events Level 1 PSA models (at-power and shutdown) for an OPR-1000 plant. As a result, at-power core damage frequency decreased while shutdown core damage frequency increased, with the related contributions from each IE category changing accordingly. These results imply that the incorporation of time-trend analysis leads to different IE frequencies and resulting risk insights. The IE frequency distributions presented in this study can be used in future PSA updates for Korean NPPs, and should be further updated themselves by adding more recent data.
A speed signal of governor, which control the output and speed of a generator, is important because a signal failure can be causing the shutdown of a power plant. thus, it is necessary to introduce switching method with two complementary signal. This paper presents a comparative study of speed signal switching methods. One of the Proposed methods has been tested at a power plant in Pukcheju and the approach described here is expected to be of wide applicability.
In the case of driving water electrolysis by receiving surplus electricity from solar and wind power generation, operation and stopping must be repeated according to weather fluctuations. When the PEMWE(Polymer Electrolyte Membrane Water Electrolysis) is driven and stopped, the PEM fuel cell is in the same state as the PEM fuel cell due to the residual hydrogen and oxygen, and the high potential of the water electrolysis formed during operation is highly likely to cause degradation of the electrode and membrane even during stopping. In this study, in order to check how much degradation of the electrode and membrane progresses during the repeated driving/shutdown process of PEM water electrolysis, the performance decrease was measured by changing the number of driving/shutdown for 144 hours. Changes in electrode catalyst active area, hydrogen permeability and fluorine emision rate of membranes were analyzed to measure changes in the properties of electrodes and polymer membranes. Overall, the PEMWE performance decreased as the number of stops increased. When stopped 5 times in 144 hours, the IrOx catalyst activity decreased by more than 30%, and the hydrogen permeability increased by 80%, confirming that both the electrode and the membrane were deteriorated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.