Journal of the Korea Institute of Information and Communication Engineering
/
v.15
no.2
/
pp.447-454
/
2011
Power-line interference(PLI) can distort certain regions in analysing the ECG signal. In particular, the regions such as P and R wave that are important element in diagnosing with arrhythmia is expressed as different type of noise according to the case whether power-line frequency is multiples of sampling frequency and or not. Noise characteristics is also divided into linearity and non-linearity. In this paper, adaptive subtraction method for removing variable PLI of ECG signal is proposed. We classify the multiple relationship between power line and sampling frequency as Multiple and Non-multiple. PLI of Linear segment is extracted through moving average filter, PLI of non-linear segment is extracted through the interference component that is extracted in the linear segment and stored in the temporary buffer. The performance of P wave and R wave detection is evaluated by using 119 data record of MIT-BIH arrhythmia database. The achieved scores indicate P wave detection rate of 97.91%, R wave detection rate of 96.66% and P wave detection rate of 99.01%, R wave detection rate of 97.93% accuracy respectively for Notch filter and proposed subtraction method.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2017.05a
/
pp.559-562
/
2017
In city, tracing of power transmission lines is difficult due to compound installation of overhead and underground lines, transposition, bad view caused by trees or big buildings. It is hard problem for electrical technician on site to trace power transformers or power lines to serve customers in 3 phase -4 wires power distribution systems. It is necessary that the correct and fast tracing method is required for load balancing among distribution lines. Old technology use to trace off-lines with high power impulse injection. Our proposed method use to trace live lines with very small power high frequency signal injection. Typical power transformers in the distribution system prevent propagating the higher frequency carrier signal. The proposed method uses the limited propagation ability to identify the power transformer to serve customers. Two end communication terminals are required to be synchronized between them for determination on electrically same phases. Challenging issue is to achieve synchronization without GPS providing synchronizing time. A novel power transformer and wire identification system is designed and implemented. The system consists of a transmitter and a receiver with power-line communication module. Some experiments are conducted to verify the theoretical concepts in a big commercial building. Also some simulations are done to help and understand the concepts by using MATLAB Simulink simulator.
The Transactions of the Korean Institute of Power Electronics
/
v.9
no.3
/
pp.267-274
/
2004
In this paper, a new on-line dead-time compensation method is proposed. The output voltage errors due to the dead-time effect is considered as disturbance voltages. The magnitude of the disturbance voltages is estimated using a time delay control technique and the disturbance voltages are calculated using the estimated values, measured currents, and position information. The calculated disturbance voltages are fed to voltage references in order to compensate the dead-time effect. The proposed method is applied to a PM synchronous motor drive system and implemented in a digital manner using a digital signal processor (DSP) TMS320C31. The experiments are carried out for this system to show the effectiveness of the proposed method and the results show the validity of the proposed method.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.11
no.2
/
pp.234-241
/
2000
During the EFT immunity test, the fast transient voltage is injected to the power or signal line. The radiated noise from these lines influences the near-by EUT, and consequently, the reliability of the test result can be jeopardized. The measured data of the field strength and wave shape of the noise were compared with the result of the mathematical analysis using transmission line model. When the tests were performed by the conditions the same as stated in IEC 61000-4-4, the results showed that the magnitude of the radiated electric field strength was about 2.4KV/m, and it can cause severe interference to the intended operation of EUT.
Park, Soo Hoon;Kim, Dong Il;Park, Youn Joon;Nah, Seung Wook
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.27
no.3
/
pp.291-298
/
2016
In this paper, we studied about the radiated emission of EFT(Electrical Fast Transient)/Burst signal, referenced IEC-61000-4-4 of the international EMC standard and its effect on EUT(Equipment Under the Test) when EFT/Burst signal (Conducted noise) induced on a power cable to EUT. Firstly, we set up test sample by the standard and +4 kV standard signal is induced by EFT/Burst signal generator with 1 m length power cable for 1 minute. Consequently, we found not only induced EFT/Burst signal along power line, but also directly radiated emission signal from EFT/Burst signal generator (Radiated emission noise of EFT/Burst). The radiated emission signal of EFT/Burst was 30 dB which is higher than limit of CISPR 22 which is international EMC standard. Moreover, we measured the electric field strength by changing distance from maximum radiated emission point to electric field strength tester. As a result, this electric field strength was 23 V/m which is higher than international EMC standard test level(CISPR 24). Therefore, it was confirmed that the probability of malfunction may be high when radiated emission of EFT/Burst noise exists near the EUT.
Kim, Jong-Bum;Lee, Jun-Koo;Park, Seok-Ha;Kim, Yang-Mo
Proceedings of the KIEE Conference
/
1998.07a
/
pp.362-364
/
1998
The transmission of information by inductive loop is required for train-safety and fast running. FSK modulation has been used for transmission of information in fast running. Transmission channel between train and ground must be protected from interference of power line. To protect transmission data from noises, the analysis on the transmission line must be performed in advance. In this paper, transmission line is analyzed in view of reflection and time delay in both noise and signal.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2005.07a
/
pp.215-216
/
2005
To decrease and remove of much noises that is detected in PD (partial discharge) measuring test. we forced on detection of those. We made W-LC filter for measuring PD. which adapted that to field test. We tested after design laboratory circumstances like field line. and then the phase change properties of detected signal in UHF sensor were measured by Lemke Probe and oscilloscope (TDS-3054. Tektronix). Eventually we checked decrement of noises from experimental result. Also from experimental result at the joint box of 22.9[kV] distribution line. we obtained reasonable data which enable noises to decrease. Hereafter those results will be adapted at ultra-high voltage for trouble prevention and on-line cable watch. diagnosis of those.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.14
no.11
/
pp.1184-1190
/
2003
In this paper, we investigated the characteristics of compensation for distorted NRZ signal and RZ signal in 320 Gbps WDM system as a function of channel input power, fiber dispersion coefficient and transmission length, respectively. The considered WDM transmission system is based on mid-span spectral inversion(MSSI) compensation method having highly nonlinear dispersion shifted fiber(HNL-DSF) optical phase conjugator(OPC) in the mid-way of total transmission line. We confirmed that the signal input power range compensated by MSSI is broadened by using RZ as a signal format in WDM system with small fiber dispersion coefficient, The range of fiber dispersion coefficient compensating overall distorted WDM channels is limited, because degree of compensation for distorted channel with low conjugated-wave power becomes gradually degrade as fiber dispersion coefficient becomes gradually higher. It is showed that RZ format and NRZ format is suited for long-haul transmission in WDM system with small fiber dispersion coefficient and with large fiber dispersion coefficient, respectively.
Since the start of the KSTAR (Korea Superconducting Tokamak Advanced Research) project, Instrumentation and Control (I&C) of the Neutral Beam Test Facility (NB-TF) has been striving to answer diverse requests arising from various facets during the project's development and construction phases. Hard-wired electrical circuits have been designed, tested, fabricated, and finally installed to the relevant parts of the system. In relation to the vacuum system I&C, controlling functions for the rotary pumps, a Roots pump, two turbomolecular pumps, and four cryosorption pumps have been constructed. I&C for the ion source operation are the temperature and flow rate signal monitoring, Langmuir probe signal measurements, gradient grid current measurements, and arc detector circuit. For the huge power system to be monitored or safely operated, many temperature measurement functions have also been implemented for the beam line components like the neutralizer, bending magnet, ion dump, and calorimeter. Nearly all of the control and probe signals between the NB test stand and the control room were made to be transmitted through the optical cables. Failures of coolant flow or beam line vacuum pressure were made to be safely blocked from influencing the system by an appropriate interlock circuit that will shut down the extraction voltage application to the system or prevent damages to the vacuum components. Preliminary estimation of the beam power through the calorimetric measurement shows that 87.9% of the total power of the 60kV/18A beam with 200 seconds duration is absorbed by the calorimeter surface. Most of these I&C results would be highly appropriate for the construction of the main NBI facility for the KSTAR national fusion research project.
Kim, Hong-Rak;Park, Jin-Ho;Kim, Kyoung-Il;Jeon, Hyo-won;Shin, Jung-Sub
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.22
no.2
/
pp.27-33
/
2022
The small infrared image homing sensor is the eye of a guided weapon that has an infrared image sensor that identifies a target on the ground through day and night infrared image processing and searches, detects, and tracks the target. Inside the guided weapon since the power supply and communication line are used together with various components, the part against electromagnetic wave interference is very important. In particular, the effect of CE (Conducted Emission) through the power and communication lines connected by cables is very important. Through this method, it is possible to directly affect other components of the guided weapon. In this paper, the EMI filter and cable design for avoiding electromagnetic interference to the power input through the cable and the communication line are described. Also, the designed EMI filter is manufactured After the CE102 test of MIL-STD-461G, design satisfaction will be explained.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.