• Title/Summary/Keyword: power line

Search Result 6,064, Processing Time 0.037 seconds

Analysis of Power Line Characteristics as High Speed Communication Channel (고속 채널로써 전력선 특성 분석)

  • Park, Chong-Yeun;Jo, Ho-Chan;Lee, Hyeuk-Sun
    • Journal of Industrial Technology
    • /
    • v.21 no.A
    • /
    • pp.207-211
    • /
    • 2001
  • For the power line communication, we studied its characteristic impedance, noise characteristics, loss characteristics and the coupling circuit between the communication MODEM and power lines. As the results of the experiments, we concluded that the power line impedance in a house varied in the wide range because the electric systems generate the current and voltage hamornic noises.

  • PDF

ON-LINE CALCULATION OF 3-D POWER DISTRIBUTION

  • Park, Y. H.;W. K. In;Park, J. R.;Lee, C. C.;G. S. Auh
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05a
    • /
    • pp.459-464
    • /
    • 1996
  • The 3-D power distribution synthesis scheme was implemented in Totally Integrated Core Operation Monitoring System (TICOMS), which is under development as the next generation core monitoring system. The on-line 3-D core power distribution obtained from the measured fixed incore detector readings is used to construct the hot pin power as well as the core average axial power distribution. The core average axial power distribution and the hot pin power of TICOMS were compared with those of the current digital on-line core monitoring system, COLSS, which construct the core average axial power distribution and the pseudo hot pin power. The comparison shows that TICOMS results in the slightly more accurate core average axial power distribution and the less conservative hot pin power. Therefore, these results increased the core operating margins. In addition, the on-line 3-D power distribution is expected to be very useful for the core operation in the future.

  • PDF

The circuit design to be power transmission or power distribution using the dual characteristic impedance transmission line (이중 특성 임피던스 전송 선로를 이용한 전력 전송 또는 전력 분배가 가능한 회로 설계)

  • Park, Unghee
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.10
    • /
    • pp.2339-2344
    • /
    • 2014
  • of a microstrip transmission line, this transmission line can operate as the microstrip line or the coplanar line according to open or short connection between the ungrounded copper plane and grounded plane on the base plane. Two different type operation of the transmission line means that one transmission line can have two different characteristic impedances. This paper proposes and fabricates the circuit to be operated 2-ports power transmission line or 2-way power divider with the stable input matching characteristic by using this dual-impedance transmission line. The proposed circuit operates 2-ports power transmission line in case of the coplanar line or 2-way power divider line in case of the microstrip line. The fabricated circuit shows $S_{21}$ > -0.2 dB and $S_{11}$ < -15 dB above 700 MHz when the circuit operates 2-ports power transmission line. And, it is $S_{21}$ > -3.8 dB, $S_{11}$ < -10 dB and $S_{21}/S_{31}$ < ${\pm}0.3dB$ above 700 MHz when the circuit operates 2-way power divider.

Voltage Control Strategy of new 3-phase Line-Interactive UPS System using AC Line Reactor and Parallel-Serise Active Filter (AC 라인 리액터와 병렬 및 직렬 능동필터를 가지는 새로운 3상 Line-Interactive UPS 시스템의 전압제어 방식)

  • Ji, Jun-Keun
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.201-203
    • /
    • 2005
  • A new 3-phase line-interactive UPS(Uninterruptible Power Supply) system with parallel-series active power-line conditioning capability using AC line reactor and two four-leg PWM VSCs(Voltage Source Converters) was introduced recently, In this paper, the strategy of voltage control in suggested UPS system is explained. The objective of proposed voltage controllers in parallel(shunt) and series PWM VSC is to guarantee satisfactory characteristics in steady state and transient state.

  • PDF

Calculating Mutual Impedance between Power-Line and Communication-Line with Earth Return Current (대지귀로 전류에 의한 전력선과 통신선의 상호임피던스 해석)

  • Lim, Yong-Hun;Hyun, Duck-Hwa
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.269-271
    • /
    • 2003
  • A method for calculation of mutual inductance from the parallel power-line and earth conduct to communication-line is studied in the paper. The solution for the electromagnetic field produced by an overhead power-line is derived using Maxwell's equations and treating the as a boundary value problem. Total mutual inductance from direct current and image current to communication-line is used Carson's formula for infinitely long parallel conductors.

  • PDF

Design of Power Line Communication Protocol using Polling Concept (Polling을 이용한 전력선 통신(PLC) 프로토콜의 설계)

  • Lim, Eun-Jeong;Kang, Cheoul-Shin
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.31-34
    • /
    • 2005
  • In this paper, we proposed a MAC protocol which can be used in power line communications(PLC). In the power line communication network, the data signal cannot travel long distance because of a serious attenuation. Consequently, we need to have a number of repeaters (amplifiers) in order to recover the signal power, which causes flooding problem in the network The proposed MAC protocol uses polling concept and solves the flooding problem in the power line communication network. The proposed protocol can be applied to power line communication networks for automatic power distribution control system. A mathematical analysis has been carried out to estimate the performance of the proposed protocol.

  • PDF

Propagation Tendency of Lightning Surge in the Power and Communication System (전원 및 신호시스템에서의 뇌서지 전파양상)

  • Lee, Tae-Hyung;Cho, Sung-Chul;Eom, Ju-Hong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.245-249
    • /
    • 2007
  • The tendency of lightning surge to propagate displays the difference for applicable power and equipment. However, looking into the subject equipment with the lightning surge, the lightning surge can be divided in between the two lines of power, between the power line and the ground, the power line and the PE conductor, between the neutral line and the ground and the like. In addition, in the event of the communication equipment, there exists the case of lightning surge entered from the power line in addition to the entry between the communication lines, the communication line and the ground. In this study, the tendency of propagation of lightning surge penetrated on to the subject equipment is analyzed through the empirical experiment in accordance with the ground method by using the independent ground, common ground, bypass arrester and others among the techniques for safety improvement in power lines.

  • PDF

Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines (가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토)

  • Joon-Young, Park;Yoon-Geon, Lee;Young-Sik, Jang
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.

Development of Arc-horn to be mounted on 154kV Transmission Line Arrester (154kV 송전선로 피뢰기 설치용 아킹혼 개발)

  • Min, Byeong-Wook;Kim, Woo-Kyum;Lee, Buk-Chang;Choi, Han-Yeol;Park, Jae-Ung;Keum, Eui-Yeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.335-336
    • /
    • 2008
  • Overhead transmission lines are mainly crossing mountainous area. They are easily affected in weathers like typhoon, strong wind, lightning, heavy rain, or heavy snow. Sometimes these weathers cause transmission line faults. A lightning flashover is most often fault. Nowadays lightning density in KOREA is growing high and lightning flashovers occur more often. A lightning flashover on transmission line is mostly cleared by momentary operation of a circuit breaker, so power failure happens rarely. However, when both circuits trip simultaneously due to the lightning flashovers on double circuit transmission line, short time power failure and voltage drop happen. KEPCO has used transmission line arresters to avoid double circuit simultaneous trip out since 2003. And transmission line arresters cannot be installed with KEPCO's present metal fittings, so various fittings have been used for each transmission line arrester manufacturer. This paper introduces development and standardization of arc-horn and metal fittings for transmission line arrester which can be used for both existing lines and new lines in KEPCO.

  • PDF