In recent years, it has been a worldwide trend that many power utilities gave their attention to develop and operate their power plants, substation and distribution systems. Following this trend, KEPCO(Korea Electric Power Corporation) has developed many electric automation systems with various communication networks. It has been natural that the automation systems are just focused on to remote devices when they come to be designed. But, we have to shift the focus to the automation system itself. We have developed the Multi-service Optical Transmission System (M-OTS) for electrical power systems. It can be adopt to not only distribution power field but also the transmission power field. The result strongly shows that the system is potentially beneficial in reliability, speed, and expandability. This paper presents some of initial design efforts and results toward a KEPCO's communication system in distribution areas.
With the increase of electrical consumption and the unbalance of power demand and supply, power reserve rate is getting smaller and also the reliability of the power supply is getting deteriorated. Under this circumstance, the electrical energy storage (EES) System is considered as one of essential countermeasure for demand side management. This paper proposes efficient evaluation algorithms of multiple functions for EES systems, especially the secondary battery energy storage systems, in the case where they are interconnected with the power distribution systems. It is important to perform the economic evaluation for the new energy storage systems in a quantitative manner, because they are very costly right now. In this paper, the multiple functions of EES systems such as load levelling, effective utilization of power distribution systems and uninterruptible power supply are classified, and then the quantitative evaluation methods for their functions are proposed. From the case studies, it is verified that EES systems installed at distribution systems in a dispersed manner have multiple functions involved with direct and indirect benefits and also they can be expected to introduce to distribution systems with respects to economical point of view.
Communications for Statistical Applications and Methods
/
v.19
no.6
/
pp.837-847
/
2012
Inverse Gaussian distribution is widely used in applications to analyze and model right-skewed data. To assess the appropriateness of the distribution prior to data analysis, Mudholkar and Tian (2002) proposed an entropy-based test of fit. The test is based on the entropy power fraction(EPF) index suggested by Gokhale (1983). The simulation results report that the power of the entropy-based test is superior compared to other goodness-of-fit tests; however, this observation is based on the small-scale simulation results on the standard exponential, Weibull W(1; 2) and lognormal LN(0:5; 1) distributions. A large-scale simulation should be performed against various alternative distributions to evaluate the power of the entropy-based test; however, the use of a theoretical method is more effective to investigate the powers. In this paper, utilizing the information discrimination(ID) index defined by Ehsan et al. (1995) as a mathematical tool, we scrutinize the power of the entropy-based test. The selected alternative distributions are the gamma, Weibull and lognormal distributions, which are widely used in data analysis as an alternative to inverse Gaussian distribution. The study results are provided and an illustrative example is analyzed.
Chong-Eun, Cho;Sang-Bong, Kim;On-You, Lee;Kang-Sik, Kim
KEPCO Journal on Electric Power and Energy
/
v.8
no.2
/
pp.79-86
/
2022
Recently, the amount of maintenance is increasing due to the aging of power facilities, but the budget is constrained. Therefore, the importance of asset management that selects replacement priorities based on the failure probability and enhances investment effects is increasing. Because the number of distribution transformers is very large, the proportion of investment cost is very high. Therefore, it is important to select the investment priority by evaluating the reliable remaining life based on the failure probability. This paper evaluates the statistical expected life using the failure data of distribution transformers for the last 11 years and the current operation data. The hazard rate of distribution transformer and MV cable was compared with each other and the adequacy of early failure removal was reviewed and the statistical expected life corresponding to the cumulative failure probability B3% was calculated.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.5
/
pp.238-246
/
2002
Utilities are trying to install the equipment of high quality to avoid deterioration of supply reliability. In addition, many sectionalizing switches which can decrease the total outage value for a fault are installed for the same reason. Therefore, utilities are interested in stun dards and criteria for installing switches to optimize the total cost on distribution systems. The affect of sectionalizing switches installed on distribution feeder is gradually decreased because the failure rate on distribution feeder is decreased. Also the automation for distribution systems is widely applied for the efficient operation. Therefore, the renewal for installation standards of sectionalizing switches Is required to reflect the current operation situation. The variable data is used to consider the KEPCO's real situation of distribution feeder as follows; the feeder capacity, connecting rate, feeder length, failure rate of distribution feeder, the failure rate of switches, perception time of feeder fault, the restoration time for a faulted section, the transfer time to other feeders, and the switching time. In this study, We propose equations which can determine the number of sectionalizing switches for minimizing the outage and switch installation cost.
The Transactions of the Korean Institute of Power Electronics
/
v.22
no.4
/
pp.353-359
/
2017
To take advantage of electric propulsion, several large vessel kinds, namely, cruise vessels, icebreakers, drill ships, and warships, have been generally designed with Integrated Power System (IPS). Although most of these vessels have adopted AC distribution IPS, DC distribution IPS ships have recently emerged as a new promising technology thanks to the availability of the products related to the DC distribution system, in which the system's major advantages over AC distribution are reduced weight and fuel consumption. This paper presents the comparison results of a 10-t class fishing boat for the AC distribution and DC distribution cases. By replacing AC distribution system with DC distribution, 31-41% reduction in the weight of the electrical equipment weight and 20-25% reduction in the fuel consumption are expected.
In this work, we have performed the application experiment for real distribution line to diagnose the underground power cables using DC voltage decay measurement system. We have also performed the Isothermal Relaxation Current test for the same distribution line using KDA-l. We could confirmed possibility of grading the insulation aging state of underground power cables. Therefore, we conclude that it is possible to apply DC voltage decay method to the real distribution line.
This paper presents a new algorithm of the operation on power distribution system by automated distribution system (ADS). A performance of this automated algorithm is established to operate the distribution system faster than earlier. We reduced the time and area of power failure by using automation algorithm on ADS.
With Korean Government's Renewable energy 3020 plan and 8th Basic plan for long-term power supply, renewable energy industries in Korea are active and catching attention from many relevant industry's relations. Especially with Interconnection guarantee policy established in Oct, 2016, DERs interconnection delay due to lack of allowable distribution hosting capacity is happening and reduction of reinforcement cost for distribution system where 70 % of DERs in South Korea are installed became one of important issues of KEPCO. Therefore, KEPCO needed to extract reasonable solutions to increase feasible hosting capacity of distribution feeders in order to reduce reinforcement cost under the condition of no matter in distribution system operation. This paper proposes feasible hosting capacity of distribution feeders that can be adopted and the status of DER installation in distribution system, PV output data, minimum load in distribution feeders as well as capacity of distribution lines have been investigated and analyzed in proof of the proposal.
Wind energy can be conversed into electrical power using wind generator. Wind farm is made up of many wind generators, and it is often interconnected into distribution system to supply power for utilities. There are many protection problems on distribution system connected with Wind farm. It can effect on power quality severely when faults are occurred on distribution line or Wind farms. Therefore the correct protective scheme must be set for distribution system which has a Wind farm. In this paper, A wind farm connected into distribution line is simulated with several fault types which can be occurred on distribution line and Wind farm using PSCAD/EMTDC. And this paper proposes necessary relays to protect both sides of distribution system and wind farm.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.