Browse > Article
http://dx.doi.org/10.18770/KEPCO.2022.08.02.79

Distribution Transformer Statistical Expected Life Evaluation and Removal Adequacy Review  

Chong-Eun, Cho (KEPCO Research Institute, Korea Electric Power Corporation)
Sang-Bong, Kim (KEPCO Research Institute, Korea Electric Power Corporation)
On-You, Lee (KEPCO Research Institute, Korea Electric Power Corporation)
Kang-Sik, Kim (KEPCO Research Institute, Korea Electric Power Corporation)
Publication Information
KEPCO Journal on Electric Power and Energy / v.8, no.2, 2022 , pp. 79-86 More about this Journal
Abstract
Recently, the amount of maintenance is increasing due to the aging of power facilities, but the budget is constrained. Therefore, the importance of asset management that selects replacement priorities based on the failure probability and enhances investment effects is increasing. Because the number of distribution transformers is very large, the proportion of investment cost is very high. Therefore, it is important to select the investment priority by evaluating the reliable remaining life based on the failure probability. This paper evaluates the statistical expected life using the failure data of distribution transformers for the last 11 years and the current operation data. The hazard rate of distribution transformer and MV cable was compared with each other and the adequacy of early failure removal was reviewed and the statistical expected life corresponding to the cumulative failure probability B3% was calculated.
Keywords
Asset Management; AMS; Distribution Transformer; Expected Life; Life Expectancy; Cut-off Year; Hazard Rate; Weibull; Risk Matrix; PoF; CoF; AIP; Scale Parameter;
Citations & Related Records
연도 인용수 순위
  • Reference
1 "전력설비 AMS 구축 추진계획", 기술기획처 공문 P2, 2019.8월 
2 한전 영업배전정보시스템 > 계통관리 > 정휴전관리 > 저압정전실적(2011.8~2021년)  
3 Working Group C1.25, "Transmission Asset Risk Management", CIGRE TB-597, 2014 
4 Working Group A2.35, "Experiences in Service with New Insulating Liquids", CIGRE TB-436, 2010 
5 OMRON, "Technical Explanation for Solid-state Relays" report P26 
6 이온유, "통계기법을 적용한 배전용 변압기 자산관리 수명평가기술", P34~35, 2021.8 
7 Working Group C1.16, "Transmission Asset Risk Management", CIGRE TB-422, 2010 
8 B.Desai, "Industry-wide Transformer Database", EPRI, P410, 2015.12