• Title/Summary/Keyword: post-combustion $CO_2$ capture

Search Result 33, Processing Time 0.027 seconds

Analysis of the Influence of Post-Combustion $CO_2$ Capture on the Performance of Fossil Power Plants (후처리를 이용한 $CO_2$ 포집이 화력 발전설비 성능에 미치는 영향 해석)

  • Tak, Sang-Hyun;Kim, Tong-Seop;Chang, Young-Soo;Lee, Dae-Young;Kim, Min-Sung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.8
    • /
    • pp.545-552
    • /
    • 2010
  • Research and development efforts to reduce $CO_2$ emission are in progress to cope with global warming. $CO_2$ emission from fossil fuel fired power plants is a major greenhouse gas source and the post-combustion $CO_2$ capture is considered as a short or medium term option to reduce $CO_2$ emissions. In this study, the application of the post-combustion $CO_2$ capture system, which is based on chemical absorption and stripping processes, to typical fossil fuel fired power plants was investigated. A coal fired plant and a natural gas fired combined cycle plant were selected. Performance of the MEA-based $CO_2$ capture system combined with power plants was analyzed and overall plant performance including the energy consumption of the $CO_2$ capture process was investigated.

$CO_2$ Capture in Pre-Combustion using Principles of Gas hydrate Formation (가스하이드레이트 방법을 이용한 연소전 탈탄소화 기술)

  • Kang, Kyung-Chan;Lee, Jin-Woo;Lee, Man-Sik;Kim, Young-Seok;Lee, Ju-Dong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.602-605
    • /
    • 2008
  • $CO_2$ 분리는 크게 연소전 탈탄소화(pre-combustion capture)와 연소후 포획(post-combustion capture)으로 나누어지는데, post-combustion capture는 연료가 연소하면 $N_2$$CO_2$가 남게 되고 흡수나, 흡착, 막분리 등을 이용해서 $CO_2$를 분리하는 것이고, Pre-combustion capture(연소전 회수)는 연소 전에 이산화탄소가 발생되지 않도록 하는 기술로써, 부분 산화나 개질 및 수성가스 변위반응 등이 포함되며 생성된 수소와 이산화탄소를 분리하여 수소를 생산하는 기술($CO_2/H_2$ 분리가 핵심)이다. 우리나라는 대부분 연소 후 포획 위주로 많은 연구가 진행되어 왔지만, 최근 고유가 시장이 형성되면서 석탄화력발전 및 복합가스발전(IGCC)에 필요한 연소전 탈탄소화($H_2/CO_2$ 가스로부터 $CO_2$ 회수) 연구에 산업적 관심이 급상승 되고 있다. 특히, Pre-combustion 과정에서는 높은 자체압력(약 2.5 - 5.0MPa)과 비교적 높은 농도의 $CO_2$(약 40%의)가 발생되기 때문에, 연소전 탈탄소화는 가스하이드레이트 형성/분해 원리가 가장 잘 적용될 수 있는 기술이라 할 수 있다. 본 연구에서는 비교적 저압 조건에서도 하이드레이트를 보다 쉽게 형성시키는 촉진제를 이용하여 $CO_2/H_2$ 혼합 가스 중 $CO_2$를 분리하는 실험을 수행하였다.

  • PDF

Performance Analysis of Upgrading Process with Amine-Based CO2 Capture Pilot Plant

  • Kwak, No-Sang;Lee, Junghyun;Lee, Dong Woog;Lee, Ji Hyun;Shim, Jae-Goo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.1
    • /
    • pp.33-38
    • /
    • 2018
  • This study applied upgrades to the processes of a 10 MW wet amine $CO_2$ capture pilot plant and conducted performance evaluation. The 10 MW $CO_2$ Capture Pilot Plant is a facility that applies 1/50 of the combustion flue gas produced from a 500 MW coal-fired power plant, and is capable of capturing up to 200 tons of $CO_2$. This study aimed to quantitatively measure efficiency improvements of post-combustion $CO_2$ capture facilities resulting from process upgrades to propose reliable data for the first time in Korea. The key components of the process upgrades involve absorber intercooling, lean/rich amine exchanger efficiency improvements, reboiler steam TVR (Thermal Vapor Recompression), and lean amine MVR (Mechanical Vapor Recompression). The components were sequentially applied to test the energy reduction effect of each component. In addition, the performance evaluation was conducted with the absorber $CO_2$ removal efficiency maintained at the performance evaluation standard value proposed by the IEA-GHG ($CO_2$ removal rate: 90%). The absorbent used in the study was the highly efficient KoSol-5 that was developed by KEPCO (Korea Electric Power Corporation). From the performance evaluation results, it was found that the steam consumption (regeneration energy) for the regeneration of the absorbent decreased by $0.38GJ/tonCO_2$ after applying the process upgrades: from $2.93GJ/ton\;CO_2$ to $2.55GJ/tonCO_2$. This study confirmed the excellent performance of the post-combustion wet $CO_2$ capture process developed by KEPCO Research Institute (KEPRI) within KEPCO, and the process upgrades validated in this study are expected to substantially reduce $CO_2$ capture costs when applied in demonstration $CO_2$ capture plants.

Engineering design procedure for gas turbine combined cycle power plant with post-combustion CO2 capture (CO2 포집을 고려한 가스터빈 복합화력 발전 플랜트의 시스템 대안 평가를 위한 공학 설계)

  • Lee, Soohyeon;Choi, Sangmin
    • 한국연소학회:학술대회논문집
    • /
    • 2014.11a
    • /
    • pp.333-335
    • /
    • 2014
  • As the user demand for power plants becomes various, design objective becomes complicated. To review the system feasibility, system objective and evaluation criteria need to be newly defined. In this study, engineering design procedure of the multi-purpose power plant, such as barge-mounted combined cycle power plant with $CO_2$ capture, was shown as a previous work for the feasibility review of the system alternatives. For the system design, heat and mass balance for each system configuration was firstly performed. Using the thermal analysis results, conceptual design of system alternatives was carried out. And then, preliminary design of the major equipment was done. The engineering calculation results of this study would be used as the evaluation data for system feasibility review.

  • PDF

Performance Comparison of Molten Carbonate Fuel Cell Hybrid Systems Minimizing Carbon Dioxide Emissions (이산화탄소 배출을 최소화하는 용융탄산염 연료전지 하이브리드 시스템들의 성능 비교)

  • AHN, JI HO;YOON, SUK YOUNG;KIM, TONG SEOP
    • Journal of Hydrogen and New Energy
    • /
    • v.28 no.1
    • /
    • pp.30-39
    • /
    • 2017
  • Interests in fuel cell based power generation systems are on the steady rise owing to various advantages such as high efficiency, ultra low emission, and potential to achieve a very high efficiency by a synergistic combination with conventional heat engines. In this study, the performance of a hybrid system which combined a molten carbonate fuel cell (MCFC) and an indirectly fired micro gas turbine adopting carbon dioxide capture technologies was predicted. Commercialized 2.5 MW class MCFC system was used as the based system so that the result of this study could reflect practicality. Three types of ambient pressure hybrid systems were devised: one adopting post-combustion capture and two adopting oxy-combustion capture. One of the oxy-combustion based system is configured as a semi-closed type, while the other is an open cycle type. The post-combustion based system exhibited higher net power output and efficiency than the oxy-combustion based systems. However, the semi-closed system using oxy-combustion has the advantage of capturing almost all carbon dioxide.

KEPCO-China Huaneng Post-combustion CO2 Capture Pilot Test and Cost Evaluation

  • Lee, Ji Hyun;Kwak, NoSang;Niu, Hongwei;Wang, Jinyi;Wang, Shiqing;Shang, Hang;Gao, Shiwang
    • Korean Chemical Engineering Research
    • /
    • v.58 no.1
    • /
    • pp.150-162
    • /
    • 2020
  • The proprietary post-combustion CO2 solvent (KoSol) developed by the Korea Electric Power Research Institute (KEPRI) was applied at the Shanghai Shidongkou CO2 Capture Pilot Plant (China Huaneng CERI, capacity: 120,000 ton CO2/yr) of the China Huaneng Group (CHNG) for performance evaluation. The key results of the pilot test and data on the South Korean/Chinese electric power market were used to calculate the predicted cost of CO2 avoided upon deployment of CO2 capture technology in commercial-scale coal-fired power plants. Sensitivity analysis was performed for the key factors. It is estimated that, in the case of South Korea, the calculated cost of CO2 avoided for an 960 MW ultra-supercritical (USC) coal-fired power plant is approximately 35~44 USD/tCO2 (excluding CO2 transportation and storage costs). Conversely, applying the same technology to a 1,000 MW USC coal-fired power plant in Shanghai, China, results in a slightly lower cost (32~42 USD/tCO2). This study confirms the importance of international cooperation that takes into consideration the geographical locations and the performance of CO2 capture technology for the involved countries in the process of advancing the economic efficiency of large-scale CCS technology aimed to reduce greenhouse gases

Improvement of Post-combustion CO2 Capture Process using Mechanical Vapor Recompression (기기적 증기 재압축 시스템을 적용한 연소 후 이산화탄소 포집공정 개선 연구)

  • Jeong, Yeong Su;Jung, Jaeheum;Han, Chonghun
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.1
    • /
    • pp.1-6
    • /
    • 2016
  • In order to reduce the anthropogenic emission of greenhouse gases, CCS technology has emerged as the most promising and practical solution. Among CCS technology, post-combustion $CO_2$ capture is known as the most mature and effective process to remove $CO_2$ from power plant, but its energy consumption for chemical solvent regeneration still remains as an obstacle for commercialization. In this study, a process alternative integrating $CO_2$ capture with compression process is proposed which not only reduces the amount of thermal energy required for solvent regeneration but also produces $CO_2$ at an elevated pressure.

순산소 연소기술

  • Kim, Seong-Cheol
    • Journal of the KSME
    • /
    • v.50 no.9
    • /
    • pp.34-38
    • /
    • 2010
  • $CO_2$ 포집기술은 크게 연소 후 포집(Post-Combustion Capture), 연소 중 포집기술인 순산소 연소(Oxy-Fuel Combustion) 및 연소 전 포집(Pre-Combustion)으로 구분되며, 이 글에서는 기존의 공기연소 대신에 산소만으로 연소하여 배가스 중의 수분을 응축 제거함으로써 $CO_2$를 포집하는 순산소 기술의 국내 외 개발현황 등을 소개한다.

  • PDF

The Effect of Designing Washing Column in Post Combustion CO2 Capture Plant on the Losses of Amine Solvent (습식아민 CO2 포집설비의 물 세정 단 설계에 따른 흡수제 손실 영향 평가)

  • Han, Sun-Gu;Ko, Hyun-Shin;Kim, Sung-Kyu;Choi, Si-Mook
    • Plant Journal
    • /
    • v.13 no.2
    • /
    • pp.34-38
    • /
    • 2017
  • To reduce global warming, there are so many studies, investments and efforts. The Post Combustion $CO_2$ Capture technology is one of these efforts. But the technologies are having trouble with reducing operating prices. And CCS technology which is using amine solvent uses high price amine solvent. There is solvent losses naturally when operating plant. The solvent loss makes operating and maintenance price higher. In this study, how the washing column of treated flue gas affects the losses of amine solvent and operating was studied.

  • PDF

Deactivation causes of dry sorbents for post-combustion CO2 capture (연소 후 이산화탄소 포집용 흡수제의 비활성화 원인 규명)

  • Cho, Min Sun;Chae, Ho Jin;Lee, Soo Chool;Jo, Seong Bin;Kim, Tae young;Lee, Chul Ho;Baek, Jeom-In;Kim, Jae Chang
    • Korean Chemical Engineering Research
    • /
    • v.57 no.2
    • /
    • pp.253-258
    • /
    • 2019
  • Several materials are used to design the sorbents applied in a fast-fluidized bed process for post-combustion $CO_2$ capture. In this study, $K_2CO_3$-based dry sorbent (KMC) was prepared by using Micro-cell C (MCC), one of the materials used to design the sorbent, and then its $CO_2$ sorption and regeneration properties were evaluated. KMC sorbent showed a low $CO_2$ capture capacity of 21.6 mg $CO_2/g$ sorbent, which is about 22% of the theoretical value (95.4 mg $CO_2/g$ sorbent) even at 1 cycle, and showed a low $CO_2$ capture capacity of 13.7 mg $CO_2/g$ sorbent at 5 cycles. It was confirmed that the KMC sorbent was deactivated due to the formation of a $K_2Ca$ $(CO_3)_2$ phase, resulting from the reaction of the $K_2CO_3$ with the Ca component contained in the MCC. In order to solve the deactivation of sorbent, and KM8 sorbent was prepared by adding the process of calcining the MCC at $850^{\circ}C$. The KM8 sorbent showed a high $CO_2$ capture capacity of 95.2 mg $CO_2/g$ sorbent and excellent regeneration property. Thus, it was confirmed that the deactivation of the sorbent could be solved by adding the calcining step to remove the side reaction causing material.