• Title/Summary/Keyword: port construction

Search Result 670, Processing Time 0.023 seconds

Development and Utilization of Linked Data of Port Maintenance Information for Port Facilities Based on Port BIM Standards (항만 BIM 표준 기반 항만 유지관리 정보의 링크드데이터 구축 및 활용)

  • Shin, Jaeyoung;Moon, Hyounseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.501-510
    • /
    • 2023
  • The importance of using construction data is increasing in accordance with the recent trend in the smart construction. However, construction project and maintenance information is distributed on the web, and the existing BIM(Building Information Modeling) information exchange and linking method using IFC(Industry Foundation Classes) cannot support connection with BIM data and web resources. This study aims to establish the BIM-based port facility data integration system using linked data(LD) technology in order to integrate BIM and heterogeneous data in the port maintenance domain. To this end, the port BIM-based ifcOWL and port facility maintenance ontology were designed, and LD was built for the BIM and maintenance information of Busan New Port 2-1 Pier3, a BIM pilot project. In addition, service prototypes such as search, statistics and SPARQL(SPARQL Protocol and RDF Query Language) endpoint functions were implemented using the issued LD. The LD-based information utilization system is expected to improve the reusability of information by converting the existing closed information system into an open system and BIM and maintenance data as a web resource in a standard format.

Study on Efficient Port Environmental Management for Sustainable Port Operation (I): Case Study of Marine Environments and Natural Resources Impacts by Busan New Port Development (지속가능한 항만운영을 위한 효율적 항만환경관리에 관한 연구 (I): 부산 신항만 개발로 인한 해양환경 및 자원 영향성 평가 사례)

  • Kim, Tae-Goun
    • Journal of Navigation and Port Research
    • /
    • v.40 no.6
    • /
    • pp.401-412
    • /
    • 2016
  • The sustainable operation and development of ports is a key industry for Korea's national economy. It is increasingly more important to resolve conflicts with local communities due to port environmental problems such as air pollution, water pollution, noise and ecosystem destruction while securing port competitiveness through infrastructure expansion. In case of the Busan New Port development project in Korea, construction has been temporally suspended due to conflict with local fishermen over marine sand mining for construction. A primary reason for this is the absence and limitation of qualitative port environmental impact assessment methodologies in Korea. This includes the current investigation of fisheries damaged by ports. Therefore, the main purpose of this study is to propose economic valuation methods for assessing environmental impacts that are essential for efficient port environmental management and for sustainable port operation and development in Korea. To do this, this study examines the overall port environmental problems and their effects (damages) through the analysis of environmental policies and case studies of domestic and overseas ports. Then economic valuation methods are suggested for total economic values (TEV) of damaged environmental goods and services. Among the proposed methods, Habitat Equivalency Analysis (HEA), as a more scientific data based method, was applied to estimate marine ecosystem service damages from the designation of Busan New Port Anchorages. Finally, based on the study results, more efficient port environmental management will be achieved through the institutional adoption of the proposed economic impact assessment methods for port environmental damages.

An Empirical study on improvement of operation for feeder vessel route between Busan and west coast of Japan

  • Kim, Sang-Youl;Kim, Dong-Jin;Ryoo, Dong-Keun;Yoo, Yong-Joo
    • Journal of Navigation and Port Research
    • /
    • v.35 no.7
    • /
    • pp.605-611
    • /
    • 2011
  • In this paper, practical problems for current feeder service between Busan port and west coast of Japan were extracted through in depth interviews with Japanese feeder vessel companies, shippers, and port authority based upon which major criteria (elements) for improvement of the feeder network are structured in hierarchic order and weighed relative importance through AHP method. From the questionnaire answered by Korean and Japanese port users and experts the weights of criteria were calculated and the shipping service was ranked the first by both parties with 0.235 and 0.217, respectively. The port service and support system ranked the second and the third, whereas the port marketing was shown to be the lowest of all. Considering the overall weights, the increase in a port loading and unloading speed of port service was followed by provision of dedicated deck for feeder vessel of port facilities for Korean respondents. Therefore, speed up of the port operations and providing docks for feeder vessel are to be firstly provided for more efficient feeder operations, which would be the basis for the construction of optimal transportation network.

Risk Priority and Allocation of Private Investment in Port Development

  • Seong, Yu-Chang;Youn, Myung-Ou;Keum, Jong-Soo;Kinzo, Inoue
    • Journal of Navigation and Port Research
    • /
    • v.30 no.7
    • /
    • pp.599-605
    • /
    • 2006
  • The Port Development has been achieved by the Government because it needs large scale of funds. However, since 1994, the Govenment has been implemeting private investments for constructing and operating the ports and so on. Although the Government had high expectation that it could expedite the expansion of the port facilities, there were many problems in view of construction, management, financial and social environment. This study figure out that most of the important reasons are the uncertainty of risk allocation between private investors and the Government, using with Analytic Hierarchy Process. It is expected that the results of this study will encourage more private investors to participate in port private investments in the future.

Eulsook-do's Change in Leisure Pattern by the Pre- and Post-Construction of Estuary Dike in the Coastal Area

  • Cho Yoon-Shik;Yhang Wii-Joo
    • Journal of Navigation and Port Research
    • /
    • v.28 no.9
    • /
    • pp.821-825
    • /
    • 2004
  • The purpose of this study is the assessment of changes in the leisure patterns of users of the Eulsook-do before and after the estuary dike construction. The following survey research method was conducted to implement the study, sampling by age was carried out selectively and randomly alike. A total of 319 persons were chosen for final analysis, excluding questionnaires answered found to be inappropriate. To measure the image of the lower Nakdong River around the Eulsook-do, with advice sought from experts, researchers, through several pilot tests, developed a 24-item semantic differential scale(SDS) that has two bi-polar adjectives at each end Study of the pre- and post- construction images of the Eulsook-do located on the coast of Busan suggests the dike construction has brought about negative changes in the Eulsook-do's overall image. There can be two alternatives for improving the negative image: restoration and development.

A Study on Improvement of Legal System for Construction of Very Large Floating Structure (부유식 초대형 해상구조물의 건설을 위한 법제도 개선에 관한 연구)

  • 이한석;송화철
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.365-380
    • /
    • 1999
  • In this thesis the legal systems related to real estate and sea area utilization are studied in order to improve them for construction of Very Large Floating Structure. Main research subjects are as follows: 1) Whether can Very Large Floating Structure be accepted or not as real estate like house and land\ulcorner 2) How can the sea area which is occupied by Very Large Floating Structure be utilized\ulcorner As the conclusion, the Very Large Floating Structure can be registered as real estate even though it is not specified by Korean law for the present. The design concept of Very Large Floating Structure can be interpreted as satisfying enough necessary conditions and factors for Very Large Floating Structure to become real estate. In the near future, we have to make improvement on the laws related with the construction of Very Large Floating Structures so that private sectors can joint the construction. In additions, a new law for various floating structures should be made as soon as possible.

  • PDF

A Study on the Calculation of Construction Costs and Their Annual Equivalent Recovery at PECT and GCT (컨테이너부두의 건설원가와 연간투자비 회수에 관한 연구)

  • 이태우;임종길
    • Journal of Korean Port Research
    • /
    • v.14 no.2
    • /
    • pp.165-173
    • /
    • 2000
  • Major factors that are considered to determine lease charges of container terminals are, among others, construction cost of berth, discount rate, financing cost, and size of annual equivalent recovery. This paper aims to calculate construction costs at PECT and GCT and their annual equivalent recovery on the basis of historical data, and to identify whether or not the relationship of the above result and current lease charges at the two terminals are justifiable.

  • PDF

Method of Reducing Lateral Displacement of Abutment Constructed on Marine Clay Deposits (해안 연약지반상의 교량 구조물 변위 억제)

  • 장용채
    • Journal of Korean Port Research
    • /
    • v.12 no.2
    • /
    • pp.337-348
    • /
    • 1998
  • Since 1970s, though many effective construction methods have been established to solve soft ground problems which had occurred in the off shore land reclamation and on shore highway construction, lateral movement of structure on soft ground is still a big problem to engineers. In this study an applicability of criteria for determining the lateral movement of the structure in soft ground is examined and most measured data is obtained from 140 bridge abutments in highway construction sites. Characteristics and effectiveness of existing methods that used for deciding amount of lateral movements of abutment are analyzed using the obtained data. From the analysis, a proper method to prevent lateral movement is proposed. This method is confirmed on several case histories which were constructed on marine clay.

  • PDF

An Estimation of Port Traffic and the Policy of Port Development;Based on the Busan New Port (해상물동량 예측과 항만개발정책;신항을 중심으로)

  • Yang, Hang-Jin;Chiang, Bong-Gyu
    • Proceedings of the Korea Port Economic Association Conference
    • /
    • 2007.07a
    • /
    • pp.255-270
    • /
    • 2007
  • In North-East Asia, Port traffic in Asia-North America sea route has been rapidly increasing due to economic growth in China and ASEAN. Furthermore, the major shipping companies directly call at northern chinese ports like Qingdao, Dalian and Tianjin without passing through Korean ports on Asia-North America sea route. To acquire a port traffic and develop a hub port, governments in North-East Asia have intensively invested in the development of port. Therefore, Busan new port and Gwangyang port have been developed in Korea. According to the medium-long term development planning, the port should give a enormous budget investment for the port facilities construction. So the inaccurate estimation may lead to the unreasonable port development policy. Firstly, based on the estimation of Chiang Bong-Gyu & Yang Hang Jin(2005), this study gave a comparison with the estimation of Ministry of Maritime Affairs and Fisheries(2001) and OSC/Glori(2005). Secondly, taking into account the influence factors for port traffic, this study made an estimation of port traffic for Busan new port. On the basis of this estimation, this study is compared with the estimation of Ministry of Maritime Affairs and Fisheries(2001) and OSC/Glori(2005). In conclusion, in case of the development of Busan new port, based on the estimation of Ministry of Maritime Affairs and Fisheries(2001), this study should the high possibility that the Busan new port will be serious lack of the port facilities in the year of 2011. And according to the OSC/Glori(2005)'s estimation result, there is a lack of the port facilities, though we have modified the port investment plan.

  • PDF

Study on Influencing Factors of Port Logistics Development Based on Configuration Analysis QCA

  • Li, Jian;Lee, Sang-Chun;Hong, Seung-Lin
    • Journal of Korea Trade
    • /
    • v.25 no.5
    • /
    • pp.58-73
    • /
    • 2021
  • Purpose - In the context of economic globalization and the continuous development of international trade, as countries around the sea peninsula, port construction is particularly important. Based on the research on the influencing factors of port logistics development based on the allocation analysis, QCA (Qualitative Comparative Analysis) provides the basis for the planning and policy of port logistics development and has important theoretical value and practical significance for improving the level of port logistics management, reducing logistics operating costs and increasing economic benefits. In the tide of global integration for the development of port logistics, promote the growth of foreign trade economy of the city. It is also of great significance to the development and progress of commerce and trade. Design/methodology - Based on the relevant data samples of various ports in South Korea, this paper uses fsQCA (fuzzy set Qualitative Comparative Analysis) to integrate and analyze the influence mechanism of port logistics development and extracts five influencing factors of port logistics development, including the port's scale and infrastructure in the hard environment, port-neighboring enterprises in the soft environment, hinterland economy and government support. Findings - The five factors are unable to separately constitute the necessary and sufficient conditions of port logistics development, only a combined model can influence lake port logistics development. The scale and infrastructure of the port itself and port-neighboring ring enterprises are the main core conditions, which work together on the port, affect the throughput capacity of the port, and promote the development of port logistics. When the port-neighboring enterprises are not complete and the scale is low, the growth of port throughput will be restrained and the development of port logistics will be affected, whether the hinterland economic benefits are general, the development of port-neighboring enterprises is insufficient, or the government supports are limited. Originality/value - Through the research on the development of port logistics in South Korea from the perspective of configuration, this paper finds the configuration influence of hard environment and soft environment on the development of port logistics, which has important theoretical and practical significance for better promoting the development of port logistics in South Korea.