• Title/Summary/Keyword: plant operation

Search Result 2,268, Processing Time 0.026 seconds

Control of Booster Output Voltage in Fuel Cell Power Plant (연료전지발전용 부스터의 출력전압제어 연구)

  • Han, Soo-Bin;Jung, Bong-Man;Shin, Dong-Ryul;Choi, Soo-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1992.07b
    • /
    • pp.1038-1040
    • /
    • 1992
  • Booster is used widely as one of the step-up DC/DC power converter in power conversion process for fuel cell power plant which have the electrical characteristic of the high current density and low cell voltage. In view of control system, booster can be unstable when it is operated in broad operation range because the transfer function of booster has zero in right half plane of s-domain. So for reliable operation, controller must make the system stable in whole working range. In this paper, the two control method such as digital PID control and fuzzy control is studied for booster output voltage regulation in fuel cell plant. The design procedure of PID control and fuzzy control is described. And the experiment of designed controller action is performed in various operation points for controller performance test.

  • PDF

Hydraulic and structural considerations of dam's spillway - a case study of Karkheh Dam, Andimeshk, Iran

  • Faridmehr, Iman;Jokar, Mohammad Javadi;Yazdanipour, Mohammadreza;Kolahchi, Ali
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.1
    • /
    • pp.1-17
    • /
    • 2019
  • Preserving reservoir safety has recognized to be important for the public where a vast majority of dams are located upstream of greatly populated cities and industrialized areas. Buckling, floatation and cavitation have caused failure in the spillway gates and conveyance features during past catastrophic events; showed their vulnerability and need for regular inspection along with reviewing design calculations to ensure the spillway meet current design standards. This paper investigates the hydraulic and structural consideration of dam's spillway by evaluating the data of Karkheh Dam's. Discharge capacity, flood routings and cavitation damage risk were main features for hydraulic considerations where hydrostatic and hydrodynamic forces and stability conditions were considered in structural considerations.

Introduction of KIER Pyrolysis Process and 3,000 ton/yr Demonstration Plant (KIER의 열분해유화 공정 기술과 실증플랜트 소개)

  • Shin, Dae-Hyun;Jeon, Sang-Gu;Kim, Kwang-Ho;Lee, Kyong-Hwan;Roh, Nam-Sun;Lee, Ki-Bong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.479-482
    • /
    • 2008
  • Since late of 2000, KIER has developed a novel pyrolysis process for production of fuel oils from polymer wastes. It could have been possible due to large-scale funding of the Resource Recycling R&D Center. The target was to develop an uncatalyzed, continuous and automatic process producing oils that can be used as a fuel for small-scale industrial boilers. The process development has proceeded in three stages bench-scale unit, pilot plant and demonstration plant. As a result, the demonstration plant having capacity of 3,000 tons/year has been constructed and is currently under test operation for optimization of operation conditions. The process consisted of four parts ; feeding system, cracking reactor, refining system and others. Raw materials were pretreated via shredding and classifying to remove minerals, water, etc. There were 3 kind of products, oils(80%), gas(15%), carbonic residue(5%). The main products i.e. oils were gasoline and diesel. The calorific value of gas has been found to be about 18,000kcal/$m^3$ which is similar to petroleum gas and shows that it could be used as a process fuel. Key technologies adopted in the process are 1) Recirculation of feed for rapid melting and enhancement of fluidity for automatic control of system, 2) Tubular reactor specially-designed for heavy heat flux and prevention of coking, 3)Recirculation of heavy fraction for prevention of wax formation, and 4) continuous removal & re-reaction of sludge for high yield of main product (oil) and minimization of residue. The advantages of the process are full automation, continuous operation, no requirement of catalyst, minimization of coking and sludge problems, maximizing the product(fuel oil) yield and purity, low initial investment and operation costs and environment- friendly process. In this presentation, background of pyrolysis technology development, the details of KIER pyrolysis process flow, key technologies and the performances of the process will be discussed in detail.

  • PDF

Optimal Operation of Gas Engine for Biogas Plant in Sewage Treatment Plant (하수처리장 바이오가스 플랜트의 가스엔진 최적 운영 방안)

  • Kim, Gill Jung;Kim, Lae Hyun
    • Journal of Energy Engineering
    • /
    • v.28 no.2
    • /
    • pp.18-35
    • /
    • 2019
  • The Korea District Heating Corporation operates a gas engine generator with a capacity of $4500m^3 /day$ of biogas generated from the sewage treatment plant of the Nanji Water Recycling Center and 1,500 kW. However, the actual operation experience of the biogas power plant is insufficient, and due to lack of accumulated technology and know-how, frequent breakdown and stoppage of the gas engine causes a lot of economic loss. Therefore, it is necessary to prepare technical fundamental measures for stable operation of the power plant In this study, a series of process problems of the gas engine plant using the biogas generated in the sewage treatment plant of the Nanji Water Recovery Center were identified and the optimization of the actual operation was made by minimizing the problems in each step. In order to purify the gas, which is the main cause of the failure stop, the conditions for establishing the quality standard of the adsorption capacity of the activated carbon were established through the analysis of the components and the adsorption test for the active carbon being used at present. In addition, the system was applied to actual operation by applying standards for replacement cycle of activated carbon to minimize impurities, strengthening measurement period of hydrogen sulfide, localization of activated carbon, and strengthening and improving the operation standards of the plant. As a result, the operating performance of gas engine # 1 was increased by 530% and the operation of the second engine was increased by 250%. In addition, improvement of vent line equipment has reduced work process and increased normal operation time and operation rate. In terms of economic efficiency, it also showed a sales increase of KRW 77,000 / year. By applying the strengthening and improvement measures of operating standards, it is possible to reduce the stoppage of the biogas plant, increase the utilization rate, It is judged to be an operational plan.

Optimization of the Design of Large Ducts with the Space Constraint in 500MW Power Plant (500MW 발전소에서 협소 공간 내 대형 덕트 설계의 최적화)

  • Hwang, Woo-Hyeon;Lee, Kyung-Ok;Cho, Yong-Ki
    • Journal of Environmental Science International
    • /
    • v.18 no.7
    • /
    • pp.755-765
    • /
    • 2009
  • Some sections of the exhaust system to determine the shape of the duct is to suffer the difficulties by space constraints to install new equipment of the environment post-treatment for existing operation of the power plants. In this paper the large duct in flue gas desulfurization equipments of the 500MW coal-fired power plant on the current operation is numerically analyzed from induced draft fan exit to booster up fan inlet section which is in the narrow space of the exhaust system with four times bending and is connected to emergency duct to bypass the exhaust gas on the emergency operation. The procedure and method using computational fluid dynamics are proposed to maintain the stability of the guide vane with the uniform flow and a minimum pressure loss of exhaust gas in the case of normal and emergency operation between the direction of the flow of exhaust gas duct at different.

Operation and Diagnosis of DAF Water Treatment Plant at Highly Turbid Raw Water (고탁도시 DAF 정수장의 운영 및 진단)

  • Kwon, Soon-Buhm;Ahn, Hyo-Won;Kang, Jun-gu;Son, Byong-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.2
    • /
    • pp.191-200
    • /
    • 2004
  • DAF process has been designed considering raw water quality characteristics in Korea. Although direct filtration is usually operated, DAF is operated when the freshwater blooms occut or raw water turbidity become high. Pre-sedimentation iS prepared in case when raw water turbidity is very high by rainstorms. A main feature of this plant is that the operation mode can be changed (controlled) based on the characteristics of raw water to optimize the effluent quality and the operation costs. Treatment capacity (surface loading rate) and efficiency of DAF was found to be better than conventional sedimentation process. Moreover, low-density particles (algae and alum flocs) are easily separated while it is difficult to remove in sedimentation. One of the main concerns in adoption of DAF (Dissolved Air-Flotation) process is a high raw water turbidity problem. That is, DAF is not adequate for raw water, which is more turbid than 100NTU. In order to avoid this problem, pre-sedimentation basins are prepared in DAF plant to decrease the turbidity of DAF influent. For simulation of the actual operation, bench and full-scale tests were performed for highly turbid water conditions. Consequently, DAF process coupled with sedimentation is suggested that pre-sedimentation with optimum coagulation prior to DAF would be appropriate.

A Design of Computerizing System for Record Management of ULJIN Nuclear Power Plant (울진원자력발전소(原子力發展所) 자료관리업무(資料管理業務) 전산화(電算化) 연구(硏究)(I))

  • Park, Yong-Boo
    • Journal of the Korean Society for information Management
    • /
    • v.4 no.1
    • /
    • pp.154-169
    • /
    • 1987
  • The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korea on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system logics such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.

  • PDF

The Development of Feed-Water Flow Controller of Boiler Feed-Water Pump in 500MW Class Coal-Fired Power Plant (500MW급 석탄화력발전소 보일러 급수펌프 유량 제어기 개발)

  • Lim, Geon-Pyo;Choi, In-Kyu;Park, Doo-Yong;Jeong, Tae-Won;Kim, Gun-Jung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1663-1672
    • /
    • 2010
  • The boiler feed-water pump controllers which can be applied to 500MW class coal fired power plants was developed. The validity of the developed controllers was shown via the applied test result in a power plant. It is expected that the developed controllers are used to retrofit the existing controllers that have surpassed their expected service life and have limited spare parts, and contributes to the stable operation of plants. Based on the collected data and analysis, new control schemes were developed and implemented during the overhaul period in the new control systems. During normal operation, feed water could be supplied to the boiler with the capability of the 1600t/h flow without any problems in automatic mode of controllers. In this study, the feed-water pump controllers were developed successfully. In addition, it is expected that the developed controllers can make the plant operation more stable and can be applied to a lot of power plants.

A Design of Computerizing System for Record Management of ULJIN Nuclear Power Plant (울진원자력발전소(原子力發電所) 자료관리업무(資料管理業務) 전산화(電算化) 연구(硏究)(II))

  • Park, Yong-Boo
    • Journal of the Korean Society for information Management
    • /
    • v.4 no.2
    • /
    • pp.139-151
    • /
    • 1987
  • The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korean on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system, logies such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area, data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.

  • PDF

Optimal Operation of industrial Cogeneration Plant with Back-Pressure and Extraction-Condensing Turbine/Generators (背壓과 抽氣復水터빈을 採用한 産業用 熱倂合 發電플랜트의 最適運用)

  • 오성근
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.12 no.2
    • /
    • pp.69-76
    • /
    • 1998
  • This paper presents a novel algorithm for determining the optimal operation of a cogeneration plant with back-pressure and extraction-condensing turbine/generators. The proposed algorithm determines the optimum load of boilers and turbine/generators, using only one parameter, the steam mass flow rate, which can be obtained directly from on-line measurement during plant operation. The proposed algorithm consists of the non -linear operating cost function, and its correlated constraints. Furthermore, it has been successfully applied to an actual industrial cogeneration plant, with satisfactory results. Comparison of these results with actual operating data has revealed that using the proposed algorithm results in at least 1.2~4.5[%] operating cost saving, depending on the process steam load. Furthermore the proposed algorithm can be easily installed in a process control computer because the required input data can be easily obtained from information available on-line.n-line.

  • PDF