• Title/Summary/Keyword: plan-based model

Search Result 1,636, Processing Time 0.029 seconds

Analysis on the Replacement Cost of Nuclear Energy Using a Stochastic Programming Model (확률계획법을 활용한 원자력 대체비용의 분석)

  • Chung, Jaewoo;Min, Daiki
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.139-148
    • /
    • 2013
  • A nuclear energy has been one of the most important sources to securely supply electricity in South Korea. Its weight in the national electricity supply has kept increasing since the first nuclear reactor was built in 1978. The country relies on the nuclear approximately 31.4% in 2012 and it is expected to increase to 48.5% in 2024 based on the long-term electricity supply plan announced by the Korean government. However, Fukushima disaster due to 9.0 magnitude earthquake followed by the tsunami has raised deep concerns on the security of the nuclear power plants. The policy makers of the country are much interested in analyzing the cost structure of the power supply in the case that the nuclear is diminished from the current supply portion. This research uses a stochastic model that aims to evaluate the long-term power supply plan and provides an extensive cost analysis on the changes of the nuclear power supply. To evaluate a power supply plan, the research develops a few plausible energy mix scenarios by changing the installed capacities of energy sources from the long-term electricity supply plan. The analyses show that the nuclear is still the most attractive energy source since its fuel cost is very much stable compared to the other sources. Also the results demonstrate that a large amount of financial expenditure is additionally required every year if Koreans agree on the reduction of nuclear to increase national security against a nuclear disaster.

The Research in the Development of the 2+2 Linking Curriculum of the MIS for Junior College (연계교육을 위한 경영정보과의 교과과정 개발에 관한 연구)

  • Jang Kyung-Chae
    • Management & Information Systems Review
    • /
    • v.4
    • /
    • pp.501-527
    • /
    • 2000
  • This plan is referred about linking the department of data processing at Pusan commercial high school with the faculty of management information at Kyungnam Junior College of Information & Technology. The purpose of this plan is educating students at knowledge and skill which reflected changed through development of information technology during the last decade effectively and woke them have ability of good management of future. The effect of this plan is a protection the extravagance by mutual overlaping the quality of education and inspiration the student's will to study by organization education. This research is performed by the purpose of orgarnizing & lingking curriculums and developing plan of management. After mutual comparise and analyze the 1999's curriculm of the department of data prove ssing at pusan commercial high school and the faculty of management information at Kyungnam Junior College of Information & Technology, and receive the holding processor's opinion that based on the aim of management information and direction of employment guidance. The model of curriculum is established like this table. Prepared curriculum model is prepared like this.

  • PDF

Implementation Planning for Information Technology-Based Future Mail Acceptance System (정보기술 기반의 미래형 우편접수창구 구축계획 수립)

  • Jeong, Keun-Chae
    • Information Systems Review
    • /
    • v.7 no.2
    • /
    • pp.141-162
    • /
    • 2005
  • In this paper, we set up an implementation plan for the Mail Acceptance System (MAS) to be operated more effectively and intelligently. First of all, an as-is analysis for the current MAS is performed for analyzing issues and problems and obtaining user requirements. After the as-is analysis, we perform benchmarking studies on the various postal service providers of the advanced countries. Based on the results from the as-is analysis and benchmarking study, we design a conceptual model for the future MAS. The proposed conceptual model can be classified into three parts: automatic MAS, business MAS, and integrated MAS. Information and automation technologies are applied to design the proposed model for eliminating inefficiencies and inaccuracies in MAS. We identify implementation tasks for realizing the proposed MAS model, evaluate the importance and precedence relationship of the identified tasks for deciding implementation priorities, and finally set up the implementation plan for the future MAS. We can expect that the more efficient and effective MAS can be constructed in the future by performing the proposed implementation plan.

Risk-based Operational Planning and Scheduling Model for an Emergency Medical Center (응급의료센터를 위한 위험기반 운영계획 모델)

  • Lee, Mi Lim;Lee, Jinpyo;Park, Minjae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.2
    • /
    • pp.9-17
    • /
    • 2019
  • In order to deal with high uncertainty and variability in emergency medical centers, many researchers have developed various models for their operational planning and scheduling. However, most of the models just provide static plans without any risk measures as their results, and thus the users often lose the opportunity to analyze how much risk the patients have, whether the plan is still implementable or how the plan should be changed when an unexpected event happens. In this study, we construct a simulation model combined with a risk-based planning and scheduling module designed by Simio LLC. In addition to static schedules, it provides possibility of treatment delay for each patient as a risk measure, and updates the schedule to avoid the risk when it is needed. By using the simulation model, the users can experiment various scenarios in operations quickly, and also can make a decision not based on their past experience or intuition but based on scientific estimation of risks even in urgent situations. An example of such an operational decision making process is demonstrated for a real mid-size emergency medical center located in Seoul, Republic of Korea. The model is designed for temporal short-term planning especially, but it can be expanded for long-term planning also with some appropriate adjustments.

Economic Sampling Inspection Plan for Markov Dependent Production Processes (Markov 종속(從屬) 생산(生産) 공정(工程)에서의 경제적(經濟的) 샘플링 검사(檢査) 계획(計劃))

  • Yu, Jeong-Sang;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.1
    • /
    • pp.65-77
    • /
    • 1993
  • Often in a production process, the quality of items is serially dependent. We assume that the quality of items is an attribute which can be classified as good or bad with a Markovian dependence structure. In order to determine sampling inspection plan characteristics such as total inspection cost and average outgoing quality, we design an economic model and illustrate an efficient procedure for design of best inspection plan using graphs based on numerical calculations.

  • PDF

Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

A Linear Programming Approach for Supply Network Planning based on Supply Chain Collaboration Strategy (선형계획법을 이용한 협업공급망계획 수립모델)

  • Lee, Seung-Keun;Lee, Hong-Chul
    • IE interfaces
    • /
    • v.17 no.4
    • /
    • pp.472-481
    • /
    • 2004
  • In this paper, we propose a linear programming model of supply planning process for the supply chain collaboration strategy of a company. The amount of its supplying quantity relies on outsourcing suppliers heavily. Conversely, the revenues of those suppliers are highly dependent on the supplying quota from the supply network planning of the company. In order to keep the supply stable through collaboration, the company builds such a policy to guarantee the fairness on revenue between the supplies. For this, the supply network plan should keep the capacity utilization ratio even for all the suppliers. But the production capacities are different and the distribution of molds is disproportional through suppliers, so the supply network plan is not easily established with simple arithmetic processes. Therefore, we developed the linear programming model with those target function and constraints minimizing the costs for holding inventory and penalty of delayed delivery, simultaneously guaranteeing the even capacity utilization through suppliers. The proposed model has been applied to real case and the evaluation for the planning result from the model would be followed in order to make sure that our model guarantee on extracting the supply network plan subordinated to the policy. Also we mention about further studies for improvement of the model.

Volumetric-Modulated Arc Radiotherapy Using Knowledge-Based Planning: Application to Spine Stereotactic Body Radiotherapy

  • Jeong, Chiyoung;Park, Jae Won;Kwak, Jungwon;Song, Si Yeol;Cho, Byungchul
    • Progress in Medical Physics
    • /
    • v.30 no.4
    • /
    • pp.94-103
    • /
    • 2019
  • Purpose: To evaluate the clinical feasibility of knowledge-based planning (KBP) for volumetric-modulated arc radiotherapy (VMAT) in spine stereotactic body radiotherapy (SBRT). Methods: Forty-eight VMAT plans for spine SBRT was studied. Two planning target volumes (PTVs) were defined for simultaneous integrated boost: PTV for boost (PTV-B: 27 Gy/3fractions) and PTV elective (PTV-E: 24 Gy/3fractions). The expert VMAT plans were manually generated by experienced planners. Twenty-six plans were used to train the KBP model using Varian RapidPlan. With the trained KBP model each KBP plan was automatically generated by an individual with little experience and compared with the expert plan (closed-loop validation). Twenty-two plans that had not been used for KBP model training were also compared with the KBP results (open-loop validation). Results: Although the minimal dose of PTV-B and PTV-E was lower and the maximal dose was higher than those of the expert plan, the difference was no larger than 0.7 Gy. In the closed-loop validation, D1.2cc, D0.35cc, and Dmean of the spinal cord was decreased by 0.9 Gy, 0.6 Gy, and 0.9 Gy, respectively, in the KBP plans (P<0.05). In the open-loop validation, only Dmean of the spinal cord was significantly decreased, by 0.5 Gy (P<0.05). Conclusions: The dose coverage and uniformity for PTV was slightly worse in the KBP for spine SBRT while the dose to the spinal cord was reduced, but the differences were small. Thus, inexperienced planners could easily generate a clinically feasible plan for spine SBRT by using KBP.

A Study on the Subject-based Systematization of National Libraries in Korea (한국 국가도서관의 주제별 체계화 방안 연구)

  • Yoon, Hee-Yoon
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.43 no.4
    • /
    • pp.5-27
    • /
    • 2009
  • The Library and Information Policy Committee announced a national comprehensive plan for all libraries in August, 2008. The plan includes the re-establishment of a subject-based national library system as one of the major policy challenges. Based on the preceding study (an analysis on systematization and the gaps in subject-based national libraries in major countries), this paper proposed three models: a centralized model focused on the NLK, a horizontally-linked model, and a long-term strategic model for subject-based national library systematization in Korea.

Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule (대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션)

  • Kim, Kwang-Sik;Hwang, Ho-Jin;Lee, Jang-Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.2
    • /
    • pp.111-122
    • /
    • 2012
  • Capacity planning plays an important role not only for master production plan but also for facility or layout design in shipbuilding. Product work breakdown structure, attributes of production resources, and production method or process data are associated in order to make the discrete event simulation model of shipyard layout plan. The production amount of each process and the process time is assumed to be stochastic. Based on the stochastic discrete event simulation model, the production capacity of each facility in shipyard is estimated. The stochastic model of product arrival time, process time and transferring time is introduced for each process. Also, the production capacity is estimated for the assumed master production schedule.