• Title/Summary/Keyword: period of maintenance

Search Result 1,271, Processing Time 0.03 seconds

Investigating the Maintenance Cost of Rest Areas: A Case Study of Nevada

  • Shrestha, Kishor;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.624-631
    • /
    • 2022
  • Highway Rest Areas are envisioned to provide an accessible space for rest and parking for travelers, especially those driving a long distance. In addition, modern highway Rest Areas provide many amenities to highway users, including wifi service, picnic tables, litter barrels, running water, public telephones, and sometimes even free coffee. Various studies were conducted in the domain of Rest Area facility design and their operating costs in different states; however, limited studies were conducted on the maintenance costs of these facilities. Therefore, this study's main objective is to compute the annual maintenance cost of Rest Areas in the state of Nevada. This study also analyzes the main cost categories of the maintenance works. The raw cost data of Nevada Rest Area maintenance from 1990 to 2012 were collected from the Nevada Department of Transportation (NDOT). Results show that the maintenance cost fluctuated over the study period; the maintenance cost decreased from 1991 to 2004 and then increased until 2012. The primary cost categories of maintenance work are labor, equipment, and material costs. Among these, labor cost was the largest category with 56 percent of the total maintenance cost, followed by equipment cost and material cost. The findings of this study may help NDOT and other transportation agencies plan their budget for future Rest Area maintenance activities.

  • PDF

Optimal Maintenance Policy for Fishing Vessel Equipment Using Delay Time Analysis

  • Jung, Gi-Mun;Kwon, Young-Sub;Anand Pillay;Jin Wang
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2000.11a
    • /
    • pp.329-333
    • /
    • 2000
  • Delay time analysis is a pragmatic mathematical concept readily embraced by engineers which has been developed as a means to model maintenance decision problem. This paper considers an inspection period using delay time analysis for fishing vessel equipment. We assume that delay time distribution is Weibull and inspections are perfect. In this paper, we determine the optimal inspection period which minimize the expected downtime per unit time.

  • PDF

Optimization of Improvement Level for Second-Hand Product with Periodic Maintenance Schedule (주기적인 유지보수 계획에 따른 중고제품에 대한 최적 향상수준)

  • Kim, Dae-Kyung;Kim, Jin Woo;Park, Dong Ho
    • The Korean Journal of Applied Statistics
    • /
    • v.26 no.1
    • /
    • pp.151-162
    • /
    • 2013
  • Due to a growing demand for the second-hand product, especially for the expensive one, the warranty and maintenance policies for such products have been studied to improve the product reliability of late. In this paper we study a periodic maintenance model for the second-hand product which is purchased by the customer at the age of $x$. When purchased, the dealer provides a warranty of a fixed length during which the product is maintained periodically to reduce the failure rate of the product and thus, to improve the reliability after each maintenance is served. If a failure occurs between two successive maintenances, only minimal repair is conducted. As for the warranty policy, we adopt free non-renewing repair action on each failure, in addition to the periodic maintenance service during the warranty period. Thus, under the given warranty policy, all the maintenance and repair costs incurred during the warranty period are charged to the dealer. For the proposed periodic maintenance scheme, we formulate a cost model to evaluate the expected total cost charged to the dealer during the warranty period and derive an optimal upgrade level of the failure rate at each maintenance to minimize the expected total warranty cost from the perspective of the dealer. We also present numerical results for an optimal upgrade level based on the proposed methods.

Study on the Failure Distribution Estimation using Linear Regression Analysis (선형회기분석을 이용한 고장분포 추정에 관한 연구)

  • Lee, Kang-Mi;Shin, Duc-Ko;Baek, Jong-Hyun;Lee, Jae-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2008.06a
    • /
    • pp.1109-1110
    • /
    • 2008
  • It is required to optimize the system operation efficiency to allocate maintenance task and period using systemic maintenance process. To allocate maintenance task and period must analysis the failure distribution mode at first. In this paper, we introduce the linear regression analysis and estimate the failure distribution for the railroad signal equipment using that.

  • PDF

Effect of Breathing Exercises via Joint mobilization on the Lung Function and Spinal Alignment of Straight-necked Women

  • Kong, Byung-Sun;Jeong, Beom-Cheol;Yoo, Kyung-Tae
    • Journal of the Korean Society of Physical Medicine
    • /
    • v.15 no.4
    • /
    • pp.55-65
    • /
    • 2020
  • PURPOSE: This study examined the effects of breathing exercises via joint mobilization on the lung function and spinal alignment of 30 straight-necked women in their 20 s and 30 s. METHODS: The participants were divided into two groups: an experimental group who performed breathing exercises via joint mobilization, and a control group who performed general stretching exercises. The differences between the two groups were measured and compared at three points in time: during the pre-examination, after four weeks of intervention, and after a four-week maintenance period. The changes in each group were measured before and after the intervention and after a one-month maintenance period and compared. For data analysis, the SPSS 22 was used to obtain the mean and standard deviation with a significance level of α = .05. RESULTS: Eight weeks of breathing exercises via joint mobilization and general stretching exercises positively impacted the lung function and spinal alignment in straight-necked patients. In particular, the experimental group showed more significant differences in spinal alignment after four weeks period of intervention and four weeks of maintenance. CONCLUSION: Breathing exercises via joint mobilization can be considered an effective intervention that can improve the respiratory volume and spinal alignment for patients with straight necks.

Study on tooth mortality after periodontal therapy (치주 치료 후 치아 상실에 관한 연구)

  • Kim, Hyung-Seop;Seok, Jeong-Jin;Kim, Hyun-Chul;Lee, Su-Jeong;Choi, Seoung-Hwan
    • Journal of Periodontal and Implant Science
    • /
    • v.33 no.2
    • /
    • pp.215-223
    • /
    • 2003
  • The main goal of periodontal treatment is the long-term maintenance of teeth. Periodic maintenance program is need to prevent periodontal disease and maintain healthy periodontium. Hirschfeld and Wasserman(1978) studied 600 treated periodontal patients. This study categorized periodontal patients using well-maintained, downhill, extreme downhill groups. The purpose of our study is to evaluate effect of periodontal treatment and analyse tooth loss after periodontal treatment using this classification. The study population of j9 patients had been treated and maintained for mean 5.8 years. All patients were on a periodic maintenance program at 2-, 3-, 4, or 6-month intends. The avenge age of the patients at the time of original therapy was 49.6 years. To analyse tooth loss, modified classification was used on the basis of response to therapy using by Hirschfeld and Wasserman in 1978. The results were as follows : 1. 59 treated patients were lost mean 1.42 teeth per patient for 5.8 years of maintenance period. 2. Maxillary first molars were most frequently lost but mandibular lateral incisors were lost no tooth during maintenance period. 3. Tooth mortality received surgical treatment had similar to received nonsurgical treatment. 4. Tooth loss was more frequent in maxillary teeth than mandibular teeth, and posterior teeth than anterior teeth, and more frequent tendency in male than female.

A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation (공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구)

  • Lee, Kang-Won;Bhang, Youn-Keun;Son, Young-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.

Optimization of preventive maintenance of nuclear safety-class DCS based on reliability modeling

  • Peng, Hao;Wang, Yuanbing;Zhang, Xu;Hu, Qingren;Xu, Biao
    • Nuclear Engineering and Technology
    • /
    • v.54 no.10
    • /
    • pp.3595-3603
    • /
    • 2022
  • Nuclear safety-class DCS is used for nuclear reactor protection function, which is one of the key facilities to ensure nuclear power plant safety, the maintenance for DCS to keep system in a high reliability is significant. In this paper, Nuclear safety-class DCS system developed by the Nuclear Power Institute of China is investigated, the model of reliability estimation considering nuclear power plant emergency trip control process is carried out using Markov transfer process. According to the System-Subgroup-Module hierarchical iteration calculation, the evolution curve of failure probability is established, and the preventive maintenance optimization strategy is constructed combining reliability numerical calculation and periodic overhaul interval of nuclear power plant, which could provide a quantitative basis for the maintenance decision of DCS system.

Periodic Preventive Maintenance Policies when Minimal Repair Costs Vary at Failures

  • Joon Keun Yum;Gi Mun Jung;Dong Ho Park
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.3
    • /
    • pp.86-95
    • /
    • 1997
  • This paper considers a repairable system, which is maintained preventively at periodic times and is minimally repaired at each failure. Most preventive maintenance policies for such repairable systems assume that the cost of minimal repair is constant regardless of its age at failure. However, it is more practical to consider the situations where the cost of minimal repair is dependent not only on its age at failue, but also on the number of preventive maintenance carried out prior to its failure. We consider the preventive maintenance carried out prior to its failure. We consider the preventive maintenance policy with age-dependent minimal repair cost. The optimal policies which minimize the expected cost rate over an infinite time span are discussed. We obtain the optimal period and number of preventive maintenance prior to replacement of the system.

  • PDF

(A Study on Optimization for Connected-(r,s)-out-of-(m,n):F System ) ((m,n)중 연속(r,s):F시스템의 최적화 연구)

  • Lee, Sang-Heon;Gang, Yeong-Tae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.618-629
    • /
    • 2006
  • This Paper is about optimizing preventive maintenance period of connected (r,s) out of(m,n) : F lattice system that one of multi-component system, (m,n) matrix failure of whole system is occurrence when parts that belong in (r,s) matrix part procession of parts arranged with procession are breakdown all. The preventive maintenance about system is very important viewing from system reliability and operational expense viewpoint. Preventive maintenance that misses a time calls big loss by system failure and expense of frequent full equipment is paid excessively in preventive maintenance itself but expense is paid much in preventive maintenance itself and whole expense escalation can be achieved preferably. Through this research, reliability model is constructed that do expense by smallest under full equipment policy chosen through comparison of each full equipment policy and preventive maintenance expense full equipment cycle and r ,s value are made using simulated annealing algorithm and simulated annealing algorithm that converge fast in multi-component system certified most suitable to optimization decision

  • PDF