• Title/Summary/Keyword: period of maintenance

Search Result 1,271, Processing Time 0.028 seconds

RIMS data time a series analysis a city railroad a use efficiency improve (RIMS 데이터 시계열 분석을 통한 도시철도 운용효율 향상)

  • Lee, Do-Sun;Chun, Houng-Jun;Park, Soo-Choong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1308-1314
    • /
    • 2008
  • In this paper, Seoulmetro that is the first operation organization which operates a city railroad rolling-stock maintenance RIMS(rolling stock information maintenance system) collected and analyzed a light maintenance data and introduced time a series analysis technique to find the way how to contribute to a use efficiency improvement of a city railroad. The purpose of time a series analysis is to remove a seasonal change including data and to check an irregular fluctuation. First of all, a collection range of the data comes under a light maintenance, however it needs a data of more than 3 years to check the seasonal change. We put a study for an accumulated scope that the data satisfy a period like this and are able to extend a range of the study when time flys forward. The data used for study is filtered using a movement average method after passing proper selection working and is solved with a method which looks for season index. Using the season index that was getten in here, we predict a light working frequency, if it has an irregular change, we will contribute it to a city railroad a use efficiency improvement and establish the cause by carrying out prevent maintenance in advance.

  • PDF

Long-term evaluation of teeth and implants during the periodic maintenance in patients with viral liver disease

  • Yoon, Da-Le;Kim, Yong-Gun;Cho, Jin-Hyun;Lee, Sang-Kyu;Lee, Jae-Mok
    • The Journal of Advanced Prosthodontics
    • /
    • v.8 no.4
    • /
    • pp.321-328
    • /
    • 2016
  • PURPOSE. This study was designed to investigate the maintenance of teeth and implants in patients with viral liver disease. MATERIALS AND METHODS. 316 patients without any significant systemic disease were selected as a control group. Liver disease group was consisted of 230 patients. Necessary data were collected using clinical records and panoramic radiographs. Then, the patients were subdivided into 2 groups based on the type of active dental therapy received before maintenance period (Pre-Tx). Analysis for finding statistically significant difference was performed based on the need for re-treatment of active dental therapy (Re-Tx) and change in the number of teeth (N-teeth) and implants (N-implants). RESULTS. Comparing to control group, the patients with liver disease showed higher value on N-teeth, N-implants, and Re-Tx. Statistically significant differences were found on N-teeth (P=.000) and Re-Tx (P=.000) in patients with non-surgical Pre-Tx. Analysis based on severity of liver disease showed that N-teeth and Re-Tx were directly related to severity of liver disease regardless of received type of Pre-Tx. Significant differences were found on N-teeth (P=.003) and Re-Tx (P=.044) in patients with non-surgical Pre-Tx. CONCLUSION. In this study, it was concluded that liver disease might influence the loss of teeth and cause the relapse of dental disease during maintenance period in patients. A significant positive relationship between tooth and implant loss and severity of liver disease seems to exist.

Determination of Protein Requirements for Maintenance of Elk Doe

  • Kim, Kwan-Woo;Lee, Jinwook;Kim, Dong-Gyo;Lee, Eun-Do;Lee, Sung-Soo;Kim, Do Hyung;Lee, Sang-Hoon
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.40 no.3
    • /
    • pp.177-181
    • /
    • 2020
  • Data on the crude protein requirements of elk doe are nonexistent and the data are essential for their management in Korea. Therefore, this study was conducted to evaluate the crude protein requirement for maintenance of elk doe. Three female elk deer were used in 3 × 3 Latin square design with three diets containing three levels of crude protein (CP) that contained low crude protein (approximately 12%), medium crude protein (15%), and high crude protein (18%). Each three elk doe trials included a 14-day preliminary period and a 5-day collection period. Crude protein intake was 4.83, 6.26, and 9.00 g/d for 12%, 15%, and 18% of CP level, respectively. Crude protein balances were 1.04, 1.41, and 4.14 for 12%, 15%, and 18% of CP level, respectively. The maintenance requirement for CP from the regression equation between CP intake and CP balance were 3.70 g/BW0.75.

Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants (화력발전설비 위험도 평가를 통한 기기별 정비주기 예측)

  • Song, Gee Wook;Kim, Bum Shin;Choi, Woo Song;Park, Myung Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.10
    • /
    • pp.1291-1296
    • /
    • 2013
  • Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (POF) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RBI is to identify important failure modes and causes in the equipment. Once these are defined, the POF and COF can be assessed for each failure. During POF and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the POF is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

A Study on Root Growth and Soil Moisture Extraction Patten during Growing Period of Upland Crops -Soybean, Redpepper, Sesame- (밭작물의 뿌리성장과 생육시기별 토양수분 소비형태에 관한 연구 - 콩, 고추, 참깨 -)

  • 정하우;박상현;김성준;정영신
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.1
    • /
    • pp.67-75
    • /
    • 1993
  • This study is to analyze both root growth and soil moisture extraction pattern during the growing period of upland crops with respect to soybean, redpepper, sesame. Field and lysimeter tests were conducted under 12 treatments of soil moisture level by the San Cristobal experimental design(1981) and 3 soil type(sand, sandy loam, silty loam) for 4 years('87-'90) at the experimental plot of Rural Development Administration located in Suwon. The results of this study are summarized as follows : 1.For soybean, redpepper and sesame, root growth in dry soil was better than that in wet soil and it could be expressed as a sin function in terms of time. Maximum root depth was about 55cm, 44cm, 40cm respectively. 2.The average soil moisture extraction pattern for soybean, redpepper and sesame were 61.4%, 62.8%, 79.5% for zone l(0-l5cm). 25.5%, 27.1%, 18.3%, for zone 2(15-30cm).11.4%, 9.8%, 2.3% for zone 3(30-45cm), 1.7%, 0.3%, 0.04% for zone 4(45-60cm) respectively. This means that Zone 1 would be the dominant zone in irrigation scheduling. 3.With respect to soybean, the soil moisture extraction pattern(SMEP) was varied somewhat according to the erent maintenance of soil moisture level. The average SMEP for high maintenance of soil moisture was 46%, 29%, 17%, 8%, for middle maintenance of soil moisture was 43%, 29%, 17%, 11 % and for low maintenance of soil moisture was 40%, 28%, 20%, 12%, respectively. 4.With respect to soybean, the soil moisture in the upper layer was distinctly consumed more than that in the lower layer for clay loam soil and the soil moisture of all layers was consumed evenly for sand soil. The SMEP for sandy loam soil showed a middle result compared with the above 2 soil types.

  • PDF

A Pilot Randomized Trial of As-Needed Budesonide-Formoterol for Stepping Down Controller Treatment in Moderate Asthma with Complete Remission

  • Nakwan, Narongwit;Ruklerd, Thidarat;Taptawee, Pattarawadee
    • Tuberculosis and Respiratory Diseases
    • /
    • v.85 no.3
    • /
    • pp.227-236
    • /
    • 2022
  • Background: The use of low-dose inhaled corticosteroid-formoterol as reliever monotherapy has recently been recommended in the asthma treatment guidelines. However, the efficacy of this treatment strategy has not yet been determined during the stepping-down period in moderate asthma. This study aimed to evaluate the feasibility of reducing treatment to as-needed budesonide-formoterol (BFM) in moderate asthma with complete remission. Methods: We randomly assigned 31 patients (8 males and 23 females with a mean age of 57.2 years) with complete remission of asthma by inhaled BFM (160/4.5 ㎍) twice daily to receive BFM (160/4.5 ㎍) as needed (16 patients), or budesonide (BUD) (200 ㎍) twice daily (15 patients). The study was an open-label study done for 48 weeks, with the primary outcome as the cumulative percentages of patients with treatment failure (asthma exacerbation or loss of asthma control or lack of satisfaction after using medications) in the two groups. Results: Six patients (42%) using as-needed BFM had treatment failure, as compared with three patients (21.4%) using BUD maintenance (hazards ratio for as-needed BFM, 1.77; 95% confidential interval, 0.44-7.12; p=0.41). The changes in forced expiratory volume in 1 second were -211.3 mL with as-needed BFM versus -97.8 mL with BUD maintenance (difference, 113.5 mL; p=0.75) and the change in fractional exhaled nitric oxide was significantly higher in both groups, at 8.68 parts per billion (ppb) in the as-needed BFM group and 2.5 ppb. in the BUD maintenance group (difference, 6.18 ppb; p=0.049). Conclusion: Compared with BUD maintenance, there were no significant differences in treatment failure rate in patients who received as-needed BFM during the stepping down period in moderate asthma. However, they showed reduced lung function and relapsed airway inflammation. The results are limited by imprecision, and further large RCTs are needed.

Development of Stochastic Decision Model for Estimation of Optimal In-depth Inspection Period of Harbor Structures (항만 구조물의 최적 정밀점검 시기 추정을 위한 추계학적 결정모형의 개발)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.2
    • /
    • pp.63-72
    • /
    • 2016
  • An expected-discounted cost model based on RRP(Renewal Reward Process), referred to as a stochastic decision model, has been developed to estimate the optimal period of in-depth inspection which is one of critical issues in the life-cycle maintenance management of harbor structures such as rubble-mound breakwaters. A mathematical model, which is a function of the probability distribution of the service-life, has been formulated by simultaneously adopting PIM(Periodic Inspection and Maintenance) and CBIM(Condition-Based Inspection and Maintenance) policies so as to resolve limitations of other models, also all the costs in the model associated with monitoring and repair have been discounted with time. From both an analytical solution derived in this paper under the condition in which a failure rate function is a constant and the sensitivity analyses for the variety of different distribution functions and conditions, it has been confirmed that the present solution is more versatile than the existing solution suggested in a very simplified setting. Additionally, even in that case which the probability distribution of the service-life is estimated through the stochastic process, the present model is of course also well suited to interpret the nonlinearity of deterioration process. In particular, a MCS(Monte-Carlo Simulation)-based sample path method has been used to evaluate the parameters of a damage intensity function in stochastic process. Finally, the present stochastic decision model can satisfactorily be applied to armor units of rubble mound breakwaters. The optimal periods of in-depth inspection of rubble-mound breakwaters can be determined by minimizing the expected total cost rate with respect to the behavioral feature of damage process, the level of serviceability limit, and the consequence of that structure.

A Study on the Characteristics of Landfill Expenses on Urban and Residential Environment Maintenance Project - Centered around Seoul City - (도시 및 주거환경정비사업 매몰비용 특성에 관한 연구 - 서울시를 중심으로 -)

  • Lee, Mi-Ok;Lee, Im-Jung
    • KIEAE Journal
    • /
    • v.17 no.2
    • /
    • pp.35-43
    • /
    • 2017
  • Purpose: The purpose of this study is to find out the characteristics of service (landfill) costs (hereinafter, the "landfill costs") applied to the dissolution promotion committee and analyze the characteristics of landfill costs at the time where the dissolution of promotion body is increasing with the authority of the head of local government regarding the territory difficult with the continuous promotion by delaying or suspending the project for a prolonged period or suspending the project through the dissolution of the project body by the promotion committee and cooperative union since the flawless promotion of the maintenance project. Method: After revising the law in February 2012, the survey and analysis is made for the status of applying landfill costs and maintenance project scale of the dissolution promotion committee not confirmed in details around a total of 20 regions, including, 9 regions of redevelopment projects completed with the advance review, 7 regions of re-construction projects and 4 regions of urban environment maintenance projects from the total of 59 regions, Result: The influence on the landfill costs is shown to be greatest in the service expenses and management and supervision on this field has significance for the maintenance project perceived as private project, rather than public project, that the public management is neglected with insufficient presentation of operation criteria and so forth that it displays the tendency to lead to the discrete operation of the project body. In order to enhance the transparency of operating costs for the projects that are led by private capital, it is required to strengthen the role of public sector through enthusiastic intervention by the public sector in standardization of operation criteria, presentation of guideline and so forth.

Assessment of changes on water quality and aquatic ecosystem health in Han river basin by additional dam release of stream maintenance flow (하천유지유량 추가 댐방류에 따른 한강유역의 수질 및 수생태계 건강성 변화 평가)

  • Woo, So Young;Kim, Seong Joon;Hwang, Sun Jin;Jung, Chung Gil
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.spc2
    • /
    • pp.777-789
    • /
    • 2019
  • The purpose of this study is to evaluate changes in water quality and aquatic ecosystem health by additional dam release of stream maintenance flow from multipurpose dams in Han river basin ($34,148km^2$) using SWAT (Soil and Water Assessment Tool). The period of additional release was spring (April to June) and autumn (August to October) to evaluate the changes with the data of aquatic ecosystem health survey. The amount of additional release was set proportional to the present dam release, and the maximum release amount was controlled not to exceed the officially notified stream maintenance flow from dam. The 10 percent to 50 percent additional releases showed that the stream water quality (T-N, $NH_4$, T-P, and $PO_4-P$) concentrations except $NO_3-N$ decreased in spring while increased in autumn period. Using the stream water quality results and applying with Random Forest algorithm, the grade of aquatic ecosystem health index (FAI, TDI, and BMI) was improved for both periods especially in the downstream of basin. This study showed that the additional release of stream maintenance flow was more effective in spring than autumn period for the improvement of water quality and aquatic ecosystem.

A Study on the Qualification System for Raising Engineers of Maintenance for Apartment Houses - Based on the Qualification System of the United States - (공동주택 유지관리전문인력 육성을 위한 자격체계에 관한 연구 - 미국의 자격체계를 중심으로 -)

  • Park, Sang Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.1
    • /
    • pp.169-179
    • /
    • 2011
  • Korea owns vast amount of apartment houses no less than those of world prominent countries, but did not pay enough efforts to maintain existing apartment houses and develop policies to reuse them due to growth driven policy of housing supply like construction of new houses. Korea constructed tremendous amount of houses in short period through government led forced house supplying policy, and resulted in excess houses such that present house supply rate happened to be reaching 110%. However, recently there are growing demand of change in housing policy due to social environmental changes like low birth rate and aging of society etc and nationals' demand for improvement of residential quality. When such social changes are demanded and 80% of apartment houses in Korea are less than 20 years old, renovations and remodeling of apartment houses are anticipated to emerge as important matter. In particular, the apartment houses in Seoul and the 1st generation new cities like Bundang and Ilsan etc have passed considerable period of time after construction and require safety measure, it is quite impending to raise engineers for the maintenance of existing apartment houses. Therefore, in this paper, direction for the raising of maintenance engineers in Korea was proposed through analysis of relevant qualification system for the apartment houses maintenance engineers in the U.S.