• Title/Summary/Keyword: performance measurement and management

Search Result 974, Processing Time 0.026 seconds

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF

A Study on an Equipment Performance Measurement System for Effective Bottleneck Management (병목 설비의 개선 활동에 유용한 설비관리 지표체계에 관한 연구)

  • Lee, Min-Ho;Lim, Sung-Mook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.100-113
    • /
    • 2010
  • Manufacturing companies' cost competitiveness with respect to equipment management can be achieved by satisfying additional market demands by their own capacity without purchasing additional equipments. In essence, it can be accomplished by making continuous investigation into bottlenecks and improvement on them. Therefore, equipment performance measure systems should be designed so that they can support manufacturing companies' such endeavors. With the purpose of establishing an effective equipment performance measurement system for detecting and improving bottlenecks, this study (1) suggests some desirable features that such a system should have, (2) evaluates conventional equipment performance measurement systems in terms of their usefulness for the detection and improvement of bottlenecks, and (3) proposes an improved system. We also perform a simulation experiment to demonstrate the limitations of the conventional systems and show how the proposed system can resolve the problems.

A Proposed Self-assessment Framework for Measuring and Benchmarking Organizational Performance

  • Pun, Kit-Fai;Ho, Karis-Ka-Yan;Sun, Hong-Yi
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.57-73
    • /
    • 2002
  • Recent interests in total quality management (TQM) and business excellence (BE) had been fuelled with a range of national and regional awards. These awards are being increasingly used by organisations as part of the business improvement process and strategic benchmarking. This paper reviews the concepts and approaches of performance measurement (PM) and discusses the integration of PM with the TQM and BE philosophies. A TQM-BE-PM framework with a set of self-assessment checklists was developed. In order to complement the literature base with empirical evidence, an industry survey was conducted and a trial implementation of the framework was carried out in a leading manufacturing firm in Hong Kong. The self-assessment performance data of the fm was evaluated and then benchmarked with the industry averages obtained from the survey. This paper presents the empirical findings and discusses the applicability of the framework in measuring and benchmarking organisational performance toward continual improvement.

Evaluation of Performance Measurement System Alternatives for Construction Companies (건설기업에 적합한 성과측정시스템/Framework의 대안 평가)

  • Kim Ki-Hyon;Yu Il-Han;Shin Dong-Woo;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.398-403
    • /
    • 2004
  • Construction companies have been required high technique and integration of management. Because they not only have got high competition, variation of customer's demands, social and economical changes but also more complex and specialization. Construction companies require performance measurement to exclude inefficiency and be aware of their business performance level, but domestic construction industry does not have adequate performance measurement system like as manufacture industry or business administration. So this paper evaluate of performance measure system alternatives for construction companies.

  • PDF

Strategic Performance Measurement of Knowledge Management in Construction Industry (건설산업 지식경영의 전략적 성과측정 방법 연구)

  • Ko Sung-Kwan;Kim Jae-Jun;Baek Jong-Kun;Kim Dae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.45-57
    • /
    • 2001
  • Knowledge management was introduced as a new strategy in many construction companies aiming at paradigm shift since Asian financial Crisis. However, intensive focusing on acquiring and sharing knowledge couldn't keep pace with the primary goal. Increasing financial profits. That is because clear strategic process and performance measurement are absent in time of the introduction of knowledge management. Based on case analysis in domestic construction industry, this research work presents an alternative plan on Balanced Scorecard(BSC) model. The objective of this study is to develop a model of strategic performance measurement in knowledge management by sorting and grasping core operational knowledge, which can draw key performance indicators accompanied by knowledge map from case study.

  • PDF

The Fuzzy QFD Approach to Importance the Public Sector Information Performance Measurement Category (퍼지 QFD를 활용한 공공부문 정보화 성과 측정범주 중요도 도출)

  • Oh, Jin-Seok;Song, Young-Il
    • Information Systems Review
    • /
    • v.12 no.2
    • /
    • pp.189-203
    • /
    • 2010
  • Is presenting guidance of information performance measurement as government PRM version 2.0 these common reference models in public sector. Government PRM is consisted of assessment classification system and standard line of sight and performance management standard form. Through this, is sorting performance element and define cause-and effect. Government PRM is supplying measurement categories at assessment classification system, but relative importance for application standard by measurement categories is not presenting. In this study, importance for government PRM's measurement categories been applying by commonness Test of information performance measurement of public sector wishes to deduce estimation and priority. Research model used Fuzzy QFD, and designed so that can reflect well PRM's development purpose. I applied Fuzzy AHP and FPP method that graft together fuzzy theory to minimize uncertainty and ambiguity in that expert opinion. Is drawn to element that "Standard model offer for information department and management" is the most important in government PRM's development purpose. "Quality of service" is showing the highest priority in customer results in measurement category. Importance for government PRM's measurement categories can offer common valuation basis in government and public institution. Hereafter if examine closely quantitative cause-and effect for structure model of measurement classification system when study government PRM more objective and efficient reference model become.

Integrating Balanced Scorecard and Analytic Hierarchy Process Techniques for Evaluating Corporate Performance

  • Sohn, Myung-Ho;Park, Sungbum;Lee, Heeseok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.111-115
    • /
    • 2001
  • A good business performance measurement system is an effective tool io sustained growth in profits. Although interest in creating performance measurement models is widespread, a well-designed system is rare. To be successful in today's competitive environment, a performance measurement system should incorporate strategic success factors and contain financial and non-financial measuring index to carry out strategic management. In the 1990s, Kaplan & Norton introduced a concept called the Balanced Scorecard. The Balanced Scorecard supplements traditional financial measures with criteria that measured performance from three additional perspectives - those perspectives of customers, internal business processes, and learning and growth. This paper presents five measuring index criteria for each perspective. To calculate the relative priority for These measuring index, we investigate weights investigated by interviews with management consultant. Then, AHP method is employed for calculating priority weight. Our evaluation model may be referred to as the Balanced Analytic Hierarchical Performance Model(BAHPM) in the sense that the analytic hierarchical scheme, along with the AHP, is applied. The BAHPM is the first kind of analytical model to cover a wide variety of measures. In comparison with previous evaluation models, our model shows strengths in structural flexibility, ease of incorporating feedback, group evaluation capacity, participation promotion, sensitivity analysis, and computational simplicity. A prototype based on the BAHPM can be applied to various industry sectors.

  • PDF

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

A study on development of BSC system for performance measurement in retrieval distribution business (회수물류업에서의 성과측정을 위한 BSC (Balanced Scorecard) 시스템 개발에 관한 연구)

  • Yoon, Jun-Sup;Suh, Byong-Yoon;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.1
    • /
    • pp.107-116
    • /
    • 2008
  • Nowadays, BSC presented by alpan is observed by many enterprises and is being operated gradually. BSC includes non-financial factor as well as financial factor in performance assessment and it is a tool that will be able to evaluate even strategy of long-term view. In point of performance management, BSC brings in relief importance on non-financial performance as well as financial performance and it shares with viewpoint of 4 things of financial viewpoint, customer viewpoint, internal process view point, learning and growth viewpoint. then these make an array with vision and strategy of organization by causal relationship, it presented necessity of performance control on organization as center on KPI of inner of each viewpoint. Thus, study on measures and control of management performance is progressed actively and is accomplishing much development. This study is aimed at calculation of weight that is able to reflect its importance about AHP on KPI of each viewpoint. The purpose of this study is to present desirable performance measurement model and to give a weight in consideration of working-level character.

A General ion Method of Measurement Units for Performance Tracking (진도율 산정을 위한 측정 단위 도출 방안에 관한 연구)

  • Yoon Su-Won;Chin Sang-Yoon;Kim Yea-Sang;Jung Young-Soo;Park Sung-Soo;Park Soon-Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.521-524
    • /
    • 2003
  • Recently various construction management systems are applied for more efficient project management, and through them as-built construction information is collected. However, the accuracy of the collected information shows big differences among projects, since tile collection of tile as-built information is not based on objective manner or criteria and also each management personnel uses difference criteria on this based on individual experiences. This initiates the need for a development of methods and information frameworks for efficient collection and management of as-built information with assurance of data accuracy. Therefor the objective of this study is to suggest a method to determine the task performance measurement unit depending on the characteristics of work types. A prototype system was developed for generating task performance measurement units by utilizing MS ACCESS. The information framework and the system developed in this research is expected to help standardized performance measurements across projects by improving the objectivity and the accuracy of the collected information.

  • PDF