• Title/Summary/Keyword: performance indicator

Search Result 990, Processing Time 0.03 seconds

A Case Study of Horticultural Instruction as Education of Vocational Rehabilitation: Effects of Horticulture Job Skill Course Based on Employment Practice Model on Personal Performance Indicator of Vocational Rehabilitation for University Students with Disability

  • Kim, Soo Yeon
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.1
    • /
    • pp.65-73
    • /
    • 2019
  • The purpose of the study was to examine the effects of the Horticulture Job Skill course based on the employment practice model on personal performance indicator of vocational rehabilitation for university students with disabilities. In the first step of this study, an employment practice model was developed by a focus group composed of six specialists from the industry and academia. The second step consisted of selecting the items of personal performance indicator related to horticulture vocational rehabilitation among all items of vocational rehabilitation. The third step was selecting students to participate in the study. The next step was coming up with a pilot instructional design based on the employment practice model. The final step was examining the effects of pilot course (horticulture job skill) based on the employment practice model on personal performance indicator of vocational rehabilitation for university students with disabilities. As a result, there were significant improvements after treatment in the experimental group with indicator 1 (managing) from 1.8±0.155 to 4.2±0.267, indicator 2 (planting) from 1.5±0.114 to 4.45±0.153, indicator 3 (using tool) from 3.2±0.186 to 4.6±0.112, indicator 4 (packing) from 2.05±0.153 to 4.45±0.114, indicator 5 (decorating) from 2.65±0.150 to 5.5±0.114, indicator 6 (cleaning) from 2.85±0.131 to 4.45±0.114, indicator 7 (observing) from 2.4±0.112 to 4.45±0.112, and indicator 8 (laboring) from 2.35±0.109 to 4.1±0.180. However, the control group did not show any significant improvement after 15 weeks of the program. This study determined that the Horticulture Job Skill course based on the employment practice model has an effect on improving the individual performance of vocational rehabilitation for university students with disabilities. Finally, horticulture education-based on the employment practice model will contribute to vocational rehabilitation for university student with disabilities.

A Study on the Relative Weights for the Development of University Library Performance Indicator Model (대학도서관 성과지표 모형 개발을 위한 상대적 가중치 연구)

  • Kim, Jeong-Taek;Hahn, Bock-Hee
    • Journal of Korean Library and Information Science Society
    • /
    • v.39 no.4
    • /
    • pp.71-96
    • /
    • 2008
  • Recently, some universities and university libraries have implemented performance management system as a part of managerial innovation, and they have either implemented or are considering implementing BSC. Thus there are needs to develop performance indicator, which is a tool measuring performance of university libraries, based on BSC, and to assess the developed performance indicator's relative weights to analyze which indicators are essential to fulfill and improve the university library's mission. The performance indicators are also affected by the characteristics and perspectives of the people who develop them during the development process. Therefore, it is necessary to analyze the differences among the professional groups in relative weighting of the performance indicator. The purposes of this study are to derive a university library performance indicator model based on BSC, to analyze the importance of each evaluation factor of the derived performance indicator model, and to analyze the differences among the professional groups in relative weighting of the performance indicator model.

  • PDF

Empirical Validation of Critical Success Factors on Organizational Performance in Korean Internet Venture (한국 인터넷 벤처기업의 주요 성공요인이 조직성과에 미치는 영향에 관한 실증적 연구)

  • 김정욱;박정수
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.123-152
    • /
    • 2002
  • This study establishes key success Predictors of internet venture enterprises in Korea. The five factors are derived from the relevant literature and clarified the concept of entrepreneurship, industrial level, enterprise strategy, organizational capability, and resource procurement by distinguishing between its components and determinants. Organizational performance indicators were derived from the previous studies classifying by financial performance indicator and non-financial performance indicator using by recent evaluation method as BSC (Balanced Scorecard). We then examine the impact of critical success factors on the internet venture performance. Hypotheses on five factors of internet venture were tested for 103 organizations. Results indicate that critical success factors may serve as key predictors. Organizational strategy and resource capability was found to be positively influenced on both financial performance indicator and non-financial performance indicator while entrepreneurship, industrial level and organizational capability positively affected only non-financial performance indicator.

Performance Indicator and Threshold Value of National Highway Jointed Concrete Pavements (일반국도 줄눈 콘크리트 포장의 성능인자와 임계한도)

  • Yeo, Hyun Dong;Seo, Youngguk;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.279-288
    • /
    • 2010
  • Recently, researches on the performance warranty contracting has been going on to improve construction quality in road pavement area. The performance warranty contracting gives construction companies opportunity to select materials and methods freely while asks them to maintain a certain level of performance during a given period. To introduce the performance warranty contracting in Korea, lots of research results on performance indicator and threshold value of asphalt pavement have been made to be included in the warranty specification. However, research effort on the performance indicator and threshold value of concrete pavement which is commonly constructed in expressway and national highway has not been enough. In this study, the warranty duration, performance indicator, and threshold value of the concrete pavement were investigated by reviewing literatures on cases of the performance warranty contracting in European countries and states of the US. Major distresses influencing the performance of jointed concrete pavement were investigated and analyzed to be compared to the warranty duration, performance indicator, and threshold value of foreign countries.

DEVELOPMENT OF STATE-LEVEL APPRAISAL INDICATORS OF SUSTAINABLE CONSTRUCTION IN TAIWAN

  • Rong-Yau Huang;Wei-Ting Hsu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.292-298
    • /
    • 2011
  • In this study we examine Taiwan's overall performance in accordance with sustainable construction by developing an appraisal indicator framework. The framework consists of five layers, from bottom to top: the indicator; the indicator category; the core cluster; the theme; and the overall performance. The procedure for the development of a sustainable construction indicator system is outlined. Finally, a framework consists of 3 themes, 10 core clusters, and 33 indicator categories are established. Following the established framework, 67 proper indicators are selected for each category in the framework, and data of the 53 indicators are collected respectively from a nation's statistical databank in Taiwan. Sustainable construction index aggregated step-by-step from the indicators, the indicator categories, the core clusters and the themes is computed to assess Taiwan's progress in sustainable construction. The preliminary results and the discussion are reported.

  • PDF

A Case Study on Vocational Education & Training for the Youth Employment Enhancement : Focused on Analysis of Performance Indicator in Youth Employment Academy (청년층 고용증진을 위한 직업능력개발 사례연구 : 청년취업아카데미사업의 성과지표 분석을 중심으로)

  • Kim, Kug Weon;Ghang, Bong-Jun;Lee, Woo-Young
    • Journal of Practical Engineering Education
    • /
    • v.5 no.2
    • /
    • pp.123-127
    • /
    • 2013
  • Youth employment academy program focuses on resolving the job mismatch of youth unemployment through industry oriented human resource development for which company oriented capacity building program for graduate-to-be and graduate is supported. One of the major characteristics of this program is to use the M-to-M model with common skills for companies of same type of business. The operation organization in youth employment academy is supposed to be evaluated by the final employment rate after 1 year and 6 months since start of the program. So performance indicator for the operation organization was developed which means a kind of mid-term evaluation. In this research, the validity of the performance indicator is discussed. The correlations between the performance indicator and the performance evaluation, between the performance evaluation and the final employment rate, and between the performance indicator and the final employment rate are analyzed.

Development of Competency and Behavioral Indicator of an Administrator in Long-term Care Facility (노인요양시설 관리자의 역량 및 행동지표 개발)

  • Kim, Ji-Soo
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.14 no.4
    • /
    • pp.477-487
    • /
    • 2008
  • Purpose: The purpose of this study is to develop the competencies of the administrator and the behavioral indicators, and with those as the foundation it is to measure the importance and the performance. Method: On the basis of literature review, the researcher made a preliminary competency and the behavioral indicator for the administrator. Developed competency and behavioral indicator went through the content validity using CVI. Finally, 20 different competencies and 87 behavioral indicators of the administrators in long-term care facility helped measuring the importance of the present administrator's competency and the performance. Results: The competencies are Achievement Orientation, Initiative, Information Seeking, Interpersonal Understanding, Customer Service Orientation, Marketing, Influence, Organizational Awareness, Relationship Building, Staff Development, Assertiveness, Teamwork and Cooperation, Leadership, Analytical Thinking, Conceptual Thinking, Managerial Expertise, Self Control, Self Confidence, Flexibility and Organizational Commitment. For the contents, 87 behavioral indicators are included. The importance and the performance were confirmed by Importance Performance Analysis. The importance of each behavioral indicator in each field and the performance were confirmed with the mean and the standard deviation. Conclusion: The competencies and behavioral indicators of an administrator which were developed by this study are considered that they can be used as the effective guides in the practical field and can also be used as basic materials for developing educational program.

  • PDF

A FEASIBILITY STUDY ON THE ADVANCED PERFORMANCE INDICATOR CONCEPT FOR IMPROVING KINS SAFETY PERFORMANCE INDICATORS (SPI)

  • Lee, Yong-Suk;Cho, Nam-Chul;Chung, Dae-Wook
    • Nuclear Engineering and Technology
    • /
    • v.43 no.2
    • /
    • pp.105-132
    • /
    • 2011
  • The concept of improved performance indicators (PIs) for use in the KINS Safety Performance Indicator (SPI) program for reactor safety area is proposed in this paper. To achieve this, the recently developed PIs from the USNRC that use risk information were investigated, and a feasibility study for the application of these PIs in Korean NPPs was performed. The investigated PIs are Baseline Risk Index for Initiating Events (BRIIE), Unplanned Scrams with Complications (USwC), and Mitigating System Performance Index (MSPI). Moreover, the thresholds of the existing safety performance indicators of KINS were evaluated in consideration of the risk and regulatory response to different levels of licensee performance in the graded inspection program.

A Study on Developing BSC-based Public Library Performance Indicator Model (BSC 기반 공공도서관 성과지표 모형 개발에 관한 연구)

  • Kim, Jeong-Taek
    • Journal of Korean Library and Information Science Society
    • /
    • v.40 no.1
    • /
    • pp.47-71
    • /
    • 2009
  • The mission of public library is to contribute to local society's growth and improve local residents' quality of life by satisfying local residents' desire on information use, cultural activities, lifelong education, etc, and providing more convenient and equal access. This study is a research that deducted BSC-based public library performance indicator model composed of 12 critical success factors, 36 key performance indicators under four perspectives of learning and growth perspective, internal process perspective, resources perspective, and user perspective, estimated relative weights of deducted the performance indicator model on librarians of public libraries to analyze what performance indicator is important for accomplishing public library's mission and promoting performance.

  • PDF

A Study on the Development of the Advanced Energy Performance Indicator for the Manufacturing Companies (제조업체의 에너지성과지표 고도화에 관한 연구)

  • Rho, Kyung-Wan;Song, Myung-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.5
    • /
    • pp.31-38
    • /
    • 2015
  • It is important to improve the energy performance in the industrial sector, and therefore most of the manufacturing companies need the energy performance indicators to identify the target and to verify the energy savings. However, the conventional energy performance indicators such as the total energy consumption and the energy intensity are not proper to use. The reason is that they do not consider adequate relevant variables including productions in the boundary of the manufacturing companies. Therefore, the study provides the advanced energy performance indicator using by the linear regression model according to each energy source to manage the target and to verify the energy performance properly.