• Title/Summary/Keyword: peak power

Search Result 2,626, Processing Time 0.03 seconds

Peak Power Control for Improvement of Stability in Multi-core System (멀티코어 시스템의 안정성 향상을 위한 피크파워 제어 알고리즘)

  • Park, Sung-Hwan;Kim, Jae-Hwan;Ahn, Byung-Gyu;Jung, Il-Jong;Lee, Seok-Hee;Chong, Jong-Wha
    • Proceedings of the IEEK Conference
    • /
    • 2008.06a
    • /
    • pp.747-748
    • /
    • 2008
  • In this paper, we propose a new algorithm for task scheduling consisting of subtask partitioning and subtask priority scheduling steps in order to keep the peak power under the system specification. The subtask partitioning stepis performed to minimize the idle operation time for processors by dividing a task into multiple subtasks using the least square method developed with power consumption pattern of tasks. In the subtask priority scheduling step, a priority is assigned to a subtask based on the power requirement and the power variation of subtask so that the peak power violation can be minimized and the task can be completed within the execution time deadline.

  • PDF

Development of a Novel Charging Algorithm for On-board ESS in DC Train through Weight Modification

  • Jung, Byungdoo;Kim, Hyun;Kang, Heechan;Lee, Hansang
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1795-1804
    • /
    • 2014
  • Owing to the reduction in the peak power of a DC railway subsystem, many studies on energy storage system (ESS) applications have received attention. Each application focuses on improving the efficiency and addressing regulation issues by utilizing the huge regenerative energy generated by braking-phase vehicles. The ESS applications are widely divided into installation on a vehicle or in a substation, depending on the target system characteristics. As the main purpose of the ESS application is to reduce the peak power of starting-phase vehicles, an optimized ESS utilization can be achieved by the operating at the highest peak power section. However, the weight of an entire vehicle, including those of the passengers, continuously changes during operation; thus, considering the total power consumption and the discharging point is difficult. As a contribution to the various storage device algorithms, this study deals with ESS on board vehicles and introduces an ESS operating plan for peak-power reduction by investigating the weight of a train on a real-time basis. This process is performed using a train-performance simulator, and the simulation accuracy can be increased because the weight in each phase can be adopted in the simulation.

The Study on the Field test and Operational Method of a Direct Load Control System for Air conditioner (에어컨부하 직접제어시스템 실증시험 및 운용방안에 관한 연구)

  • Gang, Won-Gu;Kim, Chung-Hwan;Kim, Myong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2825-2827
    • /
    • 2000
  • In electric power industry. load balance has been one of the most fundamental and important management goals. Therefore. the strategy to achieve high quality load management now includes load balance besides the stabilization of electricity supply and quality management of electricity. Amongst many techniques of load management. direct load management has been actively studied and utilized to increase power facility and peak load suppression. Higher peak load situation is appeared during summer than during winter in Korea. and approximately 20% of the peak load is due to the load for air-conditioning. To cope with this peak load problem during summer KEPCO is performing a research project to develop a system to remotely control air-conditioning load using wireless communication. Currently, applicable facilities are limited to small-scale air-conditioning facility that has less than 2KW power capacity. This paper described the 1st year of efforts made in the study.

  • PDF

Microgrid operating method in realtime pricing (실시간 전기요금제에서 마이크로그리드의 운용 방법)

  • Jyung, Tae-Young;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.

An New Load Control Algorithms based on Power Consumption (전력사용량 기반의 새로운 부하제어 알고리즘)

  • Kim, Jeong-Uk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1658-1662
    • /
    • 2010
  • This paper presents an advanced energy saving algorithm in building. It is important to aggregate a various demand side resource which is surely controllable at the peak power time to reduce the energy cost. Previous demand side algorithm appropriate for building is based on peak power. In this paper, we develop the new energy saving algorithm to reduce the quantity of power consumption. The simulation results show that the proposed tem is very effective.

A study of residential solar airconditioning system using bidirectional PWM converter (양방향성 PWM컨버터를 이용한 가정용 태양광 에어컨 시스템에 관한 연구)

  • 유권종;송진수;황인호;김홍성;고재석;최규하;김한성
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.3
    • /
    • pp.358-364
    • /
    • 1996
  • Recently, much power demand from domestic power consumer is weakening the allowable power reserve margin in summer, especially at midday for one day due to a steep increase of air cooling loads such as air conditioner. Therefore solar airconditioning system can'be considered as one of the best remedies to meet the increase of peak power. Generally in solar air conditioning system, the diode rectifier is used to build up DC link voltage from AC source. The diode rectifier is simple and cheap but it brings out the problems of low power factor and plentiful harmonics at the AC source. Also It can derate the utilization rate of solar energy because the reverse of power flow cannot be made. Hence, in this paper to overcome the peak power problem in summer and to endure good AC input characteristics, solar air conditioning system using the PWM converter is proposed. As results, obtained are the characteristics of the PWM converter such as low distorted current waveform, high power factor and bidirectional power control. And also the stability of proposed system is verified by examining the dynamics of step load change and power reversal testing. (author). refs., figs., tabs.

  • PDF

Correlation between Uni-standing Balance Ability, Jumping Ability, and Anaerobic Lower Extremity Muscle Power of High School Taekwondo Players

  • Jeong, Mo-beom
    • Physical Therapy Rehabilitation Science
    • /
    • v.10 no.4
    • /
    • pp.457-462
    • /
    • 2021
  • Objective: This study analyzed the correlation between uni-standing balance ability, jumping ability, and anaerobic lower extremity power of high school Taekwondo players. Design: Cross-sectional study Methods: Two high schools recruited 36 taekwondo players, but 5 were dropped due to personal circumstances and preparations for the tournament, so the number was counted as 31. In order to test uni-standing balance ability, the Romberg test was performed using Biorescue to measure the sway area. In order to test jumping ability, standing long jump and standing highjump were measured. For anaerobic lower extremity muscle power test, the peak power and average power were measured through 30-second pedaling using a Wingate system bicycle. Results: Participants did not show any correlation with other measures in the uni-standing balance ability test (p>0.05). Looking at the correlation in the standing long jump, standing high jump (r=0.892, p<0.05), anaerobic peak power (r=0.698, p<0.05), anaerobic average leg power (r=0.662, p<0.05) showed a positive correlation. Looking at the correlations in the standing high jump, anaerobic peak power (r=0.663, p<0.05), anaerobic average power (r=0.697, p<0.05) showed a positive correlation. Looking at the correlation in the anaerobic peak power, average power (r=0.785, p<0.05) showed a positive correlation. Conclusions: This study shows that balance ability and anaerobic leg strength are independent of each other. The results of this study can be used as basic data for the training plan of high school taekwondo players in the future.

Study on ESS Operation Plan for Energy Reduction in Industrial Customer (산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구)

  • Yu, Soon-Jeong;Lee, An-gi;Baek, Jeong-Seon;Cha, Dae-Joong;KIm, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.9
    • /
    • pp.1152-1158
    • /
    • 2018
  • In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.

Precise Analytical Solution for the Peak Gain of LLC Resonant Converters

  • Hong, Sung-Soo;Cho, Sang-Ho;Roh, Chung-Wook;Han, Sang-Kyoo
    • Journal of Power Electronics
    • /
    • v.10 no.6
    • /
    • pp.680-685
    • /
    • 2010
  • Although LLC resonant converters have the advantages of a wide operation range and high efficiency, the lack of an analytical solution for the peak gain makes it difficult to optimize the resonant tank design, when considering not only the normal condition but also the holdup time requirement. In this paper, based on a mathematical analysis of a LLC resonant converter at the peak gain point, an analytical solution for the peak gain has been developed. By using the developed analytical solution, the peak gain with given resonant tank parameters can be obtained. To confirm the validity of the developed analytical solution, simulations and experimental results are compared.

On the Capacities of Spectrum-Sharing Systems with Transmit Diversity

  • Asaduzzaman, Asaduzzaman;Kong, Hyung-Yun
    • Journal of electromagnetic engineering and science
    • /
    • v.10 no.3
    • /
    • pp.99-103
    • /
    • 2010
  • Motivated by recent works on spectrum-sharing systems, this paper investigates the effects of transmit diversity on the peak interference power limited cognitive radio(CR) networks. In particular, we derive the ergodic and outage capacities of a spectrum-sharing system with multiple transmit-antennas. To derive the capacities, peak interference power constraint is imposed to protect the primary receiver. In a CR transmitter and receiver pair with multiple antennas at the transmitter side, the allowable transmit power is distributed over the transmit-antennas to achieve transmit diversity at the receiver. We investigate the effect of this power distribution when a peak interference power constraint is imposed to protect the primary receiver. We show that the transmit diversity does not improve the ergodic capacity compared to the single-antenna system. On the other hand, the transmit diversity significantly improves the outage capacity. For example, two transmit-antennas improve the outage capacity 10 times compared to the single-antenna with a 0 dB interference constraint.