• 제목/요약/키워드: pavement rehabilitation

검색결과 74건 처리시간 0.026초

국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구 (A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway)

  • 손현장;권수안;이재준;백철민;임재규;신현진
    • 한국도로학회논문집
    • /
    • 제15권2호
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

아스팔트 콘크리트 포장의 최소단면 보수공법 개발을 위한 기초연구 (A Preliminary Study on Effective Rehabilitation Technique of Asphalt Concrete Pavement)

  • 조명환;김낙석;조규태;진정훈
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.475-478
    • /
    • 2007
  • The major distresses in asphalt concrete pavement are rutting and fatigue cracking. Once the distresses are observed on pavement surface, an appropriate rehabilitation method should be found. Usually, asphalt patching or overlay methods are used to improve the pavement performance. The research presents the fundamental study on effective longitudinal rehabilitation methods for asphalt concrete pavements. The rehabilitation method will be applied to rutting that is occurred asphalt Pavement surface course and longitudinal cracking or fatigue cracking with light to moderate distress levels.

  • PDF

도심지 아스팔트 포장의 유지보수공법 의사결정 절차 개선 (Improvement of a Decision Tree for The Rehabilitation of Asphalt Pavement in City Road)

  • 박창규;김원재;김태우;이진욱;백종은;이현종
    • 한국도로학회논문집
    • /
    • 제20권3호
    • /
    • pp.27-37
    • /
    • 2018
  • PURPOSES : The objective of this study is to develop a pavement rehabilitation decision tree considering current pavement condition by evaluating severity and distress types such as roughness, cracking and rutting. METHODS : To improve the proposed overall rehabilitation decision tree, current decision tree from Korea and decision trees from other countries were summarized and investigated. The problem when applying the current rehabilitation method obtained from the decision tree applied in Seoul was further analyzed. It was found that the current decision trees do not consider different distress characteristics such as crack type, road types and functions. Because of this, different distress values for IRI, crack rate and plastic deformation was added to the proposed decision tree to properly recommend appropriate pavement rehabilitation. Utilizing the 2017 Seoul pavement management system data and considering all factors as discussed, the proposed overall decision tree was revised and improved. RESULTS :In this study, the type of crack was included to the decision tree. Meanwhile current design thickness and special asphalt mixture were studied and improved to be applied on different pavement condition. In addition, the improved decision tree was incorporated with the Seoul asphalt overlay design program. In the case of Seoul's rehabilitation budget, rehabilitation budget can be optimized if a 25mm milling and overlay thickness is used. CONCLUSIONS:A practical and theoretical evaluation tool in pavement rehabilitation design was presented and proposed for Seoul City.

고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구 (Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements)

  • 서영찬;박지원;김찬우
    • 한국도로학회논문집
    • /
    • 제18권3호
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

순열알고리즘을 이용한 도로포장의 유지보수 (Pavement Maintenance System Through using the Permutation Algorithm)

  • 김장락;이상염;문성호
    • 한국도로학회논문집
    • /
    • 제16권5호
    • /
    • pp.67-72
    • /
    • 2014
  • PURPOSES : This study focuses on conducting pavement rehabilitation for more deteriorated roads given a limited government budget. METHODS : Therefore, we apply a optimization programming model of the permutation algorithm used for rehabilitating more deteriorated pavement areas, which is subjected to the limited budget. RESULTS : The permutation algorithm was evaluated in terms of determining the maximized rehabilitation of deteriorated pavement areas, using the newly developed performance models such as fatigue cracking, rutting, international roughness index(IRI) through the surveying data from 2006 to 2012. When compared with a traditional model of the so-called worst-first sequence(WFS) method, the permutation algorithm worked better than the WFS method, resulting in covering more deteriorated pavement areas given the limited government budget. CONCLUSIONS : Through a case study, it could be concluded that the permutation algorithm provides more reliable results in terms of rehabilitating more deteriorated pavement areas given the limited budget.

국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구 (Development of Rehabilitation Criteria of National Highway Pavement)

  • 김다혜;권수안;서영찬;임광수
    • 한국도로학회논문집
    • /
    • 제11권2호
    • /
    • pp.37-44
    • /
    • 2009
  • 현재 국도 PMS(Favement Management System)에서 적용하고 있는 보수공법결정체계는 소성변형과 균열의 기준치값에 대한 설정 근거가 명확하지 않다. 본 연구에서는 일반국도에서 아스팔트 콘크리트 포장의 보수 시 보수공법결정기준에 대한 근거를 제시하기 위한 것이다. 이를 위해 전국 일반국도 아스팔트 포장 구간을 대표할 수 있는 대표 구간을 선정하고, 포장전문가 패널(panel)을 선정하여 선정된 구간을 대상으로 패널이 대표구간을 평가하여 보수공법을 제안하였다. 포장전문가 패널이 대표구간을 평가한 결과를 분석하여 다음과 같이 보수공법 결정 기준의 근거를 마련하였다. 균열의 경우 절삭 덧씌우기를 요구하는 균열율은 35%, 덧씌우기 이상의 기준으로서 균열율 20%를 제안하였다. 소성변형의 경우 절삭 덧씌우기를 필요로 하는 소성변형 값은 13mm, 덧씌우기 이상을 요구하는 소성변형의 기준으로서 10mm를 사용할 것을 제안하였다.

  • PDF

FWD 처짐치에 의한 포장층 탄성계수 역산 및 해석기법 (Back calculation and solution Technique of E-modulus by FWD′s deflection data in Pavement)

  • 위성동
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.188-200
    • /
    • 2002
  • In this study, a pavement evaluation method is introduced by a case study of the measurement data obtained in Incheon International Airport. Based on the results obtained by both visual inspection and automobile inspection equipments, the pavement surface condition is evaluated and used for maintenance and rehabilitation strategy for pavement. In addition, the special attention was given to the back calculation and solution technique of E-modulus by FWD's deflection data in Pavement.

  • PDF

Application of Markov Chains and Monte Carlo Simulations for Pavement Construction Engineering

  • Nega, Ainalem;Gedafa, Daba
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1043-1050
    • /
    • 2022
  • Markov chains and Monte Carlo Simulation were applied to account for the probabilistic nature of pavement deterioration over time using data collected in the field. The primary purpose of this study was to evaluate pavement network performance of Western Australia (WA) by applying the existing pavement management tools relevant to WA road construction networks. Two approaches were used to analyze the pavement networks: evaluating current pavement performance data to assess WA State Road networks and predicting the future states using past and current pavement data. The Markov chains process and Monte Carlo Simulation methods were used to predicting future conditions. The results indicated that Markov chains and Monte Carlo Simulation prediction models perform well compared to pavement performance data from the last four decades. The results also revealed the impact of design, traffic demand, and climate and construction standards on urban pavement performance. This study recommends an appropriate and effective pavement engineering management system for proper pavement design and analysis, preliminary planning, future pavement maintenance and rehabilitation, service life, and sustainable pavement construction functionality.

  • PDF

콘크리트 포장상태 평가지수의 개발에 관한 연구 (A Study on Development of the Concrete Pavement Condition Index)

  • 권수안;김남호;서영찬
    • 한국도로학회논문집
    • /
    • 제2권3호
    • /
    • pp.145-153
    • /
    • 2000
  • 포장의 합리적 유지관리를 위해서는 기본적으로 포장의 상태를 객관적으로 평가하고, 평가한 자료를 이용하여 경제성 분석을 실시함으로써 최적의 보수공법 및 보수우선순위를 결정해야 한다. 전체적인 포장 상태를 객관적으로 평가하기 위해서는 포장상태 평가지수와 같은 단일화된 평가 기준이 필요하다. 본 연구에서는 우리나라 고속도로 콘크리트 포장에 적합한 포장상태 평가지수를 개발하기 위하여 현장 상세조사 및 포장평가위원회의 평가를 실시하고, 그 결과의 회귀분석을 통해 포장평가지수를 개발하였다. 또한 개발된 포장평가지수를 이용하여 포장유지관리에서 이용되기 위한 보수공법그룹을 제시하였다. 개발된 포장평가지수의 상관계수는 0.68이었으며, 콘크리트 포장평가지수에 사용된 독립변수들은 종단평탄성, 균열, 패칭 등이었다.

  • PDF

현장가열재생 아스팔트 포장의 현재 미국 내의 적용 현황 연구: 문헌조사 (Investigation of Current Practice on Hot In Place Recycling (HIR) in USA: Literature Review)

  • 임정혁;조성환;황성도
    • 한국도로학회논문집
    • /
    • 제16권2호
    • /
    • pp.73-89
    • /
    • 2014
  • PURPOSES : The objective of this study is to investigate the current state of the practice, examining the steps in the process recommended by various agencies and the Asphalt Recycling and Reclaiming Association (ARRA)-namely mix design, structural design, structural capacity evaluation, and material characterization-in order to better understand the implications of hot in-place recycling (HIR). METHODS : In addition, the current practice of state departments of transportation (DOTs) is here reviewed with the purpose of learning from successful past experiences so as to forestall any difficulties that may emerge under similar circumstances. Also, HIR benefits, including reduced costs, improved construction processes, and environmental friendliness are presented, as well as advantages and disadvantages of HIR application. RESULTS : Most of the United States highway system is now deteriorating so that rehabilitation or reconstruction techniques are required for the most distressed roads, taking into account ways to increase the effectiveness of existing budgets. Several options are available in rehabilitating distressed roads, and the choice among these depends on many factors, including pavement distress condition, funding, and design life. Among these techniques, Hot In-Place Recycling (HIR) has emerged as a cost-effective treatment for deteriorated pavements, and has been proven an effective long-term strategy for pavement rehabilitation.