• Title/Summary/Keyword: parts supply

Search Result 575, Processing Time 0.048 seconds

Reaction Characteristics of LPG Fuel and Rubber Parts of Fuel Supply System in Liquid Phase LPG Injection (LPLi) System (LPG액상분사식(LPLi) 엔진에서 연료와 연료공급계통 고무류 부품사이의 반응성 연구)

  • Kim, Chang-Up;Park, Cheol-Woong;Kang, Kern-Yong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.4
    • /
    • pp.272-277
    • /
    • 2009
  • The liquid phase LPG injection (LPLi) system (the 3rd generation technology) has been considered as one of the most promising fuel supply systems for LPG vehicles. To investigate the reaction characteristics of LPG with rubber parts in LPLi system, various rubbers were tested. The results showed that the amount of residue from the cover rubber of a fuel pump was increased about 10 times after testing. Furthermore, the amount of sulfur and nitrogen species which are considered as main sources of deposit formation in LPLi fuel injectors were also found to be higher than those in original LPG fuel. In addition, these residues made the core parts of LPLi injector such as needle and nozzle, partially worn, which eventually causes leakage in LPLi injectors.

A Study on the Signal Analysis of Loose Parts Monitoring System (LPMS 신호분석 연구)

  • Lee, Sang-Guk
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.839-841
    • /
    • 2014
  • The Nuclear Steam Supply System(NSSS) is designed to provide an integrated approach that includes areas of monitoring relevant to the integrity of the NSSS. LPMS is designed to function as an alarm system by providing sensor channel alarms for the associated subsystems. LPMS is equipped to provide analysis tools for new alarm events, historical events and for historical periodically stored channel data (e.g. waveforms) for most channels. This paper is intended to introduce the diagnosis principle and abnormal symptom of loose parts monitoring system as a monitoring tool in Nuclear Steam Supply System. And also, we are going to introduce signal analysis program in order to perform the actual diagnosis in power plants.

  • PDF

A batch scheduling scheme for the workcenters that supply parts to mixed-model assembly lines (혼류 조립 라인에 batch 단위로 부품을 공급하는 단위 작업장의 생산계획 수립)

  • 백종관;백준걸;김성식
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.369-372
    • /
    • 1996
  • The factory under this study consists of mixed-model assembly lines and workcenters which provide parts to the main lines. Parts produced by the workcenter have different specifications for different product models. The workcenters fabricate parts in batches, and they are divided into two types. A type 1 center supplies parts only to the main line that is designated to the center while type 2 center provides parts to all the main lines. The purpose of this study is to develop a scheduling scheme for the workcenter, and the main objective of the schedules is to provide parts for the main lines without delay. The facts that make the scheduling challengeable are that 1) the different models existing together on a main line request different parts, 2) the spaces for part inventories are limited and 3) set up times are sequence dependent and long in some cases. This study presents developed scheduling schemes for the type 1 center and explains the scheduling and control structure used.

  • PDF

Supply Route Analysis and Performance Evaluation of Dental High-Speed Air Turbine Handpiece (치과용 고속 에어터빈 핸드피스의 공급관로 분석 및 성능평가)

  • Han, Myung-Chul;Kim, Jung-Kwan;Choi, Myoung-Wook
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.1
    • /
    • pp.80-88
    • /
    • 2011
  • The dental high-speed air turbine handpiece is one of the most popular devices that have been widely used as the main means of cutting tooth structure and restorative material in dentistry. In consideration of usage and marketability of the dental handpiece, it is obviously worthy of investigating it. The goal of this paper is to establish the relationship between the air turbine speed and the supply route inside the handpiece. To do this, the Computational Fluid Dynamics(CFD) tool, Fine$^{TM}$/Turbo is used and the optimal supply route position is suggested from the simulation results. In addition, as an attempt for domestic product, the reverse engineering process of a high speed dental handpiece by 3D X-Ray CT equipment and wire cutting is presented for the Mark II model in NSK. In doing so, the 3D modeling of the handpiece parts is carried out with CATIA V5, and the interference between parts is examined. Finally, the result of performance test for the prototype produced in this research is presented.

A Study on The Performance of a Heat Recovery Ventilator According to the Properties of Spacers (스페이서의 재질변화에 따른 전열교환기 성능변화에 관한 연구)

  • Lim, Tae-Kun;Jeon, Byung-Heon;Kim, Jong-Won;Jung, Sung-Hak;Lee, Seung-Kap;Ahn, Young-Chull
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.3
    • /
    • pp.224-229
    • /
    • 2012
  • The importance of ventilation system is being emphasized by interest of indoor air quality. Especially, heat recovery ventilation system has attracted attention as most effective ventilation plan. Because it can reduce hazardous construction materials, indoor air pollutions, and also can reduce air conditioning energy cost. In heat recovery ventilator, the element core is the most important part. The element core is composed of liner and spacer. And liner and spacer are stacked alternately. On the Liner, heat and humidity transfer are made between supply and exhaust air. And spacer plays a role as a tunnel of exhaust and supply. In this study, we investigated and analyzed the efficiency of a heat recovery ventilator, when the spacer's properties are changed. As a result, difference spacer's properties affect an efficiency of heat recovery ventilator.

Hydraulic Adequacy of Connection Pipes in Water Supply Systems for Contingencies (비상시 용수공급을 위한 상수도 연계관로의 수리적 적정성 평가)

  • Han, Wanseob;Jung, Kwansoo;Kim, Juhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.679-687
    • /
    • 2013
  • Although stable and safe drinking water supply to the customers is a basic function of multi-regional water supply systems in Korea, most systems have their vulnerabilities in emergency time due to the branch-type. Application of connections from the other water supply system can provide a solutions for these tentative problems. This paper describes reduction planning of water supply accidents that can minimize a service interruption to customers in multi-regional water supply system by connecting pipe lines between local water supply systems in Mokpo city areas. The result of this study shows that Juam dam multi-regional water supply systems can cover all of the water shortage in southern parts of Jeonnam multi-regional water supply systems by transmitting water through connected pipes between local networks. This can be effective to supply water interactively in various contingencies, when a pipe line accident occurs in southern area of Jeonnam multi-regional water supply systems. On the contrary, southern area of Jeonnam multi-regional water supply systems can cover 99.5 %($62,500m^3/day$) of the water shortage of Juam dam multi-regional water supply systems when service interruptions caused by various pipe accidents occur in the system.

Analysis of Korean Import and Export in the Semiconductor Industry: A Global Supply Chain Perspective

  • Shin, Soo-Yong;Shin, Sung-Ho
    • Journal of Korea Trade
    • /
    • v.25 no.6
    • /
    • pp.78-104
    • /
    • 2021
  • Purpose - Semiconductors are a significant export item for Korea that is expected to continue to contribute significantly to the Korean economy in the future. Thus, the semiconductor industry is a critical component in the 4th Industrial Revolution and is expected to continue growing as the non-face-to-face economy expands as a result of the COVID-19 pandemic. In this context, this paper aims to empirically investigate how semiconductors are imported and exported in Korea from a global supply chain perspective by analysing import and export data at the micro-level. Design/methodology - This study conducts a multifaceted analysis of the global supply chain for semiconductors and related equipment in Korea by examining semiconductor imports and exports by semiconductor type, year, target country, mode of transportation, airport/port, and domestic region, using import/export micro-data. The visualisation, flow analysis, and Bayesian Network methodologies were used to compensate for the limitations of each method. Findings - Korea is a major exporter of semiconductor memory and has the world's highest competitiveness but is relatively weak in the field of system semiconductors. The trade deficit in 'semiconductor equipment and parts' is clearly growing. As a result, continued investment in 'system semiconductors' and 'semiconductor equipment and parts' technology development is necessary to boost exports and ensure a stable supply chain. Originality/value - Few papers on semiconductor trade in Korea have been published from the perspective of the global supply chain or value chain. This study contributes to the literature in this area by focusing on import and export data for the global supply chain of the Korean semiconductor industry using a variety of approaches. It is our hope that the insights gained from this study will aid in the advancement of SCM research.

Development of Lifter for ELV Disassembly (폐자동차 해체용 Lifter의 개발)

  • 이현용;송준엽;강재훈
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.856-859
    • /
    • 2003
  • Currently, the domestic recycle rate of ELV parts is about 3%. The reason of the row rate of it is due to that consumer can not obtain the needed ELV parts. In order to supply the good parts to consumer. the equipment of the ELV disassembly is required. This research is to developed the lifter for ELV disassembly by considering the references such as the disassembly tool and equipment of the domestic and foreign ELV disassembly company.

  • PDF

Study on Operational Plan of Hot Gas Parts for Cost Reduction of Gas Turbine with Cases Oriented (가스터빈의 운전유지비 절감을 위한 고온부품의 운영방안에 관한 연구 - 사례중심으로 -)

  • Yu, Won-Ju;Cho, Chi-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.93-101
    • /
    • 2009
  • The use of the gas turbine for power supply is increasing recently. Accordingly, the operation and maintenance cost of the gas turbine is gradually increasing and the various efforts to cut the cost are needed. For an operation and maintenance cost saving of the gas turbine, reductions of the new purchasing charge and the reproduction repair cost of the hot gas parts are required through more effective operation and life management methods for the hot gas parts. The hot gas parts are the main parts of the gas turbine and they are replaced with the periodic. In this research, efficient operation and life management methods for the hot gas parts were presented with the cases. The methods were analyzed and verified based on real data and the cases for improving a lifetime were utilized in the field.

A Study on Budget Decision Model for Initial Provisioning Spare Parts (초기보급 예비부품을 위한 예산결정 모델연구)

  • Hwang Heung-Seok
    • Journal of the military operations research society of Korea
    • /
    • v.16 no.2
    • /
    • pp.75-82
    • /
    • 1990
  • When the new equipment or weapon system is introduced to the operating unit its repair facilities and spare parts supply channels are not regularly generated. therefore, its required spare parts are initially supplied at the same time when the main equipment is deployed. For these circumstances, we are faced with the following problems : the first one is to decide the budget amounts to acquire the spare parts, the second is to choose the amounts of initial provisioning spare parts, and the third one is how to allocate the given budget for the initial provisioning spare parts. This paper emphasizes on determining the budget amounts, but also suggests the spare parts allocating methods.

  • PDF