• Title/Summary/Keyword: paper factory

Search Result 965, Processing Time 0.03 seconds

An automaticity indicator computation and a factory automation procedure (자동화 지표 계산 및 공장자동화 순서 결정을 위한 방법)

  • Cho, Hyun-Bo;Jeong, Ki-Yong;Lee, In-Bom;Joo, Jae-Koo;Lee, Joo-Kang;Jeon, Jong-Hag
    • IE interfaces
    • /
    • v.10 no.1
    • /
    • pp.209-222
    • /
    • 1997
  • The paper provides a methodology to obtain the automaticity indicator of a factory and the sequence of enabling technologies of factory automation. The automaticity indicator is the measure of the current automation status of a factory and can be used as a crucial criteria for the future automation schedule and investment. Although most industries have their own computation methods which usually consider the number of workers in the shop floor, this research covers five evaluation items of automation, such as, production facility, material transfer system, inspection and test system, information system, and flexibility. The detailed evaluation models are developed for each item. Automation sequencing prioritizes the enabling technologies of factory automation on the basis of several criteria which consist of two phases. The first phase includes the automation indicator and the second phase includes six sub-criteria such as production rate, quality, number of workers, capital investment, development duration, development difficulty. For this evaluation, AHP(Analytical Hierarchy Process) is introduced to prevent the decision maker's subject intention. As results of the automaticity indicator and automation sequence, the manager can save time and cost in building constructive and transparent automation plans.

  • PDF

DEVELOPMENT OF A VIRTUAL FORGING FACTORY FRAMEWORK

  • Kao Yung-Chou;Sung Wen-Hsu;Huang Wei-Shin
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2003.10b
    • /
    • pp.115-122
    • /
    • 2003
  • This paper presents the development of a virtual forging factory framework. The technologies of virtual reality and relational database had been integrated in the developed framework using Microsoft $Windows^{(R)}$ programming as the main technique so as to emulate a physical forging factory. The developed virtual forging factory consists of forging cells and a forging cell is comprised of forging machine, forging die, and forging operations forming a forging production line. The technology of virtual reality had been successfully adopted in the production simulation of manufacturing such as CNC and robotics. However, the application in virtual forging factory seems to have not been studied yet. Potential application of a virtual forging factory can be beneficial to (1) computer aided instruction, (2) shorten the learning curve of a novice, (3) remote diagnosis and monitoring when remote monitoring and control technology and signal inspection is considered, (4) improve adverse forging environment when remote forging technology is applied, and (5) virtual reality application.

  • PDF

Policy Suggestions on the Smart Factory Based on the Survey Results from Smart Factory Suppliers (스마트공장 공급기업 설문조사를 바탕으로 한 스마트공장 정책 제언)

  • Yoon, Yeong-Ho;Lee, Jin;Lee, Eunbin;Moon, Bo-Myeong;Seo, Ji-Hyung;Lee, Jeongcheol;Chang, Tai-Woo;Sung, Siil
    • Journal of Korean Society for Quality Management
    • /
    • v.48 no.1
    • /
    • pp.1-11
    • /
    • 2020
  • Purpose: This paper treats the survey result from the suppliers of smart factories. Based on the survey results, it is provided suggestions about government policies of the smart factory. Methods: For providing political suggestions, the survey of smart factory is conducted. The survey results are analyzed by the correlation and association methods based on the stratification. Results: The survey results are analyzed for extracting policy-level suggestions. Multiple policy-level suggestions are identified and presented in the conclusion. Conclusion: Six policy-level suggestions are presented for enhancing the management efficiency of suppliers of smart factory.

Method of Equipment Control for Implementing Smart Factory based on IoT (스마트 팩토리 구현을 위한 IoT 기반의 장비 제어 방법)

  • Cho, Kyoung-Woo;Oh, Chang-heon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.803-804
    • /
    • 2016
  • With the advent of Germany's Industry 4.0, research of smart factory to applying the ICT in manufacturing industries is in progress. But the current system controlled equipment using the data declared in the embedded systems. In this paper, we proposed equipment control method to implement smart factory based on IoT. This method is create D/B table of data declared in equipment. and equipment shall call all of control unit parameters. When using the present method, it is possible to efficiently control the number of equipment as less network resource. Also It can operating a factory efficiently.

  • PDF

Study on Minimum Security Requirement Using Risk Priority Number(SFRPN) for Secure Smart Factory (안전한 스마트공장 구축을 위한 위험우선순위(SFRPN) 기반 최소보안요구사항에 관한 연구)

  • Yi, Byung-gueon;Kim, Dong-won;Noh, Bong-nam
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.5
    • /
    • pp.1323-1333
    • /
    • 2016
  • According to spreading of smart devices and development of communication technology, the security issues come to the fore in the modern factory. Especially, the smart facpry should be considered the risk management plan how to identify and evaluate, control the risks. In this paper, we suggest the minimum security requirements applying SFRPN(Smart Factory Risk Priority Number) model to domestic smart factory on the basis of the results inspecting factories.

Development of Domestic Standardization in Smart Factory and Manufacturing Data (국내 스마트공장 및 제조 데이터 표준 개발 동향)

  • Cho, Woong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.16 no.5
    • /
    • pp.783-788
    • /
    • 2021
  • Smart manufacturing is defined as the fully ICT-based manufacturing process which digitized, optimized, and automized the of manufacturing system in smart factory which includes product planning, design, production, quality, stock, procure. In this paper, we introduce the development of domestic standardization of smart factory and manufacturing data which are generated in operation of smart factory. We focus on general standardization of smart factory/ICT-based manufacturing system and data transactions related issues since the range of standardization is too wide. Based on these standardization review, we discuss the several concerns for utilization of manufacturing data.

ASS Design to Collect Manufacturing Data in Smart Factory Environment (스마트 팩토리 환경에서 제조 데이터 수집을 위한 AAS 설계)

  • Jung, Jin-uk;Jin, Kyo-hong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.204-206
    • /
    • 2022
  • Digital twin, which is evaluated as the core of smart factory advancement, is a technology that implements a digital replica in the virtual world with the same properties and functions of assets in the real world. Since the smart factory to which digital twin is applied can support services such as real-time production process monitoring, production process simulation, and predictive maintenance of facilities, it is expected to contribute to reducing production costs and improving productivity. AAS (Asset Administration Shell) is an essential technology for implementing digital twin and supports a method to digitally represent physical assets in real world. In this paper, we design AAS for manufacturing data gathering to be used in real-time CNC (Computer Numerical Control) monitoring system in operation by considering manufacturing facility in smart factory as assets.

  • PDF

Smart Factory's Environment Monitoring System using Bluetooth (블루투스를 이용한 스마트팩토리의 환경 모니터링 시스템)

  • Lee, Hwa-Yeong;Lee, Sung-Jin;Kim, Nam-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.224-226
    • /
    • 2021
  • Recently, in order to increase the efficiency of the product production process, the automation of facilities and devices in the factory is in progress, and a smart factory is being built using ICT and IoT technologies. In order to organically solve many problems occurring in the smart factory, a system for monitoring the wireless communication function between facilities and devices and the manufacturing process environment of the smart factory is required. In this paper, we propose a monitoring system using a Bluetooth module, a temperature/humidity sensor and a fine dust sensor to remotely monitor the process environment of a smart factory. The proposed monitoring system collect Arduino sensor values wirelessly through Bluetooth communication.

  • PDF

A Case Study on the Implementation of Tele-Operation Robot Hand by Learning Factory based Technology Convergence Education (러닝팩토리기반 기술융합교육을 통한 텔리 오퍼레이션 로봇핸드 구현 사례 연구)

  • Hong, Chang-Ho;Lee, Jung-Hoon;Kim, Hyung-O
    • Journal of Practical Engineering Education
    • /
    • v.10 no.2
    • /
    • pp.113-118
    • /
    • 2018
  • The most important thing in vocational education and training is to enhance students' interest and understanding of the whole process of the production site. In this paper, we present a case on the implementation of tele-operation robot hand by learning factory based technology convergence education. It also suggests some points to be taken when applying the learning factory in the future curriculum. In order to implement the tele-operation robot hand, it is necessary to support the compulsory subjects of university level courses in domestic curriculum such as mechanic design, motor control, local communication implementation, sensing and feedback control. The educational research presented in this paper guides the students with the skills they need and understands the skills through self-study and practice, and implements the final products. This study will be useful as a base data when introducing the training process of training factory in the future.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF