• Title/Summary/Keyword: order in productivities

Search Result 38, Processing Time 0.019 seconds

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.

The Analysis of Welding Deformation in Arc-spot Welded Structure (I) - Temperature Monitoring and Heat Transfer Analysis - (아크 점용접 구조물의 정밀 용접 열변형 해석에 관한 연구 (I) -온도 모니터링 및 열전달 모델 정립-)

  • 이원근;장경복;강성수;조상명
    • Journal of Welding and Joining
    • /
    • v.20 no.4
    • /
    • pp.544-550
    • /
    • 2002
  • Arc-spot welding is generally used in joining of precise parts such as case and core in electronic compressor. It is important to control joining deformation in electronic compressor because clearance control in micrometer order is needed for excellent airtightness and anti-nose. The countermeasures far this deformation in field have mainly been dependent on the rule of try and error by operator's experience because of productivities. For control this deformation problem without influence on productivities, development of exact simulation model should be needed. In this study, to solve this deformation problem in arc-spot welded structure with case and core, we intend to make a simulation model that is able to predict deformation in precise order by tuning and feedback between sensing data and simulation results. This paper include development of heat input model for arc-spot welding, temperature monitoring and make a heat transfer model using sensing data in product.

The Analysis of Welding Deformation in Arc-spot Welded Structure (II) - Displacement Monitoring and Deformation Analysis - (아크 점용접 구조물의 정밀 용접 열변형 해석에 관한 연구 (II) - 변위 모니터링 및 변형 모델 정립 -)

  • 장경복;조상명
    • Journal of Welding and Joining
    • /
    • v.21 no.4
    • /
    • pp.80-86
    • /
    • 2003
  • Arc-spot welding is generally used in joining of precise parts such as case and core in electric compressor. It is important to control joining deformation in electric compressor because clearance control of micrometer order is needed for excellent airtightness and anti-nose. The countermeasures for this deformation in field have mainly been dependent on rule of try and error by operator's experience because of productivities. For control this deformation problem without influence on productivities, development of exact simulation model should be needed. In this study, on the basis of previous study, the analysis model io predict deformation of precise order in arc-spot welded structure with non-uniform stiffness is brought up through feedback and tuning between monitoring data and analysis results. For this, deformation monitoring system was built and boundary condition considering mechanical melting temperature was applied.

Comparison of Bio-ethanol Productivity Using Food Wastes by Various Culture Modes (에탄올 발효방법에 따른 음식물류 폐기물의 바이오에탄올 생산성 비교)

  • Kang, Hee-Jeong;Li, Hong-Xian;Kim, Yong-Jin;Kim, Seong-Jun
    • KSBB Journal
    • /
    • v.25 no.5
    • /
    • pp.471-477
    • /
    • 2010
  • In order to improve bio-ethanol productivity by various cultivation methods in this paper, the culture modes using food wastes, such as batch culture, high-cell-density fermentation, SSF (simultaneous saccharification and fermentation) by fill & draw, continuous culture by fill & draw were performed and their productivities were compared. SSFs by fill & draw were performed by continuous decompression using 1 L evaporator system, and by 10 L bioreactor without decompression. In addition, the continuous cultures by fill & draw mode using SFW (saccharafied food wastes) medium were performed by changes of 40% culture broth with intervals of 12 h (0.03 $h^{-1}$), 6 h (0.07 $h^{-1}$), 3 h (0.13 $h^{-1}$). Consequently, productivities of bio-ethanol were 2.52 g/L-h and 1.30 g/L-h in batch culture and high- cell-density fermentation, respectively. The productivities of SSF by fill & draw showed 2.24 g/L-h and 2.03 g/L-h in continuous decompression with 1 L evaporator and 10 L bioreactor without decompression, respectively. Also, the productivities in continuous culture by fill & draw modes showed 2.02 g/L-h, 4.07 g/L-h and 6.25 g/L-h by medium change with intervals of 12 h, 6 h, and 3 h, respectively. In conclusion, the highest ethanol productivity was obtained in the continuous culture mode by fill & draw with dilution rate of 0.13 $h^{-1}$.

The estimation of the productivity in adjacent water fisheries (연근해어업 업종별 생산성 추정에 관한 연구)

  • Park, Cheol-Hyung
    • The Journal of Fisheries Business Administration
    • /
    • v.45 no.1
    • /
    • pp.63-77
    • /
    • 2014
  • This study is to estimate the recent changes in total factor productivity of 15 Korean adjacent water fisheries based on Malmquist productivity indices. The study adopted both input and output oriented productivity measures utilizing a hyperbola distance function. In addition to this point, the study also calculated the 95% confidence interval for the various components of the productivities in order to access the statistical significance of estimates using 2000 times of re-sampling process through the smoothed bootstraping. The results of the study showed us that there was 18% reduction in the overall total factor productivity during the study period from 2007 to 2011, which turned out to be 5% of annual decrease in productivity. The study found that the main reason of this decrease in total productivity is about 22% downward shift of a fisheries production function due to recent conditions of a devastated fishing ground. When we evaluated the statistical significance of changes in technical efficiency combining both pure technical and scale efficiency based on the 95% confidence intervals, we could not find any evidence of changes in those components of total factor productivity. When we accessed the productivity of the each of 15 adjacent water fisheries methods, only the large danish seine fisheries showed us about 7% increase in productivity. Even though the large trawling and the large tow-boat trawling revealed no changes in productivity, all of the other 12 fisheries suffered the decreases in productivities.

Development of Component Framework for Supply-Chain Management

  • Wang, Gi-Nam;Choi, Jung-Won
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07b
    • /
    • pp.431-445
    • /
    • 1999
  • This paper introduces a development of component based framework of supply-chain management. The existing legacy system, which is not designed for object-oriented paradigm, is re-modeled using unified modeling language. Components are extracted from the legacy application, and frameworks are also designed in order to increase productivities of software development. Design issues concerning component and framework development are discussed with real situation. Performance and development productivity issue are also discussed with discussing component size and scope. A real case is presented in connection with the discussed issues.

  • PDF

S-Adenosyl-L-Methionine Analogues to Enhance the Production of Actinorhodin

  • Chong You-Hoon;Young Jung-Mo;Kim Jin-Young;Lee Yu-Kyung;Park Kwang-Su;Cho Jun-Ho;Kwon Hyung-Jin;Suh Joo-WOn;Lim Yoong-Ho
    • Journal of Microbiology and Biotechnology
    • /
    • v.16 no.7
    • /
    • pp.1154-1157
    • /
    • 2006
  • It is known that overexpression of S-adenosyl-L-methionine (SAM) synthetase or exogenous addition of SAM enhances the production of actinorhodin, one of pigmented antibiotics found from Streptomyces coelicolor. In order to discover a novel compound as a signal molecule to produce actinorhodin instead of SAM, several compounds were synthesized based on the relationships between structures of the SAM analogues and their actinorhodin productivities. Of these, a few compounds showed better productivities of actinorhodin than SAM.

Improving the Productivity of Single-Chain Fv Antibody Against c-Met by Rearranging the Order of its Variable Domains

  • Kim, Yu-Jin;Neelamegam, Rameshkumar;Heo, Mi-Ae;Edwardraja, Selvakumar;Paik, Hyun-Jong;Lee, Sun-Gu
    • Journal of Microbiology and Biotechnology
    • /
    • v.18 no.6
    • /
    • pp.1186-1190
    • /
    • 2008
  • Single-chain Fv (scFv) antibody against c-Met is expected to be employed in clinical treatment or imaging of cancer cells owing to the important biological roles of c-Met in the proliferation of malignancies. Here, we show that the productivity of scFv against c-Met in Escherichia coli is significantly influenced by the orientation of its variable domains. We generated anti-c-Met scFv antibodies with two different domain orders (i.e., $V_L$-linker-$V_H$ and $V_H$-linker-$V_L$), expressed them in the cytoplasm of E. coli trx/gor deleted mutant, and compared their specific activities as well as their productivities. Productivity of total and functional anti-c-Met scFv with $V_H/V_L$ orientation was more than five times higher than that with $V_L/V_H$ format. Coexpression of DsbC enhanced the yield of soluble amounts of anti-c-Met scFv protein for both constructs. The purified scFv antibodies of the two different formats exhibited almost the same antigen-binding activities. We also compared the productivities and specific activities of anti-c-Met diabodies with $V_H/V_L$ or $V_L/V_H$ formats and obtained similar results to the case of scFv antibodies.

Factors for Selecting Forms; A Case-Study (건설프로젝트 거푸집 선정 요인의 현황 및 개선 방향)

  • Jung Young-Soo;Park Ji-Ho;Kang Seung-Hee;Park Bok-Man;Choi In-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.111-116
    • /
    • 2005
  • The formwork is very important in terms of time and cost of construction project. There have been ample research efforts regarding to technical issues such as types, specifications, and productivities. However, no previous research has addressed managerial requirements of the formwork. Thus, this paper investigated the present status of form work analyzing a case-study company, and derived an improvement plan for the formwork. The findings includes 1) the needs for increasing use of system forms in order to improve the quality and the safety and 2) further development of management system of formwork in order to enhance the efficiency.

  • PDF

A Case Study on Productivity Improvement by a Discrete Event-Driven Simulation System (이산사건 시뮬레이션 시스템을 활용한 생산성 개선 사례 연구)

  • Kim, Sangtae;Shin, Moonsoo;Ryu, Kwangyeol;Cho, Yongju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.149-158
    • /
    • 2015
  • Up-to-date manufacturing companies have faced a market-driven environment of pull production order. There should be a difference in operating manufacturing resources according to the type, quantity, and delivery time of manufactured products, because the process situation in pull production is changed by customer orders. And it should be taken into account from the stage of preparing for production such as process design and the placement and utilization of manufacturing resources. However, the feasibility of production plans is limited because most of small manufacturing businesses make production/supply plan of the parts and products assuming that equipment abilities in scheduling is sufficient without managing process standard information systemically. In this study, a discrete event simulation system based on BOM (bill of material), that is F-OPIS (online productivity innovation system), is introduced and a case study on application of the system leading to improving productivities is presented. F-OPIS deals with a decision-problem on production management and it is specialized for small-and- medium sized manufacturing companies. The target company of this case study is a typical small-and-medium sized manufacturing company in Korea, that produces various machined parts. The target company adopts make-to-stock production management to prevent tardy delivery because of fluctuations in demand. Therefore, it is required to apply an efficient inventory control solution for improving productivities. In this paper, based on the constraints of working capacity of manufacturing resources, the bottleneck process is analyzed as production conditions are changed. Consequently, an improvement plan is proposed, that eventually enhances overall utilization rates of resources in the bottleneck process and reduces overall production lead-time and inventory level.