• 제목/요약/키워드: optimized schedule

검색결과 70건 처리시간 0.023초

포토폴리머 기반의 다시점 VHOE 광학판 구현을 위한 최적 노출시간 스케줄링 기법 (Optimized Exposure-time Scheduling scheme for Implementation of the Photopolymer-based Multiview VHOE)

  • 김승철;구정식;조병철;김은수
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2002년도 춘계학술대회 논문집 디스플레이 광소자 분야
    • /
    • pp.132-135
    • /
    • 2002
  • In this paper, a new method to implement the photopolymer-based VHOE using the optimized exposure time schedule is proposed. The cumulative grating strength dependence on the exposure energy is mathematically modeled by using the fourth-order polynomial function and then using this model, the optimized exposure-time schedule of the photopolymer for recording the given multiple gratings is calculated.

  • PDF

A Development of Nurse Scheduling Model Based on Q-Learning Algorithm

  • JUNG, In-Chul;KIM, Yeun-Su;IM, Sae-Ran;IHM, Chun-Hwa
    • 한국인공지능학회지
    • /
    • 제9권1호
    • /
    • pp.1-7
    • /
    • 2021
  • In this paper, We focused the issue of creating a socially problematic nurse schedule. The nurse schedule should be prepared in consideration of three shifts, appropriate placement of experienced workers, the fairness of work assignment, and legal work standards. Because of the complex structure of the nurse schedule, which must reflect various requirements, in most hospitals, the nurse in charge writes it by hand with a lot of time and effort. This study attempted to automatically create an optimized nurse schedule based on legal labor standards and fairness. We developed an I/O Q-Learning algorithm-based model based on Python and Web Application for automatic nurse schedule. The model was trained to converge to 100 by creating an Fairness Indicator Score(FIS) that considers Labor Standards Act, Work equity, Work preference. Manual nurse schedules and this model are compared with FIS. This model showed a higher work equity index of 13.31 points, work preference index of 1.52 points, and FIS of 16.38 points. This study was able to automatically generate nurse schedule based on reinforcement Learning. In addition, as a result of creating the nurse schedule of E hospital using this model, it was possible to reduce the time required from 88 hours to 3 hours. If additional supplementation of FIS and reinforcement Learning techniques such as DQN, CNN, Monte Carlo Simulation and AlphaZero additionally utilize a more an optimized model can be developed.

DSL: Dynamic and Self-Learning Schedule Method of Multiple Controllers in SDN

  • Li, Junfei;Wu, Jiangxing;Hu, Yuxiang;Li, Kan
    • ETRI Journal
    • /
    • 제39권3호
    • /
    • pp.364-372
    • /
    • 2017
  • For the reliability of controllers in a software defined network (SDN), a dynamic and self-learning schedule method (DSL) is proposed. This method is original and easy to deploy, and optimizes the combination of multiple controllers. First, we summarize multiple controllers' combinations and schedule problems in an SDN and analyze its reliability. Then, we introduce the architecture of the schedule method and evaluate multi-controller reliability, the DSL method, and its optimized solution. By continually and statistically learning the information about controller reliability, this method treats it as a metric to schedule controllers. Finally, we compare and test the method using a given testing scenario based on an SDN network simulator. The experiment results show that the DSL method can significantly improve the total reliability of an SDN compared with a random schedule, and the proposed optimization algorithm has higher efficiency than an exhaustive search.

Implementation of the VHOE-based Multiview 3D Display System by using Optimized Exposure-Time Scheduling Scheme

  • Kim, Seung-Chul;Gu, Jung-Sik;Kim, Eun-Soo
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2002년도 International Meeting on Information Display
    • /
    • pp.883-886
    • /
    • 2002
  • A new exposure time scheduling scheme to implement the optimized photopolymer-based VHOE is proposed and using this method, the 8-view VHOE system is experimentally developed. The CGS dependence on the exposure energy is mathematically modeled using the fourth-order polynomial function and using this model optimized exposure-time schedule for recording the given multiple gratings in the photopolymer is calculated. In addition, basing on this suggested exposure-time schedule, 8-view VHOE is finally implemented and its performance is discussed.

  • PDF

Whirlpool 해쉬 함수의 효율적인 하드웨어 구현 (An Efficient Hardware Implementation of Whirlpool Hash Function)

  • 박진철;신경욱
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2012년도 추계학술대회
    • /
    • pp.263-266
    • /
    • 2012
  • 본 논문에서는 ISO/IEC 10118-3의 표준인 Whirlpool 해쉬 함수의 효율적인 하드웨어 설계와 FPGA 검증에 대해 기술한다. Pipelined small LUT를 이용하여 동작 타이밍을 최적화하였으며, Whirlpool 블록암호와 key schedule을 병렬로 사용하여 throughput을 개선하였다. 키 스케쥴에서 키 덧셈부분에 rom과 xor 게이트를 사용하지 않고 인버터와 mux로 구현하여 면적을 최적화하였다. Virtex5-XC5VSX50T를 사용하여 FPGA 검증을 하였고 최대 동작 주파수는 약 151MHz이며, 약 950Mbps의 성능을 가진다.

  • PDF

Optimal dwelling time prediction for package tour using K-nearest neighbor classification algorithm

  • Aria Bisma Wahyutama;Mintae Hwang
    • ETRI Journal
    • /
    • 제46권3호
    • /
    • pp.473-484
    • /
    • 2024
  • We introduce a machine learning-based web application to help travel agents plan a package tour schedule. K-nearest neighbor (KNN) classification predicts the optimal tourists' dwelling time based on a variety of information to automatically generate a convenient tour schedule. A database collected in collaboration with an established travel agency is fed into the KNN algorithm implemented in the Python language, and the predicted dwelling times are sent to the web application via a RESTful application programming interface provided by the Flask framework. The web application displays a page in which the agents can configure the initial data and predict the optimal dwelling time and automatically update the tour schedule. After conducting a performance evaluation by simulating a scenario on a computer running the Windows operating system, the average response time was 1.762 s, and the prediction consistency was 100% over 100 iterations.

능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구 (Usability Improvement of BIM for Construction Projects Using Active BIM Functions)

  • 강인석;문현석;김현승;곽중민
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.74-83
    • /
    • 2013
  • 현재 활용되고 있는 대부분의 BIM체계는 설계 및 시공단계의 작업 현상에 대한 시각적 정보제공에 초점을 두고 있는 수동형 BIM (Passive BIM) 운영체계이다. 수동형 BIM체계에서는 설계성과품의 간섭발생 부위를 3D객체에 의해 시각적으로 파악할 수 있으나, 추가적으로 간섭 상황의 해결방안을 제시하는 것은 곤란하다. 또한 시공단계 4D시뮬레이션도 일정별 시공형태의 표현은 가능하나, 프로젝트 공정조건을 고려한 최적화된 일정계획의 제시 등은 미흡한 수준이다. 그러나 최근 다양한 기관에서 BIM을 적용하면서 사용자의 BIM 요구수준은 이미 시각적 정보제공을 넘어서, 파악된 문제 현상의 해결방안까지 BIM으로 표현할 수 있는 능동형 BIM (Active BIM) 기능들을 요구하고 있다. 본 연구에서는 능동형 BIM의 개념적용을 위해 시공단계의 대표적 BIM 도구인 4D CAD시스템을 예로 하여 능동형 기능 구성방법론을 제시하고 독자적 개발엔진으로 시스템 구현을 시도하였다.

Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제11권2호
    • /
    • pp.43-49
    • /
    • 2009
  • Since the late 1980s, the schedule technique applied to the construction industry around the world has rapidly changed from the traditional ADM (Arrow Diagramming Method) to the PDM (Precedence Diagramming Method) technique. The main reason for this change is to overcome the limits and inconveniences of the traditional ADM technique. The time-cost trade-off is one of the core scheduling techniques to establish the best optimized combination plan in terms of a relationship between the cost and schedule. However, most of the schedule-related textbooks and research papers have discussed and proposed applications of a time-cost trade-off technique based only on the Finish to Start relationship. Therefore, there are almost no consideration and discussion of problems or restrictions that emerge when the time-cost trade-off technique is applied to the PDM network that has overlapping relationships. This paper proposes the lead-time adjustment method as a methodology for overcoming some restrictions that are encountered when the time-cost trade-off technique is applied to the overlapping relationships of the PDM network.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Analysis on Tracking Schedule and Measurements Characteristics for the Spacecraft on the Phase of Lunar Transfer and Capture

  • Song, Young-Joo;Choi, Su-Jin;Ahn, Sang-Il;Sim, Eun-Sup
    • Journal of Astronomy and Space Sciences
    • /
    • 제31권1호
    • /
    • pp.51-61
    • /
    • 2014
  • In this work, the preliminary analysis on both the tracking schedule and measurements characteristics for the spacecraft on the phase of lunar transfer and capture is performed. To analyze both the tracking schedule and measurements characteristics, lunar transfer and capture phases' optimized trajectories are directly adapted from former research, and eleven ground tracking facilities (three Deep Space Network sties, seven Near Earth Network sites, one Daejeon site) are assumed to support the mission. Under these conceptual mission scenarios, detailed tracking schedules and expected measurement characteristics during critical maneuvers (Trans Lunar Injection, Lunar Orbit Insertion and Apoapsis Adjustment Maneuver), especially for the Deajeon station, are successfully analyzed. The orders of predicted measurements' variances during lunar capture phase according to critical maneuvers are found to be within the order of mm/s for the range and micro-deg/s for the angular measurements rates which are in good agreement with the recommended values of typical measurement modeling accuracies for Deep Space Networks. Although preliminary navigation accuracy guidelines are provided through this work, it is expected to give more practical insights into preparing the Korea's future lunar mission, especially for developing flight dynamics subsystem.