• Title/Summary/Keyword: optimized schedule

Search Result 70, Processing Time 0.033 seconds

Optimized Exposure-time Scheduling scheme for Implementation of the Photopolymer-based Multiview VHOE (포토폴리머 기반의 다시점 VHOE 광학판 구현을 위한 최적 노출시간 스케줄링 기법)

  • Kim, Seung-Cheol;Koo, Jung-Sik;Cho, Byung-Chul;Kim, Eun-Soo
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.04b
    • /
    • pp.132-135
    • /
    • 2002
  • In this paper, a new method to implement the photopolymer-based VHOE using the optimized exposure time schedule is proposed. The cumulative grating strength dependence on the exposure energy is mathematically modeled by using the fourth-order polynomial function and then using this model, the optimized exposure-time schedule of the photopolymer for recording the given multiple gratings is calculated.

  • PDF

A Development of Nurse Scheduling Model Based on Q-Learning Algorithm

  • JUNG, In-Chul;KIM, Yeun-Su;IM, Sae-Ran;IHM, Chun-Hwa
    • Korean Journal of Artificial Intelligence
    • /
    • v.9 no.1
    • /
    • pp.1-7
    • /
    • 2021
  • In this paper, We focused the issue of creating a socially problematic nurse schedule. The nurse schedule should be prepared in consideration of three shifts, appropriate placement of experienced workers, the fairness of work assignment, and legal work standards. Because of the complex structure of the nurse schedule, which must reflect various requirements, in most hospitals, the nurse in charge writes it by hand with a lot of time and effort. This study attempted to automatically create an optimized nurse schedule based on legal labor standards and fairness. We developed an I/O Q-Learning algorithm-based model based on Python and Web Application for automatic nurse schedule. The model was trained to converge to 100 by creating an Fairness Indicator Score(FIS) that considers Labor Standards Act, Work equity, Work preference. Manual nurse schedules and this model are compared with FIS. This model showed a higher work equity index of 13.31 points, work preference index of 1.52 points, and FIS of 16.38 points. This study was able to automatically generate nurse schedule based on reinforcement Learning. In addition, as a result of creating the nurse schedule of E hospital using this model, it was possible to reduce the time required from 88 hours to 3 hours. If additional supplementation of FIS and reinforcement Learning techniques such as DQN, CNN, Monte Carlo Simulation and AlphaZero additionally utilize a more an optimized model can be developed.

DSL: Dynamic and Self-Learning Schedule Method of Multiple Controllers in SDN

  • Li, Junfei;Wu, Jiangxing;Hu, Yuxiang;Li, Kan
    • ETRI Journal
    • /
    • v.39 no.3
    • /
    • pp.364-372
    • /
    • 2017
  • For the reliability of controllers in a software defined network (SDN), a dynamic and self-learning schedule method (DSL) is proposed. This method is original and easy to deploy, and optimizes the combination of multiple controllers. First, we summarize multiple controllers' combinations and schedule problems in an SDN and analyze its reliability. Then, we introduce the architecture of the schedule method and evaluate multi-controller reliability, the DSL method, and its optimized solution. By continually and statistically learning the information about controller reliability, this method treats it as a metric to schedule controllers. Finally, we compare and test the method using a given testing scenario based on an SDN network simulator. The experiment results show that the DSL method can significantly improve the total reliability of an SDN compared with a random schedule, and the proposed optimization algorithm has higher efficiency than an exhaustive search.

Implementation of the VHOE-based Multiview 3D Display System by using Optimized Exposure-Time Scheduling Scheme

  • Kim, Seung-Chul;Gu, Jung-Sik;Kim, Eun-Soo
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2002.08a
    • /
    • pp.883-886
    • /
    • 2002
  • A new exposure time scheduling scheme to implement the optimized photopolymer-based VHOE is proposed and using this method, the 8-view VHOE system is experimentally developed. The CGS dependence on the exposure energy is mathematically modeled using the fourth-order polynomial function and using this model optimized exposure-time schedule for recording the given multiple gratings in the photopolymer is calculated. In addition, basing on this suggested exposure-time schedule, 8-view VHOE is finally implemented and its performance is discussed.

  • PDF

An Efficient Hardware Implementation of Whirlpool Hash Function (Whirlpool 해쉬 함수의 효율적인 하드웨어 구현)

  • Park, Jin-Chul;Shin, Kyung-Wook
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.263-266
    • /
    • 2012
  • This paper describes an efficient hardware implementation of Whirlpool hash function as ISO/IEC 10118-3 standard. Optimized timing is achieved by using pipelined small LUTs, and Whirlpool block cipher and key schedule have been implemented in parallel for improving throughput. In key schedule, key addition is area-optimized by using inverters and muxes instead of using rom and xor gates. This hardware has been implemented on Virtex5-XC5VSX50T FPGA device. Its maximum operating frequency is about 151MHz, and throughput is about 950Mbps.

  • PDF

Optimal dwelling time prediction for package tour using K-nearest neighbor classification algorithm

  • Aria Bisma Wahyutama;Mintae Hwang
    • ETRI Journal
    • /
    • v.46 no.3
    • /
    • pp.473-484
    • /
    • 2024
  • We introduce a machine learning-based web application to help travel agents plan a package tour schedule. K-nearest neighbor (KNN) classification predicts the optimal tourists' dwelling time based on a variety of information to automatically generate a convenient tour schedule. A database collected in collaboration with an established travel agency is fed into the KNN algorithm implemented in the Python language, and the predicted dwelling times are sent to the web application via a RESTful application programming interface provided by the Flask framework. The web application displays a page in which the agents can configure the initial data and predict the optimal dwelling time and automatically update the tour schedule. After conducting a performance evaluation by simulating a scenario on a computer running the Windows operating system, the average response time was 1.762 s, and the prediction consistency was 100% over 100 iterations.

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

Time-Cost Trade-Off by Lead-Time Adjustment in the PDM Network

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.43-49
    • /
    • 2009
  • Since the late 1980s, the schedule technique applied to the construction industry around the world has rapidly changed from the traditional ADM (Arrow Diagramming Method) to the PDM (Precedence Diagramming Method) technique. The main reason for this change is to overcome the limits and inconveniences of the traditional ADM technique. The time-cost trade-off is one of the core scheduling techniques to establish the best optimized combination plan in terms of a relationship between the cost and schedule. However, most of the schedule-related textbooks and research papers have discussed and proposed applications of a time-cost trade-off technique based only on the Finish to Start relationship. Therefore, there are almost no consideration and discussion of problems or restrictions that emerge when the time-cost trade-off technique is applied to the PDM network that has overlapping relationships. This paper proposes the lead-time adjustment method as a methodology for overcoming some restrictions that are encountered when the time-cost trade-off technique is applied to the overlapping relationships of the PDM network.

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Analysis on Tracking Schedule and Measurements Characteristics for the Spacecraft on the Phase of Lunar Transfer and Capture

  • Song, Young-Joo;Choi, Su-Jin;Ahn, Sang-Il;Sim, Eun-Sup
    • Journal of Astronomy and Space Sciences
    • /
    • v.31 no.1
    • /
    • pp.51-61
    • /
    • 2014
  • In this work, the preliminary analysis on both the tracking schedule and measurements characteristics for the spacecraft on the phase of lunar transfer and capture is performed. To analyze both the tracking schedule and measurements characteristics, lunar transfer and capture phases' optimized trajectories are directly adapted from former research, and eleven ground tracking facilities (three Deep Space Network sties, seven Near Earth Network sites, one Daejeon site) are assumed to support the mission. Under these conceptual mission scenarios, detailed tracking schedules and expected measurement characteristics during critical maneuvers (Trans Lunar Injection, Lunar Orbit Insertion and Apoapsis Adjustment Maneuver), especially for the Deajeon station, are successfully analyzed. The orders of predicted measurements' variances during lunar capture phase according to critical maneuvers are found to be within the order of mm/s for the range and micro-deg/s for the angular measurements rates which are in good agreement with the recommended values of typical measurement modeling accuracies for Deep Space Networks. Although preliminary navigation accuracy guidelines are provided through this work, it is expected to give more practical insights into preparing the Korea's future lunar mission, especially for developing flight dynamics subsystem.