Kim, Young-Shin;Jeong, Jae-Hoon;Jung, Ji-Sook;Park, Kyung-Suk;Lee, Hyon-Yong
Journal of The Korean Association For Science Education
/
v.29
no.3
/
pp.304-313
/
2009
Proportional reasoning is one of the most widely used concepts in everyday life. It could be the most important basic concept in science and mathematics. In research where the subjects were animals, it has been found that learning effect rapidly decreased with any stimulation given after a optimalperiod. Therefore, it is necessary to research about optimal periods in order to instruct about proportional reasoning. The purpose of this study was to investigate the optimal periods in proportional reasoning. The three programs for proportional reasoning instruction were developed by researchers. The titles of the programs were 'Block', 'Balance scale' and 'Water glass'. The subjects were 131 3$^{rd}$ to 6$^{th}$ grade students who were not expected to have any proportional reasoning skills yet. In order to find out the optimal periods in proportional reasoning, the programs were applied to these students. After 4-5 weeks of treatment, the researchers investigated whether their proportional reasoning skills were formed or not through the instrument. The results indicated that it would be most effective to teach proportional reasoning to 6$^{th}$ grade students. Teaching of proportional reasoning is essential not only for mathematics but also for science. The findings could be used to investigate the optimal periods of controlling variables, probability, combinational and correlational logic.
Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Even a trip of a single nuclear power plant (NPP) causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this paper we investigated the optimal replacement periods of the control computer's components of Wolsung nuclear power plant Unit 1. We first derived mathematical models for optimal replacement periods to the digital control computer's components of Wolsung NPP Unit 1 and calculated the optimal replacement periods analytically. We compared the periods with the replacement periods currently used at Wolsung NPP Unit 1. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained and those used in the field show a little difference.
Due to the customer needs of reducing cost and delivery date shorting, prompt change in the production plan became more important. In the multi period system (For instance, production line.) where target processing time exists, production, idle and delay risks occur repeatedly for multiple periods. In such situations, delay of one process may influence the delivery date of an entire process. In this paper, we discuss the minimum expected cost of the case mentioned above, where the risk depends on the previous situation and occurs repeatedly for multiple periods. This paper considers the optimal switching frequency to minimize the total expected cost of the production process. In this paper, first, the optimal switching frequency model is proposed. Next, the mathematic formulation of the total expectation is presented. Finally, the policy of optimal switching frequency is investigated by numerical experiments.
It is difficult to determine an appropriate discount price for daily perishable products to increase profit from a long-term standpoint. Even if the discount pricing is efficient to increase profit of the day, consumers memorize the sales price and they might hesitate to purchase the product at a regular price the following day. The authors discussed the inventory clearance pricing for a single period in our previous study by constructing a mathematical model to derive an optimal sales price to maximize the expected profit by considering the reference price effect of demand. This paper extends the discussion to handle the discount pricing for multiple periods. A mathematical analysis is first conducted to reveal the properties on an objective function, which is the present value of total expected profits for multiple periods. An algorithm is then proposed to derive an optimal price for asymmetric consumers. Numerical experiments investigate the characteristics of the objective function and optimal pricings.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.4
/
pp.110-117
/
2012
The demand for facility used in producing multi-products is changed dynamically for discrete and finite time periods. The excess or the shortage for facility is occurred according to difference of the facility capacity size and demand for facility through given time periods. The shortage facility is met through the outsourcing production. The excess facility cost is considered for the periods that the facility capacity is greater than the demand for the facility, and the outsourcing production cost is considered for the periods that the demand for facility is greater than the facility capacity. This paper addresses to determine the facility capacity size, outsourcing production products and amount that minimizes the sum of the facility capacity cost, the excess facility cost and the outsourcing production cost. The characteristics of the optimal solution are analyzed, and an algorithm applying them is developed. A numerical example is shown to explain the problem.
Journal of Korean Institute of Industrial Engineers
/
v.19
no.3
/
pp.71-79
/
1993
Dynamic production planning problems are to determine the optimal production times and production quantities of product for discrete finite periods. In previous many researches, the solutions for these problems have been developed through the algorithms using dynamic programming. The purpose of this research is to suggest the new algorithm using linear programming. This research is to determine optimal production quantities of product in each period to satisfy dynamic for discrete finite periods, minimizing the total of production cost and inventory holding cost. Cost functions are concave, and no backlogging for product is allowed. The new algorithm for capacity constrained problem is developed.
Recently in the design of fuel tanks(launch vehicle, ship, automobile) which transport a large amount of liquid in the cargo holds, the structural damage due to liquid-sloshing becomes an important problem. The impact pressure from sloshing is most violent when the liquid motion of a partially filled tank is in resonance with the motion of a system. In this paper, the sloshing natural periods in liquid tanks are estimated for partially filled tanks with various geometries. In addition to, controlled for a launch vehicle with liquid sloshing effect by PD controller and sloshing filter The PD gain and sloshing filter parameter arc determined by optimal algorithm.
Today the congestion problem is a problem for the most of the cities to solve. Especially, traffic congestion in the big cities is occurring regardless of the rush-hours. Because the transportation facilities secured in the big cities are very low, and the financial resources and sites for the expansion of new transportation facilities are also limited. Therefore the appropriate Transportation system Management(TSM) techniques which could improve the transportation system are absolutely required to solve the transportation problems instead of the expansion of the transportation facilities in the big cities. The purpose in this study was to review the travel characteristics on the Pretimed Signalized - Intersections under the study in Pusan area, construct the travel systems during the different time-periods based upon the travel characteristics reviewed, and finally suggest the optimal travel systems which could reduce the traffic delay and fuel consumption of the Pretimed Signalized - Intersections based upon the travel system constructed. Based upon the results, it could be concluded that the pretimed signal system based upon the on-peak periods should not be applied to all the different time-periods on the Pretimed Signalized - Intersections(PSI) to reduce traffic delay and fuel consumption, and increase the travel capacity on the intersections in Pusan area.
In this paper, the method of determining the economically-optimal design section of rubble mound breakwater, using ADS program, was studied to supplement the deterministic approach. First of all, the design waves are computed, according to the return periods, using the Weibull distribution from the data of waves at the location of the breakwater. In order to take an optimal section, according to the return periods, the ADS program was used. The restriction conditions and objective functions are decided from the references of the specifications and standard manuals for Coastal and Harbor Construction Work. Results from this study support the ADS program as an appropriate method for determining the economically-optimal section of rubble mound breakwater, comparing the construction costs and the initial and damage repair costs for its life time.
The security threat posed by worms has steadily increased in recent years. This paper discusses the application of the optimal and sub-optimal Internet worm control via Pontryagin's maximum principle. To this end, a control variable representing the optimal treatment strategy for infectious hosts is introduced into the two-factor worm model. The numerical optimal control laws are implemented by the multiple shooting method and the sub-optimal solution is computed using genetic algorithms. Simulation results demonstrate the effectiveness of the proposed optimal and sub-optimal strategies. It also provides a theoretical interpretation of the practical experience that the maximum implementation of treatment in the early stage is critically important in controlling outbreaks of Internet worms. Furthermore, our results show that the proposed sub-optimal control can lead to performance close to the optimal control, but with much simpler strategies for long periods of time in practical use.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.