• 제목/요약/키워드: optimal maintenance

검색결과 868건 처리시간 0.023초

예방보전이 불완전할 때 최적 주기적 예방보전 계획 (Optimal Periodic Preventive Maintenance Schedule When Preventive Maintenance is Imperfect)

  • 김대경;신상욱;임재학
    • 품질경영학회지
    • /
    • 제35권4호
    • /
    • pp.140-146
    • /
    • 2007
  • In this paper, we consider a periodic imperfect preventive maintenance(PM) policy in which the system's failure rate after each PM remains unchanged. The system undergoes only minimal repairs at failures between PMs. Exact mathematical formula of the expected cost rate per unit time is derived. Optimal number of PMs and optimal maintenance period are derived by minimizing the expected cost rate per unit time. A numerical example is provided to illustrate the proposed approach under Weibull lifetime distribution.

교체-수리보증 하에서 연장된 보증이 종료된 이후의 예방보전정책 (Preventive Maintenance Policy Following the Expiration of Extended Warranty Under Replacement-Repair Warranty)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제14권2호
    • /
    • pp.122-128
    • /
    • 2014
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of extended warranty under replacement-repair warranty. Under the replacement-repair warranty, the failed system is replaced or minimally repaired by the manufacturer at no cost to the user. Also, under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective. And then we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Weibull형 고장분포를 갖는 선박용 부품의 최적 보전시기의 결정수법에 관한 연구 (A Study on the Decision of an Optimal Maintenance Period for Ship's Machinery Items using the Cumulative Hazard Rate Function for Weibull Distribution)

  • 유희한
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제24권2호
    • /
    • pp.90-96
    • /
    • 2000
  • The technology of preventive maintenance and corrective maintenance is widely applied to ships in order to maintain the good voyageable condition. One of the most important fields of marine engineering is to seek the maximum availability and to solve the stochastic maintenance problem such that the cost for corrective maintenance is minimized. Accordingly, for the purpose of making the most suitable maintenance schedule which minimizes the expected cost function, this paper suggests the method to grasp the failure characteristics by the ship's maintenance data that are collected from the past. And, suggests the method to estimate the optimal maintenance interval by using the dynamic programming and the cumulative hazard rate function attained from the maintenance data.

  • PDF

Deep reinforcement learning for optimal life-cycle management of deteriorating regional bridges using double-deep Q-networks

  • Xiaoming, Lei;You, Dong
    • Smart Structures and Systems
    • /
    • 제30권6호
    • /
    • pp.571-582
    • /
    • 2022
  • Optimal life-cycle management is a challenging issue for deteriorating regional bridges. Due to the complexity of regional bridge structural conditions and a large number of inspection and maintenance actions, decision-makers generally choose traditional passive management strategies. They are less efficiency and cost-effectiveness. This paper suggests a deep reinforcement learning framework employing double-deep Q-networks (DDQNs) to improve the life-cycle management of deteriorating regional bridges to tackle these problems. It could produce optimal maintenance plans considering restrictions to maximize maintenance cost-effectiveness to the greatest extent possible. DDQNs method could handle the problem of the overestimation of Q-values in the Nature DQNs. This study also identifies regional bridge deterioration characteristics and the consequence of scheduled maintenance from years of inspection data. To validate the proposed method, a case study containing hundreds of bridges is used to develop optimal life-cycle management strategies. The optimization solutions recommend fewer replacement actions and prefer preventative repair actions when bridges are damaged or are expected to be damaged. By employing the optimal life-cycle regional maintenance strategies, the conditions of bridges can be controlled to a good level. Compared to the nature DQNs, DDQNs offer an optimized scheme containing fewer low-condition bridges and a more costeffective life-cycle management plan.

분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정 (Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost)

  • 허재행;류재근;이우리;박종영;박종근
    • 전기학회논문지
    • /
    • 제62권11호
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

Impatience 특성을 고려한 군 긴급정비시스템 정비인력 최적할당 연구 (A Study on the Optimal Allocation of Maintenance Personnel in the Military Emergency Maintenance System Considering the Property of Impatience)

  • 김성우
    • 한국군사과학기술학회지
    • /
    • 제24권4호
    • /
    • pp.449-456
    • /
    • 2021
  • Impatience characteristics are an important factor to be considered in the defense field, which is sensitive to time, but there are not many cases applied. In addition, due to the difficulty of analysis that must consider various probabilistic factors (breakdown/maintenance distribution, impatience characteristics, etc.), military decision makers consider only simple data (number of occurrences per year, maintenance time, etc.) Therefore, in this study, a model capable of analyzing the performance of the emergency maintenance system for determining the appropriate size and organization of military and civilian maintenance personnel was presented in consideration of impatience characteristics and probabilistic factors. And through numerical analysis, the appropriate size of the military and civilian emergency maintenance teams was analyzed. This study is significant in that it can improve readiness of operational power and prevent waste of defense budget through efficient operation of the military's emergency maintenance system.

2차원 무료 보증이 종료된 이후의 보전정책 (Maintenance Policies Following the Expiration of Two-Dimensional Free Replacement Warranty)

  • 김호균
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제15권1호
    • /
    • pp.6-11
    • /
    • 2015
  • Maintenance plays an important role in keeping product availability, reliability and quality at an appropriate level. In this paper, two-types of maintenance policies are studied following the expiration of two-dimensional (2D) free replacement warranty. Both the fixed-maintenance-period policy and the variable-maintenance-period policy are based on a specified region of the warranty defined in terms of age and usage where all failures are minimally repaired. An accelerating failure time (AFT) model is used to allow for the effect of usage rate on product degradation. The maintenance model that arises following the expiration of 2D warranty is discussed. The expected cost rates per unit time from the user's point of view are formulated and the optimal maintenance policies are determined to minimize the expected cost rate to the user. Finally numerical examples are given to illustrate the optimal maintenance polices.

생애주기 비용을 이용한 철도교량의 최적유지관리 (The Optimal Maintenance Strategy of a Rail Bridge by Using Life Cycle Cost)

  • 양승이
    • 한국철도학회논문집
    • /
    • 제8권6호
    • /
    • pp.544-549
    • /
    • 2005
  • Nowadays, most of bridge networks are complete or close to completion. The biggest challenge railroad./highway agencies and departments of transportation face is the maintenance of these networks, keeping them safe and serviceable, with limited funds. To maintain the bridges effectively, there is an urgent need to predict their remaining life from a system reliability viewpoint. And, it is necessary to develop the maintenance models based on system reliability concept. In this paper, maintenance models are developed for preventive maintenance and essential maintenance by using system reliability and lifetime distributions. The proposed model is applied to an existing railroad bridge. The optimal maintenance strategy of this bridge is obtained in terms of services life extension and cumulative maintenance cost.

비용 종속적인 개선지수를 고려한 최적 예방보전 정책 (Optimal Preventive Maintenance Policy with Cost-dependent Improvement Factor)

  • 홍석수;박종훈;이창훈
    • 대한산업공학회지
    • /
    • 제36권2호
    • /
    • pp.108-116
    • /
    • 2010
  • The maintenance of a deteriorating system is often imperfect. Previous studies have shown that the imperfect preventive maintenance (PM) can reduce the wear out and aging effects of deteriorating systems to a certain level between the conditions of as good as new and as bad as old. In this paper, we employ the concept of the improvement factor in investigating two optimal PM policies; failure limit policy and periodic PM policy. We redefine the improvement factor model as a function of the cost of PM, using this concept, we derive the conditions of optimal PM policies and formulate expressions to compute the expected cost rate. Based on this information, the determination of the maintenance policies which minimize the cost rate is examined. Numerical examples for the Weibull distribution case are also given.

Cost Optimization of Ineffective Periodic Preventive Maintenance

  • Jung, Gi-Mun;Park, Dong-Ho;Yum, Joon-Keun
    • Communications for Statistical Applications and Methods
    • /
    • 제6권1호
    • /
    • pp.99-106
    • /
    • 1999
  • This paper considers an imperfect repair model for which the repairable system is maintained preventively at periodic times and is replaced by a new system when a predetermined number of preventive maintenance has been applied. our main objective of this is to determine the optimal number of preventive maintenances before the system is replaced and the optimal length of interval between two consecutive preventive maintenances under a new repair model which is referred to as an ineffective preventive maintenance. Such a model assumes a periodic preventive maintenance in which the system is effectively maintained with a certain probability. Otherwise the system is not improved at all after each maintenance and thus the failure rate remains the same as before. The criteria to determine the optimal number of preventive maintenances and length of period is the expected cost rate per unit time for an infinite time span. We give the explicit expressions for the expected cost rate per unit time. Some numerical examples are presented for illustrative purposes.

  • PDF