• Title/Summary/Keyword: optimal capacity

Search Result 1,694, Processing Time 0.026 seconds

A Study on Establishing Operation Mathematical Model for Optimum Capacity Estimation of the ESS Applications for each in the Nationwide Perspective (국가적 관점에서 용도별 ESS 적정용량 산정을 위한 운전수리모델 수립에 대한 연구)

  • Kim, Jung-Hoon;Youn, Seok-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.969-978
    • /
    • 2016
  • Around the world are increasing the demand for ESS. Currently, the domestic is expected to benefit by operating ESS. In the domestic, it is expected to benefit from operations of the installed ESS because of the introduction of ESS less capacity. However ESS capacity to the maximum profit occurs is unknown. ESS is different from the charge-discharge characteristics and the reserve to replace, depending on the application. Therefore, it should be established in accordance with the ESS optimal capacity according to the purpose used because it can maximize the quality and efficiency of the electric energy. To the ESS optimal capacity estimation by the purpose used, It should compare the investment cost caused by ESS facility installation and operation cost caused by operating ESS. In this paper, the operation mathematical model for estimating marginal operation costs established. In operation mathematical model, operating cost is considered fuel cost and no-load cost start-up cost. Because no-load cost and start-up cost are not related to cost and power plant output, there are expressed an integer variable costs as a step function.

THE OPTIMAL CAPACITY OF THE FINITE DAM WITH COMPOUND POISSON INPUTS

  • Bae, Jong-Ho
    • Journal of the Korean Statistical Society
    • /
    • v.32 no.1
    • /
    • pp.65-71
    • /
    • 2003
  • We consider the finite dam with compound Poisson inputs which is called M/G/1 finite dam. We assign some costs related to operating the dam and calculate the long-run average cost per unit time. Then, we find the optimal dam capacity under which the average costs is minimized.

Optimal sensing period in cooperative relay cognitive radio networks

  • Zhang, Shibing;Guo, Xin;Zhang, Xiaoge;Qiu, Gongan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.12
    • /
    • pp.5249-5267
    • /
    • 2016
  • Cognitive radio is an efficient technique to improve spectrum efficiency and relieve the pressure of spectrum resources. In this paper, we investigate the spectrum sensing period in cooperative relay cognitive radio networks; analyze the relationship between the available capacity and the signal-to-noise ratio of the received signal of second users, the target probability of detection and the active probability of primary users. Finally, we derive the closed form expression of the optimal spectrum sensing period in terms of maximum throughput. We simulate the probability of false alarm and available capacity of cognitive radio networks and compare optimal spectrum sensing period scheme with fixed sensing period one in these performance. Simulation results show that the optimal sensing period makes the cognitive networks achieve the higher throughput and better spectrum sensing performance than the fixed sensing period does. Cooperative relay cognitive radio networks with optimal spectrum sensing period can achieve the high capacity and steady probability of false alarm in different target probability of detection. It provides a valuable reference for choosing the optimal spectrum sensing period in cooperative relay cognitive radio networks.

Optimal Decisions for the Airline Seat Capacity Allocation Considering Consumer Buying Behavior (소비자의 구매행동을 고려한 항공편 최적 좌석용량 할당에 관한 연구)

  • Kim, Sang-Won
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.3
    • /
    • pp.185-193
    • /
    • 2009
  • We consider a two-fare, two-period airline seat capacity allocation problem where consumers may choose different options in purchasing an airline ticket. A consumer may decide to wait for reopening of the same fare class ticket which is originally intended to buy, or may buy a different fare class ticket within the same period, if the originally requested fare is unavailable. We investigate the impact of the consumer buying behavior on the optimal solutions and the expected revenue.

An Optimal Decision Model for Capacity and Inclining Angle of Residential Photovoltaic Systems (주택용 태양광발전시스템의 적정 용량 및 설치각 선정을 위한 최적화 모델 연구)

  • Jeon, Jeong-Pyo;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1046-1052
    • /
    • 2010
  • In residential house, photovoltaic (PV) system among various alternatives in renewable energy system is the most efficient and feasible solution for reducing energy consumption and electricity cost. However, relatively high initial cost make people reluctant to install PV system in their houses. Therefore, in the initial state for PV system installation in the house, it is very important to decide proper capacity of the PV system considering the expected energy usage and solar energy supplying condition with the house. This paper proposes a novel optimization model for deciding appropriate capacity of the PV system for residential house. The objective function of the model is to minimize the annual cost including electricity bill, operation and maintenance cost, and annual fixed cost calculated from the initial installation cost based on capital recovery factor (CRF). The model also shows the optimal inclining angle of PV panels of the system. In this paper, we estimate the PV output using PVWATTS (PV simulator of Office of Energy Efficiency and Renewable Energy) and find optimal solutions by Sequential Quadratic Programming (SQP) method using MATLAB software. The proposed approach is finally applied to a residential model house in Gangneung, Gangwon-Do and verified its feasibility for adopting to PV system design for residential houses.

Investigation on Selecting Optimal Wind Turbines in the Capacity Factor Point of View (이용률 관점에서의 최적 풍력발전기 선정에 대한 연구)

  • Woo, Jae-Kyoon;Kim, Byeong-Min;Paek, In-Su;Yoo, Neung-Soo;Nam, Yoon-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.5
    • /
    • pp.60-66
    • /
    • 2011
  • Selecting optimal wind turbine generators for wind farm sites in the capacity factor point of view is performed in this study. A program to determine the best wind turbine generator for the maximum capacity factor for a site was developed. The program uses both the wind characteristics of the site of interest and the power curves of the wind turbines. The program developed was applied to find out optimal wind turbine generators of three different sites in complex terrain and successfully yielded the best site dependent wind turbine generators. It was also used to determine the best wind turbine generator of the wind farm currently operating in Korea and proved its usefulness. The program and methodology developed in this study considered to be very useful at the initial design stage of the wind farm to determine the best wind turbine generators for the site of interest.

A Multi-level Optimal Power Flow Algorithm for Constrained Power Economic Dispatch Control (제약조건을 고려한 경제급전 제어를 위한 다단계 최적조류계산 알고리즘)

  • Song, Gyeong-Bin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.9
    • /
    • pp.424-430
    • /
    • 2001
  • A multi-level optimal power flow(OPF) algorithm has been evolved from a simple two stage optimal Power flow algorithm for constrained power economic dispatch control. In the proposed algorithm, we consider various constraints such as ower balance, generation capacity, transmission line capacity, transmission losses, security equality, and security inequality constraints. The proposed algorithm consists of four stages. At the first stage, we solve the aggregated problem that is the crude classical economic dispatch problem without considering transmission losses. An initial solution is obtained by the aggregation concept in which the solution satisfies the power balance equations and generation capacity constraints. Then, after load flow analysis, the transmission losses of an initial generation setting are matched by the slack bus generator that produces power with the cheapest cost. At the second stage we consider transmission losses. Formulation of the second stage becomes classical economic dispatch problem involving the transmission losses, which are distributed to all generators. Once a feasible solution is obtained from the second stage, transmission capacity and other violations are checked and corrected locally and quickly at the third stage. The fourth stage fine tunes the solution of the third stage to reach a real minimum. The proposed approach speeds up the two stage optimization method to an average gain of 2.99 for IEEE 30, 57, and 118 bus systems and EPRI Scenario systems A through D testings.

  • PDF

Relative Capacity of the Spectrum-Overlapped DS-CDMA System using the Lanczos Chip Waveform

  • Lee, Dong-Hun;Ryu, Heung-Gyoon
    • Journal of electromagnetic engineering and science
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2002
  • Performance improvement of the DS-CDMA system by the spectrum-overlap is important for better service quality or more system capacity. In this paper, an analysis thor capacity improvement is newly considered when the Lanczos chip waveform is used for the spectrum-overlapped DS-CDMA system. RC(relative capacity) is the ratio of the capacity of overlapping system to that of non-overlapping system, which is used for the expression of the capacity improvement. The optimal overlapping ratio is numerically found to make the maximum capacity improvement When the rectangular chip waveform is used far the overlapping system, maximum capacity improvement is increased by about 10% at the required BER=$10^{-3}$TEX> and the optimal overlapping ratio is 1.23. When the 95 % power bandwidth is considered for the Lanczos chip waveform, maximum capacity improvement is increased by 34.4% at overlapping ratio of 1.55 when the required BER is $10^{-3}$TEX>. The lower required BER far the better communication quality makes gradually smaller capacity improvement.

A Study on the Development of Cooling Simulation Program for Thermal Environmental Chamber (열환경챔버의 냉방 시뮬레이션 프로그램 개발에 관한 연구)

  • 이한홍
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.8 no.5
    • /
    • pp.108-114
    • /
    • 1999
  • The thermal environmental chamber has been using in maintaining weather condition keeping thermal capacity under heating and cooling load fluctuation and for the performance testing of cooling system or air-conditioner on artificial envi-ronment. In ordder to make the various environmental conditions in the thermal environmental chamber the proper cooling system is necessary to eliminate the heating load produced inside the chamber and to maintain the designed environmental condition. For this reason the optimal design of cooling system and the prediction of performance is also required. This paper describes the prediction of performance of cooling system in the thermal environmental chamber with the capacity of 37,000kcal/hr which is developed for the test of performance in heating mode of heat pump system, In the results this paper is trying to develop simulation program on the base of mathematical models and which can be applied effectively to the optimal design of cooling system and prediction of performance to the inside and outside change of envi-ronmetal load.

  • PDF

Development of the Optimal Reservoir Storage Determination Model for Supplying Rural Water (농업용 저수지 설계를 위한 저수량 최적화 모형의 개발)

  • 정하우;박태선;최진용
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.2
    • /
    • pp.69-80
    • /
    • 1998
  • The optimal reservoir storage capacity is needed to be determined at the stage of reservoir planning. The reservoir storage capacity should be based on water balance between demand and supply, and meet the water deficity during the growing season. However, the optimal reservoir storage capacity should be determined considering benefit-cost analysis for the project. In this study, Two models are developed. The one is the RSOM(Reservoir Storage Optimization Model), that is consisted by three submodels, MROPER (Modified Reservoir OPERation model), RESICO(REservoir SIze and the construction COst computation) model. And the other is the BECA(BEnefit-Cost Anaysis) model. For model application, three districts, Chungha, Ipsil and Edong were selected. The relative difference of B/C ratio between project planning data and estimation by RSOM is 17.9, 15.0 and 7.3% respectively, which may be applicable for water resources development feasibility planning.

  • PDF