• Title/Summary/Keyword: open BIM

Search Result 79, Processing Time 0.019 seconds

The Study on the Development of Automatic Rebar Placement System Applying Selection Method of Optimum Reinforcing Bar Group on Shear Wall (최적배근그룹 선정방법을 적용한 전단벽체의 자동배근 시스템 개발에 관한 연구)

  • Cho, Young-Sang;Kim, Dong-Eun;Jin, Hyun-Ah;Jang, Hyun-Suk
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.1
    • /
    • pp.81-89
    • /
    • 2015
  • This study takes shear wall of reinforced concrete structure as study object, and the purpose of this study is to suggest structure BIM based on automatic reinforcing bar placement system applying set-based design through the most optimum reinforcing bar placement group that was selected by applying AHP (analytical hierarchy process) method from design step. For this, the most optimum reinforcing bar placement group was selected by pairwise comparison analysis on complex standard of multiple alternatives. And shear wall automatic reinforcing bar placement system has been developed, which can automatically generate members and arrange reinforcing bar by structure design algorithm and using open API (application programming interface) provided by a BIM software vendor. As a result, the most optimum reinforcing bar placement group of the highest weight, ALT1, was selected and was generated using Tekla Structure program.

Interoperability Analysis for BIM software Based on User-defined Properties (BIM 소프트웨어 호환성 분석 : 사용자정의 속성정보인 GBS를 중심으로)

  • Kang, Seunghee;Ha, Jiwon;Ju, Taehwan;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.99-109
    • /
    • 2016
  • The utilization of Building Information Modeling (BIM) has increased in order to enhance the integration of information for management and resources throughout the construction projects. Therefore, various BIM softwares have been used under open BIM environments in the building and plant construction industry. However, it has obstructive factors due to the lack of interoperability. In order to address this problem, this study conducted an interoperability analysis of BIM software focused on user-defined properties for enhanced function and efficiency. Result of the analysis shows that authoring tools have more interoperability problems than viewer tools and simulation tools have. In terms of interoperability, user-defined properties outperforms than those of system basic properties and logic data. Therefore, it was found that functional improvement and workload minimization in BIM can be attained by applying the GBS (an user-defined property for automatic manipulation of BIM proposed by Jung et al. 2013) that enables automatic link between geometric data and non-geometric data. In this respect, this study concludes that the application of user-defined property (e.g. GBS) can be an effective method for information integration throughout construction projects.

Construction of BIM based Building 3D Spatial Information Using Terrestrial LiDAR (지상 LiDAR를 이용한 BIM 기반 건물의 3D 공간정보 구축 연구)

  • Kim, Kyeong-Min;Lee, Kil-Jae;Cho, Gi-Sung
    • Journal of Cadastre & Land InformatiX
    • /
    • v.46 no.1
    • /
    • pp.23-35
    • /
    • 2016
  • Recently, along with the development of IT, the non-linearity and enlargement in the response to the combination of the building industry and IT have made a wide variety in outer shapes of the buildings. So buildings need a more accurate representation using visually superior three-dimensional space information. Therefore, the study models the shapes of the other buildings in accordance with the heights. Frist of all, we measured the buildings using a Terrestrial LiDAR. Second, we obtained a high-density point cloud date of the buildings. Through this data, we made the BIM model and compared the heights of each floor's outer information layers. And then identified the BIM data status using IFC standards formats. From this data, it proposes a new 3D cadastre and the alternative for the establishment of spatial information.

Improvement of Open BIM-based Building Permission Process Using EPI(Energy Performance Index) (에너지성능지표(EPI)를 대상으로 한 개방형BIM기반 건축인허가 개선방향 제시)

  • Kim, Inhan;Kim, Minchan;Choi, Jungsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.124-135
    • /
    • 2015
  • As many countries have been raising awareness of environmental issues, greater efforts for eco-friendly construction have been made in both governmental and private sectors. However, assessment circumstances for building energy performance and green building standard of legislation are still based on two dimension and handwork. This takes time, cost and labor, and makes assessment inaccurate and inefficient. Therefore, this study suggests methods to improve eco-friendly construction permission process and to automatize open BIM-based assessment of Energy Performance Index (EPI) among several eco-friendly construction certification standards. First, it analyzes the relations between assessment criteria and IFC data, and provides solutions to problems and limitations. Second, it applies the solutions to assessment program in order to automatize open BIM-based assessment for EPI. The eco-friendly construction permission process with these solutions applied will reduce time, cost, and labor by simplifying and automatizing the tasks. Also, the simplified process of design revision will improve not only productivity and efficiency but also accuracy and reliability.

A Basic Study of iBUM Development based on BIM/GIS Standard Information for Construction of Spatial Database (공간자료 구축을 위한 BIM/GIS 표준정보 기반 건축도시통합모델(iBUM)의 개발에 관한 기초연구)

  • Ryu, Jung Rim;Choo, Seung Yeon
    • Spatial Information Research
    • /
    • v.22 no.5
    • /
    • pp.27-41
    • /
    • 2014
  • Recently, BIM(Building Information Modeling) has been applied to the infrastructure such as road and bridge, and information about the outside environment of buildings is needed for maintaining and managing the large urban facilities. In addition, the convergence between spatial information and Big-data has a large potentiality, in respect that considerable profits and developments in other application problems such as various simulations and urban plans, national land security, may be brought about on the basis of the interoperability of information between BIM and GIS. Therefore, this study attempted to suggest the development direction of a model integrating building for spatial information analysis and city on the subject by comparing and analyzing difference between information system and shape expression of IFC, CityGML and LandXML to efficiently link information between IFC as a standard model of BIM and CityGML as a standard model in the GIS sector and to prepare a basic fusion strategy and a method of utilization between BIM and GIS. The result of the study are as follow. Firstly, contents and structure of IFC, CityGML and LandXML are compared and analyzed. Secondly, the development direction of iBUM(Integrated Building and Urban Model) suggested, which is based on convergence technology for analysis of space information. Finally, a strategy and method of the BIM and GIS are proposed in the iBUM environment.

Development of A Prototype for Wall Formwork Designs using Open BIM (개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발)

  • Jin, Chengquan;Kim, Hyunjoo;Hyun, Chang-Taek;Han, Sang-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.3-13
    • /
    • 2018
  • The formwork cost amounts for a significant proportion of project construction costs. It costs 10-15% of the total construction cost and 30-40% of the frame structure construction cost. In addition, the formwork collapse accidents are frequently causing deaths in the construction industry, and thus, is known to be of relatively high degree of risk. As so, the accuracy of structural calculation and quantity take-off when planning the formwork in a construction project are a very important matter. Accordingly, this study develops a BIM based formwork design prototype, that enables the construction manager to optimize the design through applying the proposed new IFC entities associated with the formwork design. The approach proposed in this study is expected to support the construction manager with accurate quantity calculation and rapid planning and construction. Since this study considered specific small-scale buildings using Euro-form and show the possibility of utilizing BIM entities in the formwork design process, further research is recommended towards the limitations in applying the system to other types of formworks.

The Improvement of Point Cloud Data Processing Program For Efficient Earthwork BIM Design (토공 BIM 설계 효율화를 위한 포인트 클라우드 데이터 처리 프로그램 개선에 관한 연구)

  • Kim, Heeyeon;Kim, Jeonghwan;Seo, Jongwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.55-63
    • /
    • 2020
  • Earthwork automation has emerged as a promising technology in the construction industry, and the application of earthwork automation technology is starting from the acquisition and processing of point cloud data of the site. Point cloud data has more than a million data due to vast extent of the construction site, and the processing time of the original point cloud data is critical because it takes tens or hundreds of hours to generate a Digital Terrain Model (DTM), and enhancement of the processing time can largely impact on the efficiency of the modeling. Currently, a benchmark program (BP) is actively used for the purpose of both point cloud data processing and BIM design as an integrated program in Korea, however, there are some aspects to be modified and refined. This study modified the BP, and developed an updated program by adopting a compile-based development environment, newly designed UI/UX, and OpenGL while maintaining existing PCD processing functions, and expended compatibility of the PCD file formats. We conducted a comparative test in terms of loading speed with different number of point cloud data, and the results showed that 92 to 99% performance increase was found in the developed program. This program can be used as a foundation for the development of a program that reduces the gap between design and construction by integrating PCD and earthwork BIM functions in the future.

An Analysis of New Urbanism Urban Design Factors in New Town -Case Study on Eunpyung New Town District 1 in Seoul - (국내신도시 사례를 통해서 본 뉴어바니즘 도시설계요소 분석 -서울시 은평뉴타운 1구역을 중심으로-)

  • Na, In-Su
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.31-38
    • /
    • 2021
  • The design principles of new urbanism (NU) have been adopted for new towns-in town projects for inner city neighborhoods in Seoul, Korea Since 2000. Here, ten NU principles were matched to four urban design categories: streets, land use, housing and buildings, and public open spaces. These elements were analyzed for Eunpyung New Town project. Through the case, the applications and implications NU principles are explored. The principles of connectivity, quality architecture and urban design, increased density, green transportation, sustainability, and quality of life were positively and successively adopted for streets, land use, housing and buildings, and public open spaces. The principles of mixed-use and diversity and traditional neighborhood structure were only partially applied in land use, housing and buildings, and public open spaces. It should be note that the walkability principle is intended not for job-housing proximity, but for pedestrian-friendly street design.

A Study on the PBL Based Teaching-Learning Model Using BIM Tools for Interior Architecture Design Studio (BIM활용 문제중심학습기반 실내건축 설계수업 교수-학습모형에 관한 연구)

  • Han, Young-Cheol
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.67-79
    • /
    • 2012
  • The purpose of this study is to suggest the interior architecture design studio through the pedagogical method of educational technology for college students who lack self-directed learning. The pedagogical method has been organized to make a student-centered class based on the operation of existing architectural design studios. This teaching and learning method emphasizes the role of teachers as facilitators to help students lacking in self-directed learning in the design process, the BIM visualization to give students an expression of design project and the critics to give students an experience of working circumstances. The results of this study can be summarized as follows. First, This pedagogical model can improve the self-directed learning of students, accomplish the design process well through teamwork, and provide problem based learning (PBL) to settle obstacles that come up during the project. Second, through this model, students can improve their field design capacity by instructor, design feedback and criticism. Finally, This model can suggest new pedagogical methods for interior architectural design studios and management of student-centered studios.