• Title/Summary/Keyword: on-line scheduling

Search Result 172, Processing Time 0.026 seconds

A deferring strategy to improve schedulability for the imprecise convergence on-line tasks (부정확한 융복합 온라인 태스크들의 스케쥴가능성을 향상시키기 위한 지연 전략)

  • Song, Gi-Hyeon
    • Journal of the Korea Convergence Society
    • /
    • v.12 no.2
    • /
    • pp.15-20
    • /
    • 2021
  • The imprecise real-time scheduling can be used for minimizing the bad effects of timing faults by leaving less important tasks unfinished if necessary when a transient overload occured. In the imprecise scheduling, every time-critical task can be logically decomposed into two tasks : a mandatory task and an optional task. Recently, some studies in this field showed good schedulability performance and minimum total error by deferring the optional tasks. But the schedulability performance of the studies can be shown only when the execution time of each optional task was less than or equal to the execution time of its corresponding mandatory task. Therefore, in this paper, a new deferring strategy is proposed under the reverse execution time restriction to the previous studies. Nevertheless, the strategy produces comparable or superior schedulability performance to the previous studies and can minimize the total error also.

A Vehicle Pickup and Deliverly Scheduling with Advance Requests Tin a 2-Echelon Supply-Chain System (2-단계 공급사슬경영 시스템에서 주문배달 및 수거를 위한 차량운송계획 모델)

  • Hwang, Heung-Suk
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.462-470
    • /
    • 2000
  • This paper is concerned with a vehicle routing model to assist in scheduling palletized cargo pickup and delivery so called the pickup and delivery problem with advance requests in a 2-echelon supply-chain system. In this study vehicles is dispatched and routed so that each request is picked up or delivered at its original and to its destination. The model provides point-to-point transportations based on advance requests. The assignment algorithm is developed and designed for using with on-line computers and it immediately provides arrangements to be made at the time requested. This algorithm also provides the best scheduling solutions and alternatives for both to system operators and requesters. According to this algorithm, we developed computer programs and show the sample results.

  • PDF

Integrating Deadline with Laxity for Real-time Scheduling in Multiprocessor Systems (다중처리기 시스템에서 데드라인과 여유시간을 통합한 실시간 스케줄링 기법)

  • 조성제
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.29 no.11
    • /
    • pp.611-621
    • /
    • 2002
  • For real-time systems, multiprocessor support is indispensable to handle the large number of requests. Existing real-time on-line scheduling algorithms such as Earliest Deadline First Algorithm (EDF) and Least Laxity Algorithm (LLA) may not be suitable for scheduling real-time tasks in multiprocessor systems. Although EDF has low context switching overhead, it suffers from "multiple processor anomalies." LLA has been shown as suboptimal, but has the potential for higher context switching overhead. Earliest Deadline Zero Laxity (EDZL) solved somewhat the problems of those algorithms, however is suboptimal for only two processors. Another algorithm EDA2 shows very good performance in overload phase, however, is not suboptimal for muitiprocessors. We propose two on-line scheduling algorithms, Earliest Deadline/Least Laxity (ED/LL) and ED2/LL. ED/LL is suboptimal for multiprocessors, and has low context switching overhead and low deadline miss rate in normal load phase. However, ED/LL is ineffective when the system is overloaded. To solve this problem, ED2/LL uses ED/LL or EDZL in normal load phase and uses EDA2 in overload phase. Experimental results show that ED2/LL achieves good performance in overload phase as wet] as in normal load phase.oad phase.

A cell scheduling of a logically separated buffer in ATM switch (ATM 스위치에서 논리적으로 분할된 버퍼의 셀 스케쥴링)

  • 구창회;나지하;박권철;박광채
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.8
    • /
    • pp.1755-1764
    • /
    • 1997
  • In this paper, we proposed the mechanism for the buffer allocation and a cell scheduling method with logical separation a single buffer in the ATm switch, and analyzed the cell loss probability and the delay of each trafic (CBR/VBR/ABR) based on the weighted value and the dynamic cell service scheduling algorithm. The proposed switch buffering system classifies composite trafics incoming to the switch, according to the characteristic of traffic, then stores them in the logically separated buffers, and adopts the round-robin service with weighted value in order to transmit cells in buffers though one output port. We analyzed 4 cell service scheduling algorithms with dynamic round-robinfor each logically separated service line of a single buffer, in which buffers have the respective weighted values and 3 classes on mixed traffic which characteristized by traffic descriptor. In simulation, using SIMCRIPT II.5., we model the VBR and the ABR traffics as ON/OFF processes, and the CBR traffic as a Poisson processes. As the results of analysis according to the proposed buffer management mechanism and cell service algorithm, we have found that the required QoS of each VC can be quaranteed depends on a scale of weighted values allocated to buffers that changed the weighted values, and cell scheduling algorithm.

  • PDF

A Study on the Reliability Improvement of the Integrated System and Sensitivity Analysis for Line Capacity (선로용량 산정과 민감도 분석의 신뢰성 향상에 관한 연구)

  • Kim Moo-Ryong;Kim Han-Xin;Lee Chang-Ho;Kim Bong-Sun;Kim Dong-Hee;Hong Soon-Hum
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.4
    • /
    • pp.207-217
    • /
    • 2005
  • Line capacity calculation has been used to determine optimum efficiency and safe train service for train scheduling plan and investment priority order throughout detecting bottleneck section. Because of some problems of Yamagisi and UIC methods for line capacity calculation, developing of the method of line capacity caculation and evaluation for the Korea circumstance is important. This paper deals with the reliability improvement on the integrated system of TPS(Train Performance Simulator), PES(Parameter Evaluation Simulator), LCS(Line Capacity Simulator) and simulation and sensitivity analysis for line capacity.

Case Study on the continuous pickup and delivery vehicle routing problem in Multi-level Logistic Network based on S automobile Part Logistics Process (다단계 물류 네트워크에서 A/S 부품 집화 및 배송이 연속적으로 발생하는 문제에 관한 사례연구 -자동차 부품 물류 프로세스를 중심으로-)

  • Song, Jun-Woo;Kim, Kyung-Sup;Jeong, Suk-Jae
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.2
    • /
    • pp.193-204
    • /
    • 2013
  • The growing logistics strategy of a company is to optimize their vehicle route scheduling in their supply chain system. It is very important to analyze for continuous pickups and delivery vehicle scheduling. This paper is a computational study to investigate the effectiveness of continuous pickups and delivery vehicle routing problems. These scheduling problems have 3 subproblems; Inbound Vehicle Routing Problem with Makespan and Pickup, Line-haul Network Problem, and Outbound Vehicle Routing Problem with Delivery. In this paper, we propose 5 heuristic Algorithms; Selecting Routing Node, Routing Scheduling, Determining Vehicle Type with Number and Quantity, and Modification Selecting Routing Node. We apply these Algorithms to S vehicle company. The results of computational experiments demonstrate that proposed methods perform well and have better solutions than other methods considering the basic time and due-date.

Volume Rendering using Grid Computing for Large-Scale Volume Data

  • Nishihashi, Kunihiko;Higaki, Toru;Okabe, Kenji;Raytchev, Bisser;Tamaki, Toru;Kaneda, Kazufumi
    • International Journal of CAD/CAM
    • /
    • v.9 no.1
    • /
    • pp.111-120
    • /
    • 2010
  • In this paper, we propose a volume rendering method using grid computing for large-scale volume data. Grid computing is attractive because medical institutions and research facilities often have a large number of idle computers. A large-scale volume data is divided into sub-volumes and the sub-volumes are rendered using grid computing. When using grid computing, different computers rarely have the same processor speeds. Thus the return order of results rarely matches the sending order. However order is vital when combining results to create a final image. Job-Scheduling is important in grid computing for volume rendering, so we use an obstacle-flag which changes priorities dynamically to manage sub-volume results. Obstacle-Flags manage visibility of each sub-volume when line of sight from the view point is obscured by other subvolumes. The proposed Dynamic Job-Scheduling based on visibility substantially increases efficiency. Our Dynamic Job-Scheduling method was implemented on our university's campus grid and we conducted comparative experiments, which showed that the proposed method provides significant improvements in efficiency for large-scale volume rendering.

A Scheduling Scheme for Flexible Flow Shop with Release Date and Due Date (시작시기와 납기를 고려하는 유연흐름공장의 일정계획)

  • Lee, J.H.;Kim, S.S.
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.1-13
    • /
    • 1998
  • This paper addresses a scheduling scheme for Flexible Flow Shop(FFS) in the case that a factory is a sub-plant of an electronic device manufacturing plant. Under this environment, job orders for the sub-plants in the production route are generated together with job processing time bucket when the customer places orders for final product. The processing time bucket for each job is a duration from possible release date to permissible due date. A sub-plant modeled FFS should schedule these jobs orders within time bucket. Viewing a Printed Circuit Board(PCB) assembly line as a FFS, the developed scheme schedules an incoming order along with the orders already placed on the scheduled. The scheme consists of the four steps, 1)assigning operation release date and due date to each work cells in the FFS, 2)job grouping, 3)dispatching and 4)machine allocation. Since the FFS scheduling problem is NP-complete, the logics used are heuristic. Using a real case, we tested the scheme and compared it with the John's algorithm and other dispatching rules.

  • PDF

A Comparative Study of Dynamic Dispatching Rule for Machine and AGV of Flexible Manufacturing System (유연생산시스템의 기계와 AGV의 동적 작업배정규칙 비교연구)

  • Lee, Sung-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.12 no.1
    • /
    • pp.19-25
    • /
    • 2009
  • We suggest and evaluate a dynamic scheduling rule of machines and material handling systems for on-line operation in job shop type Flexible Manufacturing System. Alternating status should be able to take operation scheduling procedures and without delay in dynamic industrial environments effectively. The interaction(SPT-NS, SPT-QSNS, SPT-NUJ, EDD-NS, EDD-QSNS, EDD-NUJ, CR-NS, CR-QSNS, CR-NUJ) between machine operation scheduling and AGV dispatching rule were also studied in this research. The performance evaluation which was obtained from DSS compares the performance of Flow time, and Empty to loaded travel ratio. It is Compared with the best rules & two system.

  • PDF

Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB (동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론)

  • Min, Gyu-Tae;Lee, Hong-Chu;Li, Xian-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF