• Title/Summary/Keyword: office building remodeling projects

Search Result 8, Processing Time 0.029 seconds

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

Searching for Core Project Management Issues in Remodeling Projects : Focus on office building remodeling projects (리모델링 프로젝트의 사업관리 현안 발굴 연구 : 오피스빌딩 리모델링 사업을 대상으로)

  • Seo Hee-jun;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.220-223
    • /
    • 2004
  • Remodelling projects have recently emerged as an alternative construction market. Due to the limited experience of such projects, repetitive mistakes and failures in project management become concerns for those in the market sector. The objective of this paper to report preliminary findings in relation to core project management issues in office remodelling projects based on literature review and expert interviews.

  • PDF

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

An Economic Evaluation Study of Office Remodeling and Green-remodeling Projects : A Simulation Approach to a Rental Office in GBD, Seoul (생애주기를 고려한 오피스 건물의 리모델링과 그린리모델링의 경제성 평가 연구 : 서울시 강남업무지구의 임대오피스 사례)

  • Lee, Seong-Ho;Lee, Jae-Su
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.23-34
    • /
    • 2018
  • Due to a waste of energy in korea, about 525,000 which are 75 percent of total buildings are at least 15 years old buildings that need remodeling. There are two current remodeling systems. One is a remodeling system to reduce a waste of resources from the reconstruction. The other is a green-remodeling system aimed to energy savings and reducing environmental costs. This study is to analyze quantitatively these current systems with respect to the cost-benefit caused by the life cycle and suggests the political and institutional implications through the interpretation of the results. For a quantitative analysis, we analyzed reducing maintenance costs and rent benefits with simulation by using opportunity costs, construction costs, plan costs and supervision costs as expense variables and using the reduced floor area ratio, institutional incentives, energy, water resources and certified emission reduction(CER) as benefit variables. As a result of the empirical study, the green-modeling was more beneficial in the field of environment such as the energy savings, however, the final benefits of remodeling which has no green building certification costs but more floor area ratio incentives were more economical. The green-remodeling system focused on reducing environmental costs and energy savings needs a equatable institutional incentive system.

A study on the development of a web-based cost management system of building interior projects (웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구)

  • 송영규
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.3
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

A Study on Supporting Design Decision Making in Office Building Remodeling Projects by Introducing Mixed Reality (혼합현실 도입 오피스 건물 리모델링 프로젝트 설계 의사결정 지원)

  • Han, Mooyeul;Baek, Kwanyup;Lee, Kyung-Tae;Ko, Seonju;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.3-12
    • /
    • 2021
  • In the remodeling projects, clients without architectural expertise have limitations in presenting requirements accurately. In some cases, designers and contractors may not recognize their demands exactly, and deliver final products that are different from the clients' intentions. 3D modeling visualizing final products in previous has been regarded as a solution to enhance understanding and communication. However, this approach has the limitation that the final results are presented as a virtual outputs. In the remodeling project, an alternative, mixed-reality, is likely to reinforce the reality as it enables to present remain structure and the parts to be built together. This paper examines the mixed reality as a solution to support decision making of clients and practitioners in remodeling projects. The examinations is conducted in high-rise office remodeling projects by means of action-research. Clients and practitioners, overview product models presented in the format of 2D drawings, BIM and mixed reality asked to evaluate the effectiveness of each methods in 12 standards. The results have shown that mixed reality has improved the sense of reality, making it easier to predict results, but recognizing patterns is difficult in some areas such as the floor, and it caused dizziness.

Stepwise Technique for Improving Building Energy Efficiency Rating Utilizing Quantified Simulation Model (정량화 시뮬레이션 모델을 활용한 단계적인 건축물에너지효율등급 향상 방안)

  • Kim, Gi-Seok;Kim, You-Min;Kim, Jong-Seung;Oh, Se-Gyu
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.65-73
    • /
    • 2014
  • Due to the Climate change and resource shortage by global warming, various problems are rising and getting worse around the world. Many countries are doing the considerable efforts to reduce greenhouse gas emissions. The government of South Korea also plans to decrease greenhouse gas emission, the various pilot projects are underway, which includes obligation of energy efficiency 1st rating and greenhouse gas target management system of public buildings. In particular, luxurious government office buildings and energy-wasting public building have issued and emerged as a social problem. Energy efficiency improvement of the existing public office buildings are becoming an important issue recently. This study is proposed the step-by-step energy improvement model according to the building energy efficiency rate in order to reduce the energy consumption. To attain this end, I set up a base model by analyzing the current architectural conditions of the existing public office buildings and grasped the specific properties of building energy consumption through energy simulations. Furthermore, I suggested phased reduction prototypes for the reduction target of energy consumption by applying the methods of the zero energy building plan. This study is expecting that prototypes would give directions when it comes to planning the implementation policy of phased building plan factors, according the building energy consumption reduction goal in the existing public office buildings which are the subject of building energy target management system.

POE of Toilet of Elementary School in Rural Area (농촌지역 초등학교 화장실의 거주후 평가 연구 -H군의 D초등학교를 중심으로)

  • Han, Jong Koo;Park, Tong So
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.9 no.1
    • /
    • pp.9-16
    • /
    • 2007
  • Educational Facility has a specialty that similar design is repeatedly taken place so the importance of POE(Post Occupancy Evaluation) is increased for the improvement of problem appeared at the former projects. The POE could provides help to the design of next project and the direction when the need of remodeling is faced. Through the process of POE, the repeat of design mistakes could be prevented and the good information related with building efficiency and other problems could be applied to the design of next school project . In this study, the POE of Manbalro(barefoot) toilet of D Elementary school in rural area of H county is performed. The toilet is renovated as an educational environment improvement project of H county educational office in Chungcheong Namdo Province. The study is focused on the user's behavior at Manbalro toilet for carrying out indicative POE by the subjective response of user's. From the research, several being reformed items is proposed however the toilet is evaluated as a successful project that design purpose of initial stage is applied well.

  • PDF