• Title/Summary/Keyword: observations and recommendations

Search Result 42, Processing Time 0.019 seconds

관찰 및 추천에 의한 영재교육대상자 선발방식 분석 - 2011학년도 대학부설 과학영재교육원 입학전형을 중심으로 -

  • Kwon, Ern-Gun;Jo, In-Seo
    • East Asian mathematical journal
    • /
    • v.28 no.2
    • /
    • pp.215-232
    • /
    • 2012
  • The methods of selection through observations and recommendations were introduced in the process of recruiting new students for the science education institutes for the gifted attached to 25 universities recently. This paper itemized the methods of screening through observations and recommendations. This paper also analyzed the problems with the methods and attempted to create plans for their improvement. The methods of selection through observations and recommendations led to the positive results that students' usual activities and attitudes in the classroom were reflected on the evaluation and that the cost of their private lessons was also reduced. However, the methods showed a few problems that need to be corrected. We point out problems occurring with examining their documents for submission and interviews. It was not easy to grade candidates' gifts, creativity, potential and development within the contents of the documents and the limited time of conducting interviews. On the plans for the developments of the implemented methods of selection through observations and recommendations, we have several suggestions. The chances for teachers' in-service training of learning the methods of selection through observations and recommendations need to be expanded. The interview needs to be enhanced and to have the same weight as the document screening. To secure the continuity of the education for the gifted, the clear guidelines from the Ministry of Education, Science, Technology along with the cooperation of the education institutes for the gifted are essential.

Observation of Three Variable Stars and an Asteroid Using Small Telescopes in the United Arab Emirates (UAE)

  • Mohammad Sh. Odeh;Mashhoor Al-Wardat
    • Journal of Astronomy and Space Sciences
    • /
    • v.40 no.1
    • /
    • pp.19-27
    • /
    • 2023
  • We present the results of using small telescopes in the United Arab Emirates (UAE) for observing variable stars and asteroids. Two telescopes, namely, 5" apochromatic refractor and 14" Schmidt-Cassegrain, at Al-Khatim Observatory (M44) were used for the observations. The targets were the three variable stars RR GEM, AG LMi, and DL CMi and the asteroid 22 Kalliope. We found a good consistency between our light curves and published ones for the calibration targets, i.e., the asteroid 22 Kalliope and the variable star RR GEM. According to previous studies, AG LMi has two suggested periods, 16.3 hours and 32.62 hours. Our results clearly confirm the second one, with a period of 32.6175 hours. The star DL CMi has several suggested periods as per previous studies, such as 4.0173 days, 1.9606 days, and 2.0086 days. Our observations confirm the first one, with a period of 4.0159 days. These results demonstrate the effectiveness of using small telescopes for observing variable stars and asteroids. This work provides some recommendations on using small telescopes for such observations.

Difference on Identification of Gifted Students by Level of Perception of Teacher's Professionalism in Gifted Education (영재관찰추천 과정에서 담임교사의 영재교육전문성 인식 수준에 따른 영재판별의 차이)

  • Ko, Min-Seok;Park, Byoung-Tai
    • Journal of Gifted/Talented Education
    • /
    • v.21 no.2
    • /
    • pp.427-447
    • /
    • 2011
  • This research looked into the recognitions of a teacher's discernment & recommendations of gifted elementary students targeting 184 elementary school teachers in Seoul district and compared and contrasted their awareness in order to confirm whether there existed a difference in the discernment of gifted elementary students according to their awareness level of professionalism in gifted and talented education. The research results are as follows: There appeared a significant difference in teachers' recognitions level of professionalism in gifted education according to their experience relevant to a gifted elementary student. The teachers, in the process of observations & nominations of gifted elementary students, pointed out creativity, learning motive and attitude as the highest judging standard and also regard such elements as discerning criteria of gifted students. In the process of observations & nominations of gifted elementary students, it was found that teachers' recognitions of importance of discerning criteria of gifted elementary students in relation to parents or fellow teachers' recommendations appeared relatively lower than their recognitions of importance in relation to learning ability, creativity, learning motive and attitude. The research results showed that a group of teachers, who have a high recognitions level of the professionalism in gifted education in the process of observations & nominations of gifted students, perceive the realm of creativity, learning motive, and attitude as more important. This suggests the necessity of elevating teachers' awareness level of professionalism in gifted and talented education in order to discern high-quality gifted students in the process observations & nominations of gifted elementary students putting emphasis on the realm of creativity, learning motive, and attitude.

Behaviour of cold-formed steel hollow and concrete-filled members

  • Jane Helena, H.;Samuel Knight, G.M.
    • Steel and Composite Structures
    • /
    • v.5 no.1
    • /
    • pp.35-47
    • /
    • 2005
  • This paper presents the results of a series of tests carried out on hollow and concrete-filled coldformed steel sections subjected to axial and bending forces. The effects of eccentricity ratio and strength of in-fill on the behaviour of these sections were studied. A total of forty-eight medium sized columns and six beams were tested to failure. Extensive measurements of material properties, strains, axial shortening and lateral deflection were carried out. Interaction of local and overall buckling was observed in the tests. Failure mode observations were local buckling coupled with overall buckling. A description of the specially fabricated end fixtures for applying eccentric loading to the columns and to simulate pinned end condition is also presented. The experimental results of hollow columns are compared with the existing Indian, British and American codes of practice and the results of concrete-filled columns are compared with EC4 recommendations. It is seen that in the case of hollow columns predictions based on British and American codes of practice and in the case of concrete-filled columns predictions based on EC4 recommendations agree reasonably well with the experimental results. From the experiments it is seen that the provision of in-fill substantially increases the ultimate load carrying capacity of the order of one and a half to two times and the increase in strength of the in-filled concrete from a low grade concrete of compressive strength 24.94 MPa to a high grade concrete of compressive strength 33.26 MPa increases the ultimate load carrying capacity by one and a half times irrespective of the eccentricity of loading.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Analysis of Basic Emergency Obstetric and Neonatal Care (PONED) Services in Baso Public Health Center, Indonesia: Recommendations from Qualitative Interviews

  • Hasnita, Evi
    • Asian Journal for Public Opinion Research
    • /
    • v.3 no.3
    • /
    • pp.131-144
    • /
    • 2016
  • One of the main indicators of the health status of a country is the Maternal Mortality Rate (MMR). In order to improve the MMR in Indonesia, the government has made a number of primary health centers (PHC) capable of providing basic obstetric and neonatal emergency care (PONED) services. The aim of this research is to learn how well PONED services have been implemented at the Baso PHC in Agam Regency as of 2015. We used a qualitative approach, with in-depth interviews and observations from June-August 2015. Ten respondents participated in the in-depth interviews, and observations were made about the infrastructure. The validity of the data is based on the standard of credibility, transferability, dependability, and confirmability of the content of the interviews. The analysis shows that there are still some obstacles in PONED PHC implementation, including the lack of human resources at the PHC and insufficient facilities, funding, and oversight, which causes many cases that should be handled by a PONED team to be referred to the hospital. Suggestions are provided to help improve policies and ultimately patient care.

Computational procedures for exponential life model incorporating Bayes and shrinkage techniques

  • Al-Hemyari, Zuhair A.;Al-Dabag, H.A.;Al-Humairi, Ali Z.
    • International Journal of Reliability and Applications
    • /
    • v.16 no.2
    • /
    • pp.55-79
    • /
    • 2015
  • It is well known that using any additional information in the estimation of unknown parameters with new sample of observations diminishes the sampling units needed and minimizes the risk of new estimators. There are many rational reasons to assure that the existence of additional information in practice and there exists many practical cases in which additional information is available in the form of target value (initial value) about the unknown parameters. This article is described the problem of how the prior initial value about the unknown parameters can be utilized and combined with classical Bayes estimator to get a new combination of Bayes estimator and prior value to improve the properties of the new combination. In this article, two classes of Bayes-shrinkage and preliminary test Bayes-shrinkage estimators are proposed for the scale parameter of exponential distribution. The bias, risk and risk ratio expressions are derived and studied. The performance of the proposed classes of estimators is studied for different choices of constants engaged in the estimators. The comparisons, conclusions and recommendations are demonstrated.

Wind-induced dynamic response of recessed balcony facades

  • Matthew J. Glanville;John D. Holmes
    • Wind and Structures
    • /
    • v.38 no.3
    • /
    • pp.193-202
    • /
    • 2024
  • Modern high-rise tower designs incorporating recessed balcony cavity spaces can be prone to high-frequency and narrow-band Rossiter aerodynamic excitations under glancing incident winds that can harmonize and compete with recessed balcony volume acoustic Helmholtz modes and facade elastic responses. Resulting resonant inertial wind loading to balcony facades responding to these excitations is additive to the peak design wind pressures currently allowed for in wind codes and can present as excessive facade vibrations and sub-audible throbbing in the serviceability range of wind speeds. This paper presents a methodology to determine Cavity Amplification Factors to account for façade resonant inertial wind loads resulting from balcony cavity aero-acoustic-elastic resonances by drawing upon field observations and the results of full-scale monitoring and model-scale wind tunnel tests. Recessed balcony cavities with single orifice type openings and located within curved façade tower geometries appear particularly prone. A Cavity Amplification Factor of 1.8 is calculated in one example representing almost a doubling of local façade design wind pressures. Balcony façade and tower design recommendations to mitigate wind induced aero-acoustic-elastic resonances are provided.

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

Effect of tornadoes on residential masonry structures

  • Pinelli, J.P.;O'Neill, S.
    • Wind and Structures
    • /
    • v.3 no.1
    • /
    • pp.23-40
    • /
    • 2000
  • In the early morning hours of February 23rd, 1998, seven large tornadoes ravaged central Florida. A total of 42 people were killed and millions of dollars of damage was done. A strip mall and other commercial structures sustained considerable damage and several residential areas were completely destroyed. Based on field observations, the paper examines the causes and sequence of structural failure for the masonry single family homes. Wind speeds are estimated based on the observed damage, and compared to the meteorological data. Finally, recommendations are given that could help to eliminate or reduce similar failures in the future. It was found that with simple, cost effective measures, most if not all of the damage could have been prevented.