• Title/Summary/Keyword: noise barrier

Search Result 292, Processing Time 0.129 seconds

A study on the highway traffic noise characteristics for the design of noise barrier (방음벽 설계를 위한 고속도로 소음 특성에 관한 연구)

  • Yoon, Je-Won;Lee, Hong-Ki;Ryu, Kuk-Hyun;Kang, Huy-Man;Jang, Tae-Soon;Park, Yang-Hum
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.758-761
    • /
    • 2005
  • 본 연구에서는 고속도로 발생 소음특성을 측정하여 방음벽 설계 인자를 도출하기 위함이다. 이를 위해 인터체인지 및 영업소 인접부를 포함한 총 20개소를 선정하여 소음측정을 수행하였으며, 소음원의 주파수특성 및 일일 변동특성, 노면 종류에 따른 소음발생특성, 영업소 및 인터체인지 부근에서의 소음특성을 분석하여 방음벽 설계 인자를 도출하였다.

  • PDF

The study on the management method and installation guide of temporary noise barrier (가설방음벽의 운영방안 및 설치기준에 관한 연구)

  • Yoon, Je-Won;Kim, Young-Chan;Kang, Hee-Man;Jang, Tae-Soon;Lee, Ki-Jung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.372-375
    • /
    • 2006
  • 건설 공사장에서 발생하는 건설장비의 소음을 저감하여 공사장 인근 지역의 생활환경에 미치는 소음영향을 최소화할 수 있도록 건설업체에서는 최대한의 노력으로 가설방음벽을 설치 운영하고 있으나, 설치된 가설방음벽의 효과분석 및 운영방법에 대한 검토가 부족하여 효율적인 소음저감대책으로서의 가설방음벽 운영이 어려운 실정이다. 따라서, 본 연구에서는 가설방음벽의 기초데이터의 확보와 소음해석을 통한 효율적인 운영방안을 제시하며, 설치기준에 관한 방안을 제시하고자 한다.

  • PDF

Evaluation of low cost electret microphone performances for active noise control barriers

  • Troshin, Andrey G.;Cha, Sang-Gon;Kim, Dong-Hwan;Shin, Eun-Woo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.10a
    • /
    • pp.115-119
    • /
    • 2011
  • Instead of very expensive sound record and professional measurement microphones the low cost Surface Mounted Device (SMD) microphones are proposed for practical barrier ANC system. FRF of the microphones and theirs sensitivity to the wind interferences are evaluated in semi anechoic chamber. The improvement of feedforward algorithm noise reduction index was evaluated based on measured coherence function between tested SMD and reference microphone. Test was performed at various wind speed from 1 m/s to 5 m/s.

  • PDF

A Study on the Development of a Noise Reduction Device Installed at the Top of Noise Barrier for the 400 km/h Class High-speed Railroad (400 km/h급 고속철도의 소음저감을 위해 방음벽 상부에 설치하는 소음저감장치 개발에 관한 연구)

  • Yoon, Je-Won;Kim, Young-Chan;Jang, Kang-Seok;Hong, Byung-Kook;Eum, Ki-Young
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.9
    • /
    • pp.823-830
    • /
    • 2013
  • The purpose of this study is to develop a noise reduction device installed at the top of noise barrier for further decreasing of noise level of 400 km/h class high-speed railroad. For this, the frequency spectrum of 400 km/h class high-speed railroad was analyzed through the field noise test, and the tuning frequency was determined to design a noise reduction device. The noise reduction device was designed to have noise reduction performance of at least 3 dB(A) using the prediction method(2D BEM) and through the laboratory test with the prototype. Finally, the outdoor test showed that this device could decrease noise level of 400 km/h class high-speed railroad even more than 3 dB(A).

Environmental Noise Prediction and Countermeasures for Packaged Power Station (육상용 디젤엔진 발전플랜트의 환경소음 영향 평가 및 저감 대책)

  • Song, Keun-Bok;Kim, Won-Hyun;Kim, Dong-Hae;Bae, Jong-Gug
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.6-11
    • /
    • 2007
  • Packaged power station (PPS) is a stationary diesel engine generator set and developed for the supply of electric power to small villages, islands and factories etc. Therefore, the PPS is closely installed to residence area and sometimes cause the environmental noise problems. In this paper, environmental noise analysis was performed for the power plant with 28 sets of PPS. The initial analysis results showed the some difference between the measurement and analysis because of the inaccurate noise source data. To improve the accuracy of analysis, main noise sources were inversely estimated using the in-situ measurement data in the vicinity of PPS and steam boiler. As the results of re-analysis, the good agreement was obtained and it was concluded that the noise levels exceed the specified noise limit in residence area. In order to reduce the noise, the several methods such as geometry alteration of inlet duct, application of hybrid-type silencer and noise protection barrier were suggested and verified with the confirmed analysis model.

  • PDF

A study on Fairing System for Traveling Noise Reduction in Urban Subway (도시철도 운행소음 저감용 훼어링시스템 연구)

  • Choi, Sang-Chun;Jang, Won-Rak;Ho, Kyoung-Chan
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.659-666
    • /
    • 2009
  • As the density and height of the buildings nearby subway lines get higher, the unprecedented residents' appeals for noise are on the rise. Furthermore, in accordance with the revision of enforcement regulations on the Noise and Vibration Control Act, the night time noise standards have been reinforced by 5dB effective on January 1st 2010 and the appropriate measures shall be taken accordingly. For the settlement of the public grievances against noise and vibration generated on tracks in at-grade and elevated section, the installation of continuously-welded-rail, rail lubrication system, improved fastening system and higher noise barrier is currently executed. Nevertheless, the noise and vibration levels in some areas are still exceeding the limits required in the regulation. Among the measures, an installation of higher noise barrier or noise tunnel seems to be the most effective way; however, it has limitations owing to the structural stability of existing elevated structures. The paper in consideration of the local conditions and foreign practices discusses the installation of fairing system under the train body as an noise insulation panel in order to reduce the rolling noise and under-carriage noise. Based on the result of this study, a performance verification test during actual train operation is in progress for further study.

  • PDF