• Title/Summary/Keyword: national rail network

Search Result 62, Processing Time 0.02 seconds

Railway Timetable Considering Optimal Path Finding Method in Rail Network (Focused on Revenue Allocation) (열차스케줄을 고려한 도시철도 이용객의 통행행태 추정 (수입금 정산사례를 중심으로))

  • Lee, Chang-Hun;Shin, Seong-Il;Kim, Si-Gon
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.2
    • /
    • pp.149-156
    • /
    • 2015
  • It is necessary to determine real path for urban railway users in order to allocate revenues between urban railway organizations. Out of several algorithms used to determine optimal routes, the k-path algorithm based on link-label has been utilized. However, this k-path algorithm has certain flaws. For example, optimal route can change depending on the travel and walking time, transfer penalty, and so on. Also, this algorithm cannot take into account the characteristics of users, who prefer express train to normal trains. In this paper, an algorithm is proposed to determine one single optimal route based on the traffic card data. This method also can search for an optimal path in conjunction with the railway timetable.

Development of an Optimization Model and Algorithm Based on Transportation Problem with Additional Constraints (추가 제약을 갖는 수송문제를 활용한 공화차 배분 최적화 모형 및 해법 개발)

  • Park, Bum Hwan;Kim, Young-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.6
    • /
    • pp.833-843
    • /
    • 2016
  • Recently, in the field of rail freight transportation, the number of trains dedicated for shippers has been increasing. These dedicated trains, which run on the basis of a contract with shippers, had been restricted to the transportation of containers, or so called block trains. Nowadays, such commodities have extended to cement, hard coal, etc. Most full freight cars are transported by dedicated trains. But, for empty car distribution, the efficiency still remains questionable because the distribution plan is manually developed by dispatchers. In this study, we investigated distribution models delineated in the KTOCS system which was developed by KORAIL as well as mathematical models considered in the state-of-the-art. The models are based on optimization models, especially the network flow model. Here we suggest a new optimization model with a framework of the column generation approach. The master problem can be formulated into a transportation problem with additional constraints. The master problem is improved by adding a new edge between the supply node and the demand node; this edge can be found using a simple shorted path in the time-space network. Finally, we applied our algorithm to the Korean freight train network and were able to find the total number of empty car kilometers decreased.

Experimental Assessment for the Effect of Burial Depth on the Formation of Underground Cavities and Ground Cave-ins by Damaged Sewer Pipes (하수관 손상으로 인한 지하공동 및 지반함몰 발생에 대한 하수관 매립심도 영향의 실험적 평가)

  • Kwak, Tae-Young;Chung, Choong-Ki;Kim, Joonyoung;Lee, Minho;Woo, Sang-Inn
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.11
    • /
    • pp.37-49
    • /
    • 2019
  • In order to analyze the effect of burial depth on the generation of ground cavities and cave-ins, a series of model experiments with different height of model ground were performed. Digital images of the model ground were captured to evaluate the internal deformation of the model grounds by adopting the PIV (Particle Image Velocimetry) technique. Additionally, the vertical displacement at the surface, the size of the cavity, and the weight of the discharged soil were measured in each test. The results indicate that the model ground with low burial depth, which does not satisfy the criterion, was more vulnerable to ground cavities and cave-ins than the model ground with high burial depth.

A Study on the Dynamic Characteristics on the Test Line for Korean High Speed Train (한국형 고속전철의 주행진동 특성에 관한 연구)

  • 김영국;김석원;박찬경
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.555-560
    • /
    • 2003
  • Korean High Speed Train(KHST) has been tested on the high speed test line in Osung site of Korea High Speed Rail Construction Authority (KHRC). since it was developed as G7 Project Plan In 2002. This paper introduces the dynamic test devices in KHST and shows the comparison between the results of test and theoretical computing results which derive from the new model for KHST dynamic behavior. Previous computer simulation model for KHST was developed to review wether the vehicle system was satisfied with the dynamic performance requirements during the design procedure. But It should be applied the results of the parts test for suspension elements in order to compare between the results of computation and real test. Using VAMPIRE Program made by AEA Technology in UK. the new model also was modified. This paper shows that the static wheel loads calculated from new model is similar to test results. For test on high speed line, we prepared the test devices for evaluating the dynamic performances. which was consisted of the accelerometers( based on Kisler Co.) and the data aquisition systems (based on National instrument Co.), and test program coded by LabView 6i program. These lest devices and programs are flexible to extension the channels for adding sensors and connect to the ethernet network. The acceleration of car bodies, bogie frames and axle boxes were compared between the results of computation and test at 150km/. This paper shows that the results of test were high in high frequency band range but similar frequency band range. It might be considered that these differences were caused by the test which did not performed at constant speed for comparison analysis. Also. It will be able to understand the differences and make better results through a lot of tests planed in future.

  • PDF

Numerical analysis for semi cut and cover tunnelling method (반개착식 터널 공법에 관한 수치 해석적 연구)

  • Roh, Byoung-Kuk;Park, Jong-Kwan;Baek, Seung-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.113-122
    • /
    • 2013
  • Recently there has been increased interest for the portal and shallow tunnel for an eco-friendly tunneling method. Semi cut & cover tunnel excavation techniques applied to concrete slab and construction and a growing number of cases, but there is no load combinations and arch concrete cross section for the applicable standards. Therefore, in this study, ground conditions and tunnel overburden thickness, thickness of backfill, overburden surface slope angle changes to a variety of conditions in order to propose standards for the semi cut & cover method was performed numerical analysis. Regression analysis method to the analysis of the results of numerical analysis, and linear regression equations derived to classify and organize a rational, economical, and safe semi cut & cover tunneling method based proposed.

Estimation of Groundwater Storage Change and Its Relationship with Geology in Eonyang Area, Ulsan Megacity (울산광역시 언양지역의 지하수 저류 변화량 산정 및 지질과의 관련성)

  • Kim, Nam-Hoon;Hamm, Se-Yeong;Kim, Tae-Yong;Cheong, Jae-Yeol;An, Jeong-Hoon;Jeon, Hang-Tak;Kim, Hyoung-Soo
    • The Journal of Engineering Geology
    • /
    • v.18 no.3
    • /
    • pp.263-276
    • /
    • 2008
  • In diverse hydrogeologic fields, estimation of groundwater storage change is one of the most critical issues. Accurate estimation methods for determining groundwater storage change are required more and more. For Yeonyang area of Ulsan Megacity, groundwater storage change was estimated by using water balance method and hydrogeological analyses. The estimates of groundwater storage change was 240 mm corresponding to 18.7% of mean annual precipitation. Direct runoff was calculated as 137 mm (10.6% of mean annual precipitation) by using SCS-CN method. Evapotranspiration based on the Thornthwaite method was calculated as 776 mm (60.5% of mean annual precipitation). Hydraulic properties of the soil types do not show any distinct relation with hydraulic conductivity of the rocks. This fact suggests that hydraulic property on the surface is different from that of subsurface geology. According to multi-linear regression analysis between groundwater storage change and hydraulic parameters, a regression equation of groundwater storage change, which was explained by precipitation and evapotranspiration, was established.

Estimation of Groundwater Recharge in Junggwae-Boeun Area in Ulsan City Using the Water Balance and Hydrogeological Analyses (물수지 및 수리지질 분석을 통한 울산광역시 중괘천-보은천 지역의 지하수 함양량 산정)

  • An, Jeong-Hoon;Hamm, Se-Yeong;Lee, Jeong-Hwan;Kim, Nam-Hoon;Yang, Dae-Bok;Hwang, Jee-Gwang
    • Economic and Environmental Geology
    • /
    • v.41 no.4
    • /
    • pp.427-442
    • /
    • 2008
  • Estimation of groundwater recharge is one of the most critical issues in sustainable management of groundwater resources. This study estimated groundwater recharge in the Junggwae-Boeun area in Ulsan City, by using the water balance and hydrogeological characteristics of geology and soil. Evapotranspiration was computed by using the Thornthwaite method, and direct runoff was determined by using the SCS-CN technique. Groundwater recharge was obtained as 266 mm/a (20.6% of the average annual precipitation, 1296 mm/a), with 779 mm/a (60.1%) of evapotranspiration and 119 mm/a (9.2%) of direct runoff. Precipitation and groundwater recharge was highly correlated, comparing with the relationships between precipitation and evapotranspiration, and between precipitation and direct runoff. This fact indicates that groundwater recharge responds more sensitively to precipitation than evapotranspiration and direct runoff do.

Evaluation of the environmental and ecological value indicators for railway development area selection (철도개발지 선정을 위한 환경·생태적 가치 지표 평가)

  • Kim, Min-kyeong;Kim, Dong Yeob
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.2
    • /
    • pp.105-113
    • /
    • 2017
  • Recently mountain tourism has been promoted and introduction of railroads with utilizing mountain resources is being planned. With the government policies to increase the share of eco-friendly transportation on railroad, national double-tracking of single rail and improvement projects are on going. However, the eco-friendly railroad policy suggests the environmental impact assessment items only on air quality, water quality, geographical/geological features, fauna/flora, natural/environmental resources, noise/ vibration, and recreation/landscape. And for fauna/flora and natural/environmental resources, confirming the presence of environmental protection zone is enough to satisfy legal requirement. This study suggested to evaluate environmental/ecological values with quantitative data. Evaluation indices and evaluation items have been selected to provide the data. Each of the subject map and railroad network was overlapped. The study selected naturalness and diversity as major indicators and calculated weight values of the items under the indicators, which are to be usd for the selection of the sites for railway development. This assessment method could be applied to the environmentally friendly construction of railroads in the future.

A Study on the Vertical Temperature Difference of Steel Box Girder Bridge by Field Measurement (실측에 의한 강박스거더교의 상하 온도차에 대한 연구)

  • Lee, Seong-Haeng;Park, Young-Chun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.8
    • /
    • pp.545-551
    • /
    • 2018
  • For domestic application of the temperature gradient model proposed by foreign design standards, a specimen of steel box girder bridge was fabricated with the following dimensions: 2.0 m width, 2.0 m height and 3.0 m length. Temperature was measured using 24 temperature gauges during the summer of 2016. The reliability of the measured data was verified by comparing the measured air temperature with the ambient air temperature of the Korea Meteorological Administration. Of the measured gauges, four temperature gauges that can be compared with the temperature difference of the Euro code were selected and used to analyze the distribution of the measured temperatures at each point. The reference atmospheric temperature for the selection of the maximum temperature difference was determined by considering the standard error. Maximum and minimum temperatures were calculated from the four selected points and the resulting temperature difference was calculated. The model for the temperature difference in the steel box girder bridge was shown by graphing the temperature difference. Compared to the temperature distribution of the Euro code, the presented temperature difference model showed a temperature difference of $0.9^{\circ}C$ at the top and of $0.3^{\circ}$ to $0.4^{\circ}C$ at the intermediate part. These results suggested that the presented model could be considered relatively similar to the Euro code The calculated standard error coefficient was 2.71 to 2.84 times the standard error and represents a range of values. The proposed temperature difference model may be used to generate basic data for calculating the temperature difference in temperature load design.

Real-scale Accelerated Testing to Evaluate Long-term Performance for Bridge/Earthwork Transition Structure Reinforced by Geosynthetics and Cement Treated Materials (토목섬유와 시멘트처리채움재로 보강한 교량/토공 접속구조의 장기공용성 평가를 위한 실물가속시험)

  • Lee, Il-Wha;Choi, Won-Il;Cho, Kook-Hwan;Lee, Kang-Myung;Min, Kyung-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.251-259
    • /
    • 2014
  • The transition zone between an earthwork and a bridge effect to the vehicle's running stability because support stiffness of the roadbed is suddenly changed. The design criteria for the transition structure on ballast track were not particular in the past. However with the introduction of concrete track is introduced, it requires there is a higher performance level required because of maintenance and running stability. In this present paper, a transition structure reinforced with geosynthetics is suggested to improve the performance of existing bridge-earthwork transition structures. The suggested transition structure, in which there is reinforcing of the approach block using high-tension geosynthetics, has a structure similar to that of earth reinforced abutments. The utilized backfill materials are cement treated soil and gravel. These materials are used to reduce water intrusion into the approach block and to increase the recycling of surplus earth materials. An experiment was performed under the same conditions in order to allow a comparison of this new structure with the existing transition structure. Evaluation items are elastic displacement, cumulative settlement, and earth pressure. As for the results of the real-scale accelerated testing, the suggested transition structure has excellent performance for the reduction of earth pressure and settlement. Above all, it has high resistance the variation of the water content.