Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Evaluation of an Official Development Assistance (ODA) project: Focus on a forest recreation and eco-tourism site in Indonesia

  • Choi, Jaeyong;Lee, Sang-Hyuk;Hwang, Byeol
    • Korean Journal of Agricultural Science
    • /
    • v.44 no.2
    • /
    • pp.221-227
    • /
    • 2017
  • This study is the evaluation of the 'Tunak forest recreation and ecotourism development project' which will be completed in 2018 with sole source of funding from Korea. A survey was conducted to evaluate the status of the project being carried out in Lombok island, Indonesia, through the evaluation principles and criteria of the OECD Development Assistance Committee (DAC). Survey participants were stakeholders of the Official Development Assistance (ODA) project and local residents. Overall, the respondents had a good impression of this ODA project and expected they would contribute to the development of their community and region. However, respondents were not well aware of the ODA project being carried out in the Tunak region and thus more efforts should be made to help the local residents understand the positive outcome of the project and to promote the ongoing cooperation between Korea and Indonesia in the forestry sector. Results of this study showed that the projects have been effectively carried out and the impact of the project was well perceived by the recipient country. In addition, this positive perception of Korea is expected to help recreation and ecotourism business progress in the region. Therefore, we believe that the project should continue to be carried-out in the future and we expect that related companies will be able to operate on its own eventually. As it is difficult to evaluate the outcome of an ongoing project precisely, this study should be conducted again after the project completion and the results can be compared to the present results so that the effectiveness of ODA project can be more accurately determined.

Nosan.Hasuk Rural Village Development Project Base on Amenity (어메니티를 기반으로 한 노산하석권역 농촌마을 개발계획)

  • Yoon, Seong-Soo;Kim, Ji-Hyun;Rhee, Shin-Ho;Seo, Kyo;Kim, Han-Joong
    • Journal of Korean Society of Rural Planning
    • /
    • v.12 no.4 s.33
    • /
    • pp.43-51
    • /
    • 2006
  • The purpose of this study is to make a planning of Nosan Hasuk rural village development project based on rural amenity. The Nosan Hasuk rural village is located in Hyundo-Myun Cheongwon-Gun Chungcheongbuk-Do. For this study, investigate the amenity, make the bill of developing plan, and discuss the problems in rural integrated developing project. The developing plan is composed of basic planning, developing direction, village plans, and details projects. And, indicate the problems of rural integrated developing project those are the main body, standardization of investigated data, and insufficiency of detailed reference.

A Study on the PSP-Platform for the Atomicity of Distributed Ledger

  • Lee, Eun-Hee;Yoon, Yong-Ik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.5
    • /
    • pp.73-80
    • /
    • 2019
  • In Korea, a budget of tens of trillion won is put into the national R & D project every year. Thanks to these efforts, Korea's ICT industry is gaining global attention. However, there are still a lot of problems that are lacking in terms of the cycle of managing national ICT R&D projects. In particular, the issue of sharing is very insufficient throughout the cycle of the national ICT R&D. In this paper, In this paper, We propose a platfom that can be shared throughout the cycle of managing blockchain-based national ICT R&D projects. This platform we call the Perfect Sharing Project Platform (PSPP). We describe that PSPP can achieve excellent research results through information sharing of project process[1-2]. To support the perfect sharing, this platform uses a new notion of consensus algorithm, called POA (Proof of Atomicity). This platform is suitable for sharing information.

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

Influence of National Culture on Staff Preferences to Knowledge Sharing Practices: the Case of Saudi Arabia

  • Al Hazmi, Hassan S.J.;Mohamed, Sherif
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.454-458
    • /
    • 2015
  • A number of practices for sharing knowledge has been recommended in the literature. These practices, however, are considered to be applicable, universally. This assumption is challenged by this paper which empirically explores the relationship between national culture and knowledge sharing practices in the context of procuring educational buildings in Saudi Arabia. The paper reports on a research study with the aim to identify whether national culture dimensions could be significant variables that impact upon staff preferences in relation to project knowledge sharing practices. The paper critically reviews the literature to identify appropriate measures for knowledge sharing practices. It explores the means by which public sectors professional exchange project knowledge; evaluates policies and level of technical support needed to facilitate knowledge sharing, then proceeds to how employees perceive the benefits they will gain by practicing project knowledge sharing, and their role in this process. The paper tests the relationships among the research constructs based on data collected from 115 project managers responsible for the procurement of educational buildings in Saudi Arabia. The paper provides empirical evidence that the national culture has a significant influence on staff preferences. In light of the research findings the paper concludes with practical recommendations for project knowledge sharing practices that are in line with staff preferences and their cultural orientation. The recommendations should facilitate a more effective application of knowledge sharing practices.

  • PDF

Korean Small Telescope Network (소형망원경 네트워크)

  • Im, Myungshin;Kim, Yonggi;Kang, Wonseok;Lee, Chung-Uk;Lee, Heewon;Shim, Hyunjin;Sung, Hyun-Il;Ishiguro, Masateru;Kim, Seung-Lee;Kim, Taewoo;Shin, Min-Su;Yoon, Joh-Na;Woo, Jong Hak
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.44 no.2
    • /
    • pp.59.4-59.4
    • /
    • 2019
  • In this talk, we will give an overview of the small telescope network project in Korea. The small telescope network is a project in planning that would gather 0.4m-1.0m telescopes in Korea together for a common use in research and education, and the project is being led by the Optical/IR Astronomy Division of KAS. Even in the era of giant telescopes, small telescopes are still competitive for various research topics that require rapid response or long-term, steady monitoring. There are quite a few small telescopes in Korea, but the research use of these telescope has been very limited. By organizing these telescopes together, the small telescope network hopes to bring these telescopes in full operation and offer Korean astronomers competitive observational resources. In this talk, we will outline the project, describe potential resources, and several science cases such as multi-messenger astronomy, supernovae, and AGN. We will also introduce how this project might be run, with the expected operation of the small network starting at 2020.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.