• Title/Summary/Keyword: multipurpose dam

Search Result 123, Processing Time 0.025 seconds

EVALUATION OF THE WATER RESOURCES ASPECT OF THE OPERATING RESULTS OF THE DAECHEONG MULTIPURPOSE DAM

  • Noh, Jaek-young
    • Water Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.17-36
    • /
    • 2004
  • This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.

  • PDF

Estimation of Available Permit Water for Considering the Evaporation of Multipurpose Dams in Nakdong River Basin (증발량을 고려한 낙동강유역 다목적댐의 가용허가수량 추정)

  • Kim, Sun Joo;Park, Ki Chun;Park, Hee Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.3
    • /
    • pp.1-7
    • /
    • 2013
  • The dam plan quantity of constructive and water supply quantity of present time are showing a difference with change in climate and augmentation of water demand for multipurpose dams in Nakdong river basin. But revaluates a water supply ability the method or the process is official for is not taking a position, so actual condition applies the plan quantity of dam constructive. Considers various situation of actual multipurpose dam from research sees consequently and in K-WEAP is an integrated water resources evaluation plan model applies as water permit availability multipurpose dam, currently water permit availability comparison, analyzed. In this study, the natural daily flow data and apply the dimensions of the reservoir, and for more than 30 years of the long-term water balance analysis conducted by Date Nakdong river basin can supply reservoirs are large quantity of permits available is presented.

Achievements of Environmental Restoration During Multipurpose Dam Construction - In case of Wheng Seong multipurpose dam - (댐 건설과 환경복원에 대한 우리의 노력 - 강원도 횡성군 횡성다목적댐 환경복원 사례를 중심으로 -)

  • Won, Hi-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.3
    • /
    • pp.100-104
    • /
    • 2000
  • We have put considerable time and work to find a proper solution to restore the damaged natural environment due to Dam construction, and to restore the field around Dam on the basis of Environmentally Sound Sustainable Development(E.S.S.D). We've replaced the site which had been used as a equipment space with the natural-oriented park, have made a wildlife corridor for those animals which have been living in the area in a newly constructed road to in an out, and have introduced a streamside plant to organize green-space. We've received incredible favor from visitors and residents for the environment restoration. The natural-oriented park plays a role of giving the citizens to the pleasure and the comfort.

  • PDF

A Study of CFRD using a Gravel Fill (하상사력재를 이용한 CFRD의 연구)

  • Jeong, Chan-Kyun;Noh, Tae-Gil;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.842-853
    • /
    • 2008
  • In the construction of dam, the key factor which decides the type of dam is security of materials resource. Because of the large scale earth work, the ability to supply the materials is essential part about economical efficiency. The research is the case study about controlling the plan to secure the material resources in the design of Buhang multipurpose dam. In case of Buhang multipurpose dam, at that time of basic design, it was planned to use a rock fill material. From the detail investigation about the river bed accumulative layer widely spread on the submerged district on the basic design, the research is accomplished to replace rock material with gravel material. After the investigation of whole reserves of gravel material, estimation of conformity as dam construction material from analysis of grain size distribution, the case study of oversea construction, and the material property comparison between rock fill material and gravel fill material, it is verified th possibility of using the gravel fill. Thereafter, the analysis of dam stability using a gravel fill material is accomplished. Finally, A gravel fill material can be used as the main construction material of CFRD, therefore the efficiency of resource recycling in the submerged area is maximized, and the established plan is more advantageous to stability, constructibility, environmentibility than the case of using a rock fill.

  • PDF

A Investigation and Analysis of Water Temperature by Juam Regulation Dam Outflow in Downstream and Suncheon Bay (주암조절지댐 방류수에 따른 하천 및 순천만 일대 수온변화 조사분석)

  • Lee, Hyeon No;Jung, Kwan Sue;Cheon, Geun Ho;Hur, Young Teck
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.6
    • /
    • pp.501-509
    • /
    • 2015
  • Lately multipurpose dam is required to consider various interests such as quality, ecological environment as well as flood control, water supply, hydropower generation, etc. The objective of this study is to investigation and analysis of water temperature in the areas where there are social conflicts due to cold water outflow. In this study, we monitored water temperature of Juam regulation dam, downstream river, Suncheon bay in a long term period and performed comparative analysis on a change of water temperature in downstream river and Suncheon bay by using three-dimensional numerical mode (EFDC) considering various external factors such as water outflow amount. The result of monitoring and numerical modelling indicates that effects of cold water outflow takes place from april to september. Also effects of the low temperature discharge of dam was complicatedly altered by various factors such as outflow time and amount, weather and tide level conditions etc. The result of this study can be utilized as a basic data for establishing improvement of dam operation plan to minimize negative effects of dam's cold temperature water outflow to downstream river and coastal area.

Analysis of Flow Duration Characteristics due to Environmental Change in Korea River Basin (우리나라 하천유역 환경변화가 유황특성에 미치는 영향 분석)

  • Lee, Jae-Joon;Kim, Young-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.1
    • /
    • pp.67-75
    • /
    • 2011
  • The purpose of this study is to evaluate the flow duration characteristics of Nakdong, Seomjin and Geum river due to environmental change. The water level gauging stations of Nakdong, Seomjin and Geum river were selected to analyze the change of flow duration. The construction period of multipurpose dam was considered to analyze flow duration characteristics. As the result of this study, it show that ninety-five day flow, normal flow, low flow and drought flow were increased by multipurpose dam construction at all stations except a Jukpo gauging station. Especially, improved effect of flow duration in downstream part was bigger than that in upstream and midstream part. The coefficients of river regime of Nakdong, Seomjin and Geum river were decreased and also coefficients of flow duration were decreased after the multipurpose dam construction. However decline of coefficient of flow duration was smaller than coefficient of river regime because coefficient of flow duration is less affected by maximum discharge and minimum discharge than coefficient of river regime, It was confirmed that multipurpose dam on upstream and midstream has a useful effect for improving the flow duration characteristics.

Design of Emergency Spillway Using Hydraulic and Numerical Model - ImHa Multipurpose Dam (수리모형실험과 수치모의를 이용한 비상여수로 설계-임하댐)

  • Jeon, Tae-Myoung;Kim, Hyung-Il;Park, Hyung-Seop;Baek, Un-Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1726-1731
    • /
    • 2006
  • Hydraulic and numerical models were applied to design the emergency spillway of ImHa multipurpose Dam. For the numerical model, FLOW-3D was used to evaluate the three-dimensional flow in the spillway. The results of hydraulic model were compared with those of the numerical model which were separated into four zones such as approaching zone, weir zone, transition & tunnel chute zone, and dissipator zone. Moreover, for optimum design of the spillway, the hydraulic and numerical models were performed for the basic plan. Solving the problems of the basic plan, the optimized alternative design was proposed. The numerical models for various conditions of the spillway were performed, which is not always feasible in the hydraulic models. Verified by using the hydraulic models, the optimum alternative design was proposed.

  • PDF

The Life Cycle Assessment of Infrastructure considering Environmental Load;A Case Study of Emergency Spillway for Korean Multipurpose Dam (환경부하량을 고려한 토목시설물 전과정평가;국내 다목적댐 비상여수로 시설 사례연구)

  • Kwun, Suk-Hyun;Kim, Sang-Kywi;Jung, Won-Ji;Kim, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.519-522
    • /
    • 2006
  • This study aims to provide useful information when making a decision for the environmental assessment of infrastructure, based on Life Cycle Assessment(LCA). It estimates environmental load on environmental pollutants that are possible to occur by locations and by types of emergency spillway for Korean multipurpose dam, which is selected as a study case. For this purpose, this study examines the theories of LCA and calculates environmental load on environmental pollutants that generate during life cycle, to apply the suggested infrastructure to the case study of emergency spillway at the multipurpose dam. It also evaluates environmental load of emergency spillway by the estimated result, and draws the optimum alternative that is environmental friendly.

  • PDF

Estimation of Optimal Hydro-Power Supply Amount of Yongdam Multipurpose Dam for the Contract on the Free-Competition Market (자유경쟁 시장 내에서 용담다목적댐 발전소의 최적 계약가능 공급량 평가)

  • Yoo, Ju-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.1
    • /
    • pp.25-35
    • /
    • 2005
  • Nowaday the amount of water resource to generate the hydro-power energy has decreased as that of the water supply has increased. In case that the national market of the energy will be in free competition, the energy producer need to suggest the amount of the optimal supply with the hydrological reliability for a deal. In this study the optimal reservoir operation was performed by the linear programming and the optimal reliabilities of inflows and the power supply were obtained by the one dimensional search technique to estimate the energy with the optimal inflow reliability which the power system of the Yongdam multipurpose dam in Geum river can produce. And the main results were presented.