EVALUATION OF THE WATER RESOURCES ASPECT OF THE OPERATING RESULTS OF THE DAECHEONG MULTIPURPOSE DAM

  • Noh, Jaek-young (Department of Rural Infrastructure Engineering, Chungnam National University)
  • Published : 2004.01.01

Abstract

This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.

Keywords

References

  1. Ministry of Construction and Transportation (2000). Water Vision 2020
  2. Korea Water Resources Corporation (1996). Development of real time operating system for managing low flows in the Nakdong riverbasin
  3. Kim, C.G. and Kim, H.J. (2003). 'Application of SWAT model to Gyeongancheon watershed for estimating stream flows and sediment yields.' Proceedings 2003 of Korean Society of Agricultural Engineers, Jeju Korea, pp. 527-530
  4. Kim, H.J. (2001). Development two parametric hyperbolic model for daily streamflow simulation. Ph. D. dissertation, Seoul National University, Seoul, Korea
  5. Kim, S.J. and Noh, J.K. (2000). 'Development of a decision support system for reservoir sizing.' Journal of the Korean Society of Agricultural Engineers, Vol. 42, pp. 17-23
  6. Lee, S.H., Ahn, T.J., Yun, B.M., and Shim, M.P. (2003). 'A tank model application to Soyanggang dam and Chungju dam with snow accumulation and snow melt.' Journal of Korea Water Resources Association, Vol. 36, No. 5, pp. 851-862
  7. Noh, J.K. (1991) A conceptual watershed model for daily streamflow based on soil water storage. Ph. D. dissertation, Seoul National University, Seoul, Korea
  8. Noh, J.K. (1999). 'Development of system for simulating daily runoff by DAWAST model.' Proceedings 1999 of Korea Water Resources Association, Seoul, Korea, pp. 69-74
  9. Noh, J.K. (2000)'Effect of increasing water supply capacity of reservoir from limiting water supply.' Proceedings 2000 of Korean Society of Civil Engineers, Yongpyoung, Korea, Vol. 3, pp. 432-435
  10. Noh, J.K., Lee, H.S., and Jin, Y.S. (2003a). 'Development of model for simulating daily water storage in estuary barrage dam.' Proceedings 2003 of Korean Society of Agricultural Engineers, Jeju, Korea, pp. 495-498
  11. Noh, J.K., Lee, J.Y., and Jin, Y.S. (2003b). 'Return flows considered DAWAST model.' Proceedings 2003 of Korean Society of Agricultural Engineers, Jeju, Korea, pp. 503-506
  12. Noh, J.K. and Ko, I.H. (2003). 'Development of model for estimating daily paddy water requirements to simulate daily streamflow.' Proceedings 2003 of Korean Society of Agricultural Engineers, Jeju, Korea, pp. 435-438