Browse > Article
http://dx.doi.org/10.3741/JKWRA.2005.38.1.025

Estimation of Optimal Hydro-Power Supply Amount of Yongdam Multipurpose Dam for the Contract on the Free-Competition Market  

Yoo, Ju-Hwan (영동대학교 건설계열 토목환경공학과)
Publication Information
Journal of Korea Water Resources Association / v.38, no.1, 2005 , pp. 25-35 More about this Journal
Abstract
Nowaday the amount of water resource to generate the hydro-power energy has decreased as that of the water supply has increased. In case that the national market of the energy will be in free competition, the energy producer need to suggest the amount of the optimal supply with the hydrological reliability for a deal. In this study the optimal reservoir operation was performed by the linear programming and the optimal reliabilities of inflows and the power supply were obtained by the one dimensional search technique to estimate the energy with the optimal inflow reliability which the power system of the Yongdam multipurpose dam in Geum river can produce. And the main results were presented.
Keywords
Yongdam multipurpose dam; hydro-power; hydro-energy supply contract; linear programming; inflow reliability;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Askew, A.J. (1974b). 'Chance-constrained dynamic programming and the optimization of water resource systems.' Water Resources Research, Vol. 10, No.6, pp. 1099-1106   DOI
2 Colorni, A. and Fronza, G. (1976). 'Reservoir management via reliability programming.' Water Resources Research, Vol. 12, No. 1, pp. 85-88   DOI
3 Simonovic, S.P. and Manrino, M.A. (1980). 'Reliability programing in reservoir management 1. single multipurpose reservoir.' Water Resources Research, Vol. 16, No. 5, pp. 844-848   DOI
4 유주환, 김재한, 정관수 (1999). '한강수계 복합저수지 시스템의 최적 수력발전운영을 위한 Linear Tracking의 적용.' 한국수자원학회논문집, 제32권, 제5호, pp. 579-591   과학기술학회마을
5 Askew, A.J. (1975). 'Use of risk premium in chance-constrained dynamic porgramming.' Water Resources Research, Vol. 11, No.6, pp. 862-866   DOI
6 Lee, Han-Lin and Brill, E.D. (1987). Reliability of reservoir operation under hydrologic uncertainty. Water Resources Center, University of Illinois at Urbana Champaign, Research Report, No. 207
7 ReVelle, C., Joeres, E. and Kirby, W. (1969). 'The linear decision rule in reservoir management and design, 1. development of the stochastic model.' Water Resources Research, Vol. 5, No. 4, pp. 767-777   DOI
8 Askew, A.J. (1974a). 'Optimum reservoir operating policies and the imposition of a reliability constraint.' Water Resources Research, Vol. 10, No. 1, pp. 51-56   DOI
9 유주환 (1999). '금강수계 수위-유량곡선 개발 및 적용.' 대한토목학회논문집, 제19권, 제II-6호, pp. 665-675
10 유주환, 박창근, 조효섭 (2001). '평화의 댐 홍수지체 효과에 따른 화천댐 계통 이수 능력의 증대에 대한 검정.' 한국수자원학회논문집, 제34권, 제6호, pp. 617-625   과학기술학회마을
11 한국건설기술연구원 (1996). 수자원장기종합계획(1997-2001) 부록 수자원자료집
12 한국수자원공사 (1990). 용담다목적댐 타당성조사보고서, 건설부
13 한국수자원공사 (1991). 용담다목적댐 건설사업 실시 설계 보고서, 건설부
14 한국수자원공사 (1995-2000). 용담다목적댐 건설 업무 자료집, 용담댐건설단
15 건설부 (1989). 전주권 2단계지역 개발사업 타당성조사 용담수원개발 방안조사 보고서
16 권오헌, 유주환 (1993). '저수지 유입량의 신뢰도를 고려한 최적계약 전력량의 결정.' 대한토목학회논문집, 제13권, 제2호, pp. 141-149
17 김주철, 유주환, 김재환, 정관수 (2002). '금강수계 다목적 저수지 유입량의 신뢰도 분석.' 한국수자원학회학술발표논문집, pp. 733-738
18 안태진, 류희정, 박정웅 (1999). '최적화기법을 이용한 기존 농업용 저수지에서의 부존 수력발전량 추정.' 한국수자원학회논문집, 제32권, 제3호, pp. 281-289   과학기술학회마을