• Title/Summary/Keyword: multi-method assessment

Search Result 359, Processing Time 0.034 seconds

Development of logical structure for multi-unit probabilistic safety assessment

  • Lim, Ho-Gon;Kim, Dong-San;Han, Sang Hoon;Yang, Joon Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1210-1216
    • /
    • 2018
  • Site or multi-unit (MU) risk assessment has been a major issue in the field of nuclear safety study since the Fukushima accident in 2011. There have been few methods or experiences for MU risk assessment because the Fukushima accident was the first real MU accident and before the accident, there was little expectation of the possibility that an MU accident will occur. In addition to the lack of experience of MU risk assessment, since an MU nuclear power plant site is usually very complex to analyze as a whole, it was considered that a systematic method such as probabilistic safety assessment (PSA) is difficult to apply to MU risk assessment. This paper proposes a new MU risk assessment methodology by using the conventional PSA methodology which is widely used in nuclear power plant risk assessment. The logical failure structure of a site with multiple units is suggested from the definition of site risk, and a decomposition method is applied to identify specific MU failure scenarios.

Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Cho, Jaehyun;Han, Sang Hoon;Kim, Dong-San;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1234-1245
    • /
    • 2018
  • The risk of multi-unit nuclear power plants (NPPs) at a site has received considerable critical attention recently. However, current probabilistic safety assessment (PSA) procedures and computer code do not support multi-unit PSA because the traditional PSA structure is mostly used for the quantification of single-unit NPP risk. In this study, the main purpose is to develop a multi-unit Level 2 PSA method and apply it to full-power operating six-unit OPR1000. Multi-unit Level 2 PSA method consists of three steps: (1) development of single-unit Level 2 PSA; (2) extracting the mapping data from plant damage state to source term category; and (3) combining multi-unit Level 1 PSA results and mapping fractions. By applying developed multi-unit Level 2 PSA method into six-unit OPR1000, site containment failure probabilities in case of loss of ultimate heat sink, loss of off-site power, tsunami, and seismic event were quantified.

A robust multi-objective localized outrigger layout assessment model under variable connecting control node and space deposition

  • Lee, Dongkyu;Lee, Jaehong;Kang, Joowon
    • Steel and Composite Structures
    • /
    • v.33 no.6
    • /
    • pp.767-776
    • /
    • 2019
  • In this article, a simple and robust multi-objective assessment method to control design angles and node positions connected among steel outrigger truss members is proposed to approve both structural safety and economical cost. For given outrigger member layouts, the present method utilizes general-purpose prototypes of outrigger members, having resistance to withstand lateral load effects directly applied to tall buildings, which conform to variable connecting node and design space deposition. Outrigger layouts are set into several initial design conditions of height to width of an arbitrary given design space, i.e., variable design space. And then they are assessed in terms of a proposed multi-objective function optimizing both minimal total displacement and material quantity subjected to design impact factor indicating the importance of objectives. To evaluate the proposed multi-objective function, an analysis model uses a modified Maxwell-Mohr method, and an optimization model is defined by a ground structure assuming arbitrary discrete straight members. It provides a new robust assessment model from a local design point of view, as it may produce specific optimal prototypes of outrigger layouts corresponding to arbitrary height and width ratio of design space. Numerical examples verify the validity and robustness of the present assessment method for controlling prototypes of outrigger truss members considering a multi-objective optimization achieving structural safety and material cost.

A Method to Calculate Off-site Radionuclide Concentration for Multi-unit Nuclear Power Plant Accident (다수기 원자력발전소 사고 시 소외 방사성물질 농도 계산 방법)

  • Lee, Hye Rin;Lee, Gee Man;Jung, Woo Sik
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.6
    • /
    • pp.144-156
    • /
    • 2018
  • Level 3 Probabilistic Safety Assessment (PSA) is performed for the risk assessment that calculates radioactive material dispersion to the environment. This risk assessment is performed with a tool of MELCOR Accident Consequence Code System (MACCS2 or WinMACCS). For the off-site consequence analysis of multi-unit nuclear power plant (NPP) accident, the single location (Center Of Mass, COM) method has been usually adopted with the assumption that all the NPPs in the nuclear site are located at the same COM point. It was well known that this COM calculation can lead to underestimated or overestimated radionuclide concentration. In order to overcome this underestimation or overestimation of radionuclide concentrations in the COM method, Multiple Location (ML) method was developed in this study. The radionuclide concentrations for the individual NPPs are separately calculated, and they are summed at every location in the nuclear site by the post-processing of radionuclide concentrations that is based on two-dimensional Gaussian Plume equations. In order to demonstrate the efficiency of the ML method, radionuclide concentrations were calculated for the six-unit NPP site, radionuclide concentrations of the ML method were compared with those by COM method. This comparison was performed for conditions of constant weather, yearly weather in Korea, and four seasons, and the results were discussed. This new ML method (1) improves accuracy of radionuclide concentrations when multi-unit NPP accident occurs, (2) calculates realistic atmospheric dispersion of radionuclides under various weather conditions, and finally (3) supports off-site emergency plan optimization. It is recommended that this new method be applied to the risk assessment of multi-unit NPP accident. This new method drastically improves the accuracy of radionuclide concentrations at the locations adjacent to or very close to NPPs. This ML method has a great strength over the COM method when people live near nuclear site, since it provides accurate radionuclide concentrations or radiation doses.

Development of MURCC code for the efficient multi-unit level 3 probabilistic safety assessment

  • Jung, Woo Sik;Lee, Hye Rin;Kim, Jae-Ryang;Lee, Gee Man
    • Nuclear Engineering and Technology
    • /
    • v.52 no.10
    • /
    • pp.2221-2229
    • /
    • 2020
  • After the Fukushima Daiichi nuclear power plant (NPP) accident, level 3 probabilistic safety assessment (PSA) has emerged as an important task in order to assess the risk level of the multi-unit NPPs in a single nuclear site. Accurate calculation of the radionuclide concentrations and exposure doses to the public is required if a nuclear site has multi-unit NPPs and large number of people live near NPPs. So, there has been a great need to develop a new method or procedure for the fast and accurate offsite consequence calculation for the multi-unit NPP accident analysis. Since the multi-unit level 3 PSA is being currently performed assuming that all the NPPs are located at the same position such as a center of mass (COM) or base NPP position, radionuclide concentrations or exposure doses near NPPs can be drastically distorted depending on the locations, multi-unit NPP alignment, and the wind direction. In order to overcome this disadvantage of the COM method, the idea of a new multiple location (ML) method was proposed and implemented into a new tool MURCC (multi-unit radiological consequence calculator). Furthermore, the MURCC code was further improved for the multi-unit level 3 PSA that has the arbitrary number of multi-unit NPPs. The objectives of this study are to (1) qualitatively and quantitatively compare COM and ML methods, and (2) demonstrate the strength and efficiency of the ML method. The strength of the ML method was demonstrated by the applications to the multi-unit long-term station blackout (LTSBO) accidents at the four-unit Vogtle NPPs. Thus, it is strongly recommended that this ML method be employed for the offsite consequence analysis of the multi-unit NPP accidents.

Analyzing the Weight of Assessment Criteria in Korea Green Building Certification System - Focused on Certification Standards for Multi-unit Apartment Projects - (국내 친환경 건축물 인증제도 평가항목의 중요도 분석 - 공동주택 인증심사기준 중심으로 -)

  • Choi, Yeo-Jin;Lhee, Sang-Choon
    • KIEAE Journal
    • /
    • v.12 no.1
    • /
    • pp.83-90
    • /
    • 2012
  • Over the world, social demands and concerns of energy and resource depletions and environmental conservation have resulted in many researches and applications on sustainable development and construction. In order to support these demands and concerns, international green building certification systems such as LEED(Leadership in Energy and Environmental Design) and BREEAM(Building Research Establishment Environmental Assessment Method) were developed. In Korea, the green building certification system was introduced in 2000 and widely applied to all types of new buildings in order to induce the diffusion of sustainable buildings on May, 2010. This paper investigates the importance of assessment criteria on multi-unit apartment projects among certification rating systems using the AHP(Analytic Hierarchy Process) method and suggests a new direction on certification assessment standards. For applying the AHP method, the survey of staffs in green building certification consulting companies and architectural design companies was conducted via e-mail. As a result, criteria like energy, indoor environment, land use, pollution control, and ecological environment among 9 main ones turned out important on assessing green building certification at multi-unit apartment projects, while criteria like water resource, transportation, maintenance management, and material and resource did relatively unimportant.

On a Risk Assessment Methodology based on the Technology Readiness Levels, Degrees of Difficulty, and Technology Need Values in the Development of Naval Surface Ships (수상함 개발에서 기술성숙도, 난이도 및 중요도 기반의 위험도 평가 방안)

  • Kim, Kyong-Hwan;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.151-158
    • /
    • 2012
  • The objective of this paper is to propose a method of how to perform risk assessment in the early stage of defense research and development for the acquisition of weapon systems. An advanced method for risk assessment and its associated objective functions are developed first based on the concept of systems engineering. The developed method is then applied to carry out the analysis of alternatives in the trade-off environments. As a case study, the multi-purpose training ship is considered, where it is performed using the notions of technology readiness levels, degrees of difficulty, and technology need values to facilitate design space visualization and decision maker interaction. It is noted that decision makers can benefit from our approach as an improved risk assessment method in the context of multi-criteria decision making.

Probability subtraction method for accurate quantification of seismic multi-unit probabilistic safety assessment

  • Park, Seong Kyu;Jung, Woo Sik
    • Nuclear Engineering and Technology
    • /
    • v.53 no.4
    • /
    • pp.1146-1156
    • /
    • 2021
  • Single-unit probabilistic safety assessment (SUPSA) has complex Boolean logic equations for accident sequences. Multi-unit probabilistic safety assessment (MUPSA) model is developed by revising and combining SUPSA models in order to reflect plant state combinations (PSCs). These PSCs represent combinations of core damage and non-core damage states of nuclear power plants (NPPs). Since all these Boolean logic equations have complemented gates (not gates), it is not easy to generate exact Boolean solutions. Delete-term approximation method (DTAM) has been widely applied for generating approximate minimal cut sets (MCSs) from the complex Boolean logic equations with complemented gates. By applying DTAM, approximate conditional core damage probability (CCDP) has been calculated in SUPSA and MUPSA. It was found that CCDP calculated by DTAM was overestimated when complemented gates have non-rare events. Especially, the CCDP overestimation drastically increases if seismic SUPSA or MUPSA has complemented gates with many non-rare events. The objective of this study is to suggest a new quantification method named probability subtraction method (PSM) that replaces DTAM. The PSM calculates accurate CCDP even when SUPSA or MUPSA has complemented gates with many non-rare events. In this paper, the PSM is explained, and the accuracy of the PSM is validated by its applications to a few MUPSAs.

Practical Measurement on Education Outcome Through Multi-Evaluations (다면적 평가를 통한 교육성과 평가도구 개발 및 분석연구)

  • Baik, Ran
    • Journal of Engineering Education Research
    • /
    • v.15 no.6
    • /
    • pp.98-102
    • /
    • 2012
  • This paper diagnose subjects and measures the learning ability of students based on the goal of developing an assessment tool for education productivity based on multi-aspect evaluation conducted by ICEE at Honam University. Furthermore, develop an assessment tool for education productivity that provides a motive to bring detailed improvements in teaching methods through the diagnosis. In addition, a method for compensating the issues and improving the quality of subject is suggested to develop learning ability of students through applying the assessment tool. An integrated operated system of CQI is desired to be built along with quality improvement of education through measuring academic quality by studying the methods for enhancing academic and learning ability achievement from analysis of the curriculum provided in the "ABEEK program". Through this study the current state of education productivity is presented through analyzing the difference between students who participated in the "ABEEK program" and who did not participate, and operating a comparison between the student's comprehension on their majors and liberal arts by the multi-aspect evaluation that has been conducted for 2 years.

Damage detection in truss bridges using vibration based multi-criteria approach

  • Shih, H.W.;Thambiratnam, D.P.;Chan, T.H.T.
    • Structural Engineering and Mechanics
    • /
    • v.39 no.2
    • /
    • pp.187-206
    • /
    • 2011
  • This paper uses dynamic computer simulation techniques to develop and apply a multi-criteria procedure using non-destructive vibration-based parameters for damage assessment in truss bridges. In addition to changes in natural frequencies, this procedure incorporates two parameters, namely the modal flexibility and the modal strain energy. Using the numerically simulated modal data obtained through finite element analysis of the healthy and damaged bridge models, algorithms based on modal flexibility and modal strain energy changes before and after damage are obtained and used as the indices for the assessment of structural health state. The application of the two proposed parameters to truss-type structures is limited in the literature. The proposed multi-criteria based damage assessment procedure is therefore developed and applied to truss bridges. The application of the approach is demonstrated through numerical simulation studies of a single-span simply supported truss bridge with eight damage scenarios corresponding to different types of deck and truss damage. Results show that the proposed multi-criteria method is effective in damage assessment in this type of bridge superstructure.