• 제목/요약/키워드: multi project

검색결과 766건 처리시간 0.058초

제1회 논 농업지역에 있어서 농공기술자 육성에 관한 국제회의 및 제3회 WWF 프리-심포지엄 : "아시아 몬순 지역의 논의 다원적 역할" (Report of Participation in The First International Conference on Educational Accreditation System and APEC Engineers Project for Agricultural Engineering in Paddy-Farming Regions and The 3rd World Water Forum(WWF3)Pre-symposium: "Multi-functional Roles of Paddy Field Irrigation in the Asia Monsoon Region")

  • 이근후;박종민
    • 한국농공학회지
    • /
    • 제44권3호
    • /
    • pp.8-18
    • /
    • 2002

R&D 프로젝트 투자 의사결정을 위한 실물옵션 의사결정나무 모델 (Real Option Decision Tree Models for R&D Project Investment)

  • 최경현;조대명;정영기
    • 산업공학
    • /
    • 제24권4호
    • /
    • pp.408-419
    • /
    • 2011
  • R&D is a foundation for new business chance and productivity improvement leading to enormous expense and a long-term multi-step process. During the R&D process, decision-makers are confused due to the various future uncertainties that influence economic and technical success of the R&D projects. For these reasons, several decision-making models for R&D project investment have been suggested; they are based on traditional methods such as Discounted Cash Flow (DCF), Decision Tree Analysis (DTA) and Real Option Analysis (ROA) or some fusion forms of the traditional methods. However, almost of the models have constraints in practical use owing to limits on application, procedural complexity and incomplete reflection of the uncertainties. In this study, to make the constraints minimized, we propose a new model named Real Option Decision Tree Model which is a conceptual combination form of ROA and DTA. With this model, it is possible for the decision-makers to simulate the project value applying the uncertainties onto the decision making nodes.

SEISMIC ISOLATION OF LEAD-COOLED REACTORS: THE EUROPEAN PROJECT SILER

  • Forni, Massimo;Poggianti, Alessandro;Scipinotti, Riccardo;Dusi, Alberto;Manzoni, Elena
    • Nuclear Engineering and Technology
    • /
    • 제46권5호
    • /
    • pp.595-604
    • /
    • 2014
  • SILER (Seismic-Initiated event risk mitigation in LEad-cooled Reactors) is a Collaborative Project, partially funded by the European Commission in the $7^{th}$ Framework Programme, aimed at studying the risk associated to seismic-initiated events in Generation IV Heavy Liquid Metal reactors, and developing adequate protection measures. The project started in October 2011, and will run for a duration of three years. The attention of SILER is focused on the evaluation of the effects of earthquakes, with particular regards to beyond-design seismic events, and to the identification of mitigation strategies, acting both on structures and components design. Special efforts are devoted to the development of seismic isolation devices and related interface components. Two reference designs, at the state of development available at the beginning of the project and coming from the $6^{th}$ Framework Programme, have been considered: ELSY (European Lead Fast Reactor) for the Lead Fast Reactors (LFR), and MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) for the Accelerator-Driven Systems (ADS). This paper describes the main activities and results obtained so far, paying particular attention to the development of seismic isolators, and the interface components which must be installed between the isolated reactor building and the non-isolated parts of the plant, such as the pipe expansion joints and the joint-cover of the seismic gap.

Understanding Technology-Enhanced Construction Project Delivery: perspective from expansive learning and adaptive expertise

  • Sackey, Enoch;Kwadzo, Dzifa A.M.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.26-38
    • /
    • 2017
  • The architecture, engineering, and construction (AEC) industry is yet to formulate a holistic strategy to realign the evolving technological infrastructures with organisational ambitions and adaptive knowledge of the workforce. This study attempts to create an understanding of the underlying processes adopted by technology-enhanced construction organisations to disseminate and maintain knowledge within the workforce in order to keep pace with the evolving construction technologies. The study adopted expansive learning and adaptive expertise constructs to help better explain workplace learning support structures for organisational effectiveness in a turbulent situation. The two theories were tailored to empirically evaluate three case study construction organisations that have embarked on technology-enabled organisational changes. The study concluded on the creation of a facilitating workplace learning environment to enable the workforce to adapt into and resolve any inherent contradictions and cognitive ambiguities of the changing organisational conditions. This could ensure that novel and conflicting features of the emerging technologies can be adapted across the myriad multi-functional project activities in order to expand the frontiers of the technological capabilities to address the eminent issues confronting the AEC sector.

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

21세기 신 에너지 가스 하이드레이트 연구 및 기술개발 현황 : 국내의 중장기 개발 방향 (An overview of R&D for the natural gas hydrate of new energy in the 21st century : a vision of the multi-year project in Korea)

  • 이영철;백영순;조병학;박기환;류병재
    • 한국석유지질학회지
    • /
    • 제7권1_2
    • /
    • pp.19-27
    • /
    • 1999
  • 에너지 자원의 빈국인 한국은 에너지 자원의 기본적인 사용량 중에서 절대적인 양을 차지하는 석유 및 천연가스를 $100{\%}$수입에 의존하고 있다. 정부가 유사시 즉각적으로 실시하여야 할 중요한 역할 중의 하나가 이와 같은 유용한 에너지 자원을 다양하게 확보하는 것이다. 가스 하이드레이트는 천연가스와 다론 형태의 에너지로서 그 매장량이 해양이나 영구동토지역 등 전세계적으로 분포되어 있으므로 가까운 미래의 천연가스 대체 자원으로서 주목을 받고 있다. 특히 한반도 주변의 동해에 많은 양의 가스 하이드레이트가 매장되어 있을 것으로 기대된다 따라서 이 논문에서는 국내외 연구 및 기술개발 동향을 검토하여 탄성파 탐사를 통한 해석, 가스 하이드레이트의 특성 및 물리적인 물성, 그리고 가스 하이드레이트의 활용 기술 등에 관련된 국내의 중장기적인 가스 하이드레이트의 기본적인 연구 및 기술개발에 대하여 전체적인 프로젝트의 개요를 설명하였다.

  • PDF

PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석 (The Effect of PMIS Quality on Project Management Success)

  • 이슬기;이형락;유정호
    • 한국건축시공학회지
    • /
    • 제10권6호
    • /
    • pp.117-126
    • /
    • 2010
  • 건설 PMIS(Project Management Information System, 이하 PMIS)는 과거의 업무보조 수단에서 벗어나 프로젝트의 성공을 위한 필수적인 도구 중의 하나로 인식되고 있다. 하지만 정보관리시스템 구축 목표와 전략 부재로 인해 투자비 규모 설정은 물론 파급영향에 대한 기대감 상실로 정보화 노력이 일시적 현상에 그치고 있다. 이는 정보화 투자 대비 효과에 대한 검증이 부족하여 정보화를 추진하는데 있어 동기 부여가 되지 못하기 때문이다. 따라서 본 연구에서는 PMIS의 품질요인과 프로젝트 관리의 성공 간에 영향관계를 파악하는 것이 목적이다. 건설 프로젝트 관리의 성공요인, 정보시스템 품질평가 및 성공모델 도출에 대한 기존 문헌고찰을 통해 프로젝트관리의 성공과 PMIS의 품질을 측정하기 위한 평가항목을 구성하였으며 실제 PMIS의 사용자인 시공사, 사업관리자(Construction Manager, 이하 CM)를 대상으로 설문조사를 실시하였다. 이렇게 수집된 자료들로 통계프로그램인 SPSS 12.0을 활용하여 다중회귀분석을 통해 건설 사업에서 PMIS의 품질요인과 프로젝트 관리의 성공간의 영향관계를 분석하고 시사점을 도출하였다.

적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안 (Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.